The subcontractor claim portal

Where a subcontractor submits a progress claim against their order.

What it is

An awarded subcontractor gets one link for the whole engagement. Your business name and logo head the page, and a Compliance · Payment claims switch at the top moves between its two jobs. It opens on Compliance documents, where they upload their SWMS, public liability insurance and workers compensation certificate and add the workers who will sign in at the gate and their tickets. Payment claims shows their contract value, what you have certified to date and the retention rate, takes the amount they are claiming for the period, and lists every claim on the job with your answer against it. The same link is where they come back to see your payment schedule.

The link lasts 30 days. The Base portal does the same jobs under one sign-in that does not expire, across every job they have with you and with any other builder on Base. Awarding them shares it with the same address.

Before you start

  • The sub must be engaged on a won job. The link is emailed when you award them on the job's Subcontractors page (Award & request docs) or on the Tenders page, when a job with engaged subs is marked won, or when you ask the assistant to engage them. It goes to the company's primary contact, else the company email. Resend compliance link on the Subcontractors page sends a fresh one; earlier links stop working and the date you first asked is kept.
  • The link lasts 30 days and is the credential: whoever holds it can upload documents and lodge claims in that company's name, so the sub should keep it in their office. An expired link tells them to ask you for a fresh one.
  • Nothing on this portal certifies or pays. A claim arrives as received; a person in your business certifies or queries it on the job's Subcontractor claims page.

How to

  1. Your business name and logo, then the Compliance · Payment claims switch.
  2. Compliance documents: "[Your business] needs these before you start on" the job, and the company it is for. Three rows: SWMS, Public liability insurance and Workcover. A row already filled shows On file with the file name and expiry date (for example "expires Fri 6 Nov"); one past its expiry shows Expired. Insurance and workcover need an expiry date to upload; the SWMS is for this job, the other two are for the company.
  3. Your workers: "Add each person who will sign in at the site, with the mobile they sign in with, and upload their white card and tickets. An expired white card on file stops that person at the gate." Each worker is a row with their tickets under their name, and Add a worker sits at the bottom.

Upload a compliance document (the subcontractor)

  1. In the row, press Choose file (or Replace) and pick a PDF or image under 20 MB.
  2. For insurance or workcover, pick the Expiry date printed on the certificate from the calendar that appears once a file is chosen. It is required: Upload stays greyed out, with "Pick the expiry date shown on the certificate to upload it.", until a date is picked. A SWMS needs none.
  3. Press Upload, which appears once a file is chosen. The row shows On file. The document is filed against the company (or the job, for the SWMS) and its expiry drives the compliance tones you see on the Subcontractors page, the reminders before it runs out and the gate check at sign-in. On your Subcontractors page the card shows it as On file — check it and verify until someone checks it and presses Verify.

Add workers and tickets (the subcontractor)

  1. Under Add a worker, type the worker's Full name and Mobile and press Add worker. The mobile is the number that person signs in with at the gate.
  2. On a worker, press Add ticket, choose or type the ticket type (White Card, EWP, Working at heights, First aid and so on), pick an expiry from the calendar if it has one, press Photo or PDF to choose the file and then Upload. Tickets list under the worker with their expiry date; an expired one says so in red.

Lodge a payment claim (the subcontractor)

  1. Press Payment claims at the top. The page names the job and your business as the one the claim goes to, with their company and trade, and, when a contract value is on the engagement, one band of three figures: Contract, Certified (to date) and Retention (the rate, and what you hold). The contract and certified figures say ex GST under them.
  2. Enter Amount claimed (ex GST) ("12,500" and "$12,500" both read as 12500), pick a Period ending date from the calendar, and write What the claim covers. Attach their claim or invoice as a Claim PDF if they have one (PDF only, under 20 MB).
  3. Press Lodge claim. The page confirms "Claim #3 lodged — $12,500 ex GST" and, when a statutory window applies, that your payment schedule is due by a date (for example "Fri 6 Nov"). Lodge another claim clears the form.
  4. Claims on this job lists every claim: number, period or lodged date, amount, and its status: Awaiting assessment, Certified, Queried or Paid. A certified amount different from the claim shows as "$12,500 → $11,000". Once you issue a payment schedule, the line says when it was issued, under which Act, the scheduled amount and your reasons when it is less than claimed.

What happens on its own

  • Opening the link is recorded; the first upload marks the request submitted.
  • Each upload raises a compliance event your automations can react to. A claim raises subcontractor claim received with its number, amount, period and response due date.
  • The claim's response due date is set from the claim time and the Security of Payment window for the job's state (or your business default).
  • A claim PDF is filed in the job's documents as an invoice from that subcontractor, beside the claim.
  • The assistant can assess a new claim against the engagement, orders and site progress and propose a certified amount with reasons for you to act on. That automation is installed paused; turn it on under Automations → Subscriptions. It never certifies or pays.

Things that surprise people

  • The sub's amounts are ex GST, and the portal says so on the field. What they are owed inc GST is worked out on your side when you certify.
  • Certified to date on their page counts certified and paid claims only. A queried claim does not move it.
  • The sub never sees your internal notes, the purchase order or the gate compliance detail. A blocked worker at the gate is told only that the company's documents need updating and to talk to the supervisor.
  • An expired white card uploaded here blocks that worker at the gate. A missing one does not block; it warns the supervisor.
  • A claim or document cannot be deleted from the portal. A wrong claim is sorted out on your Subcontractor claims page.
  • Payment schedules are sent to the sub's primary contact by email, and the portal line says so; the schedule itself is not downloadable from the portal.
  • Your business name and logo come from your organisation settings. With no logo, the page shows your business's first letter beside the name.
  • An upload, a worker or a claim that does not go through says so in plain words and keeps what they typed; a link that has expired tells them to ask you for a fresh one.