In this guide

What changed

User-facing changes to Base, newest first. One line per change, in the reader's words.

A line for every change a customer can see, newest first. Internal work, refactors and fixes nobody would notice are not listed.

November 2026

  • 25 Nov — Typing a margin keeps every digit. Typing 10 into a margin, labour margin, subcontract markup or contingency box could leave 1 in it: the page put the first keystroke's saved value back while you were still typing. A box you are typing in now keeps what you typed, and the last figure is the one saved.

  • 25 Nov — A job without a margin says so. The estimate used to show a 10% margin on a job that had none set, while the quote priced it at cost, so the two disagreed. The global margin box now reads not set — prices at cost until you type one, and the estimate, quote and exports agree. The New project form also now shows why a project could not be created (for example, a job with that name already exists) instead of returning to the form without saying.

  • 25 Nov — Keep an option on the estimate but out of the price. A line's ⋮ menu now has Exclude from price (and Include in price to undo it), and the assistant can do the same when you ask. Before, nothing could mark one line as an option: the assistant offered to delete it or give it a section of its own.

  • 25 Nov — New figures on a document without losing your edits. A draft you come back to tells you when the estimate has changed since it was filled, and Refresh figures fills the prices, totals and dates again while keeping every wording change you and the assistant made. Discarding a draft no longer throws those changes away either: the next draft of the same document on the same job puts them back. Questions you already answered on an earlier draft (keep the Qty column, keep the cover title) are not asked again, a message you type while the assistant is filling gets an answer in words, and a draft discarded while the assistant was working is reported as discarded instead of as a permissions error.

  • 25 Nov — The quote's total is the estimate's sell price. A section's contingency now goes on the quote, the brochure and the job's value as it does on the estimate page, folded into the section's lines so no contingency line appears. A line marked excluded no longer counts on the estimate page either: it shows a grey Excluded tag and is left out of its section and the totals, as the quote always left it out. A priced bill of quantities now prints the quote's sell rates and adds up to the quote; before, it printed your cost. Renaming or splitting a section keeps its margins and contingency, and a section margin the assistant sets lands on the section your lines are in, or it asks which section you mean.

  • 25 Nov — Lines in order, and a way back from big changes. Ask the assistant to sort a section, or every section, by item code (J01, J01a, J1.2, J2 · CW09b before CW10) or by drawing, or in an order you give, and it does the whole section in one go; levels and units stay together. Lines from a take-off now land in code order, and quotes, bills of quantities, RFQs, scopes and purchase orders print lines in the estimate's order. Before a big change to an estimate that already has lines (a take-off over it, adding 20+ lines, deleting 10+), the assistant saves a restore point in Revision history and tells you, so the old estimate is one Restore away. A delete lists every line it removed. A take-off that counts every item as 1 is sent back to be recounted, and a joinery section renamed "Level 1" is still checked as joinery.

  • 25 Nov — No two live jobs with the same name. Creating a job, or duplicating one, with the name of a job you already have is refused, naming the job it matches. When you ask the assistant for a genuinely separate job with the same name, it numbers it ("… (2)") and tells you. Existing jobs keep their names.

  • 25 Nov — The same change on a job's (offshore) and (Local) copies, in one ask. Ask "do the same on the (Local) one" and the assistant starts a thread for each copy that works on that copy only and reports back here. Work for another job that the assistant hands off now always opens on that job, not on this chat's. Saying "move this chat to it" when you ask for a new job moves the chat to it, and the assistant no longer says a chat moved when it did not.

  • 25 Nov — The assistant says when it did not do or read what it says it did. If it types out a change instead of making it, it is asked once to make it properly, and if it still doesn't, the reply says nothing was done. If a drawing page it tried to read came back empty, or a change matched no line, the reply ends with a Not read: or Not saved: line naming what. It no longer files a rate under a made-up entry: a rate it cannot match to the entry it named is refused rather than starting a new one.

  • 25 Nov — Add a quote you got outside Base. Tendered a trade by email yourself? Drop the subbie's or supplier's quote on the Tenders page (Got a quote from outside Base?), choose Upload existing quote… from a trade's menu on the estimate, or drop it in chat. Base reads the business, the price ex GST and the trade, you check it, and it joins that trade's tenders to compare, award or carry onto the estimate at your subcontract markup. Base never emails these quotes: no chase, no updated drawings, no "unsuccessful" notice.

  • 25 Nov — Quotes never show a subbie's name or the tender adjustment. When a trade carries a subbie's price, a quote that lists the work prints each of their lines at its share of the price with your subcontract markup on it, and your own lines at the section margin. The lines add up to the section. Before, the PDF quote could list "Tender adjustment — carrying 's price" as a line, sometimes negative, and priced every line at one blended figure.

  • 25 Nov — Margin boxes keep the figure you typed. Typing a margin, labour margin, subcontract markup or contingency quickly could store an earlier keystroke (2 instead of 28), so the next visit priced the job at the wrong figure. Each box now saves in order and keeps the last value. Changing the project margin also brings the job's value up to date straight away, as a section margin already did.

  • 25 Nov — A subcontractor's price can carry its own markup. Set a subcontract markup on the estimate (or tell the assistant "we put 28% on subs", and that it is your usual). When you carry a trade's tendered price onto a section, that price sells at the subcontract markup, and what you supply in the same section keeps the section's margin. A section can have its own figure. Sections built on your own figures are unchanged, and with no markup set nothing changes.

  • 25 Nov — Clearing a section takes it off the screen straight away. Clear section and deleting a selection of lines now remove them from the estimate the moment you confirm, instead of one line at a time over several seconds. A line that could not be deleted comes back, and you are told which.

  • 25 Nov — Reordering sections on one job no longer scrambles the rest. Dragging a section on a job's estimate moves it everywhere, as before, but the sections that job does not have now keep their places. Before, dragging on a small job could send every other trade back to the default order on every estimate and quote.

  • 25 Nov — Whole-house estimates check themselves faster. When the assistant prices a house from your cost plan, each trade now spots lines that belong to another trade before it saves, the final check reviews rates and double-pricing at the same time, and the open questions on lines are answered section by section in parallel rather than one at a time.

  • 24 Nov — Brochure quotes follow your estimate. Sections print in the order you saved on the estimate. The exclusions list puts the sections you excluded first, with your reason, then your job's own exclusions, then the scope's, and drops scope exclusions for trades no longer on the estimate. Shop Name and the items you have marked as client supplied fill in by themselves, and the Client supplied items page is left out when the client supplies nothing.

  • 24 Nov — Variation documents fill their cost schedule. A variation document now lists the variation's own lines, grouped by section with each section's total and an Included or Credit mark on every line. It carries the date the variation was raised rather than today's, and keeps the line breaks in the scope.

  • 24 Nov — The assistant can set a bill's due date, and says when a change didn't save. Ask it to change a bill's due date and it sticks (not once the bill is in Xero, paid or voided). If any field the assistant was asked to change did not save, it tells you so instead of saying it did.

  • 24 Nov — Asking the assistant to file a document files it. Saying "file it" puts the PDF in the job's Documents straight away, even with the document open beside the chat. Saving the same document again replaces its earlier draft PDF instead of adding a second copy with the same name. If the earlier PDF is final, sent or out for signature, it is kept and the new one is filed as the next revision, e.g. "(Rev 2)".

  • 24 Nov — A new job asked for in another job's chat no longer means typing it twice. When you ask for a new job from a chat that's on another job, the assistant offers to move this chat to the new job or open it in a new chat with everything you typed carried across.

  • 24 Nov — Your per-job questions are asked when a job is set up in chat. Standing questions you've told Base to ask on every job, like whether QLeave is included, are asked straight away when the assistant sets up a job.

  • 24 Nov — The pipeline board shows jobs that aren't on it. Jobs you are quoting that have no lead are listed above the board, and one press of Add all to the board (the button carries the count) gives each a lead and puts it on.

  • 24 Nov — A provisional sum no longer shows a $0 confirmed amount. Marking an estimate line as a provisional sum leaves its confirmed amount blank until you confirm it.

  • 24 Nov — Every job records who created it. Jobs made by the assistant, from a lead, by duplicating or from a quote now show who made them, and the assistant can no longer make a run of new jobs from one message.

  • 24 Nov — A job's figure before it is won says what it is. On a job you are still quoting, the figure at the top of the job follows the estimate lines you have approved, and now says so ("the approved estimate lines so far") instead of "the price agreed". If you un-approve or delete every approved line, it goes back to blank rather than keeping the old total. A figure you typed yourself is kept.

  • 24 Nov — Old Word (.doc) files can be read in chat. A Word 97-2003 document attached in chat is now read like any other, instead of asking you to re-save it as .docx.

  • 24 Nov — The morning briefing goes to people who read it. Someone you invited who has never signed in no longer gets one, and if you leave five in a row unopened it comes on Mondays only until you open one again.

  • 24 Nov — Pressing Stop in chat says "Stopped." It no longer leaves a message saying something went wrong.

  • 24 Nov — A paper size is no longer filed as a drawing number. Plans that print the sheet size in the title block ("A3") and no sheet number used to land on the drawing register as sheet A-3, and the floor plan and elevations behind it were skipped as copies of it. Those pages now file under the file's name, one row per page, ready to rename.

  • 24 Nov — A lead you already have in both Base and Zoho is joined up, not doubled. When the Zoho sync meets a deal or lead with the same name and business as a Base lead that is not yet joined to anything, it joins the two instead of making a second lead in Base and a second deal in Zoho.

  • 24 Nov — Connecting Zoho again keeps your sync as it was. Disconnecting and connecting the same Zoho used to make Base forget which records went together, so the next sync could bring every deal in again as a new lead. Now the pairing is kept and the sync picks up where it stopped. Connecting a different Zoho still starts afresh. If your Zoho sync was switched off by an earlier disconnect, the Zoho card on Settings → Integrations now says Off and shows Set it up for me to switch it back on, instead of saying On while nothing moved.

  • 24 Nov — Allowances at your own rates are no longer marked as provisional sums. When the assistant prices something the drawings do not show from one of your own rates, the line is an allowance: part of your price, with the reason on it. A provisional sum is now only a figure the assistant had no rate for, or one you ask for.

  • 24 Nov — The phone app and the Chrome extension are one press away. Your account menu at the foot of the nav has Phone app, which shows a code to scan with your iPhone's camera to get Base Management from the App Store, and Chrome extension, which says what Base for Chrome is for and has Add to Chrome. Base for Chrome is now on the Chrome Web Store for everyone, so there is no need to ask us for it. Both are also linked from the foot of the website and the support page.

  • 24 Nov — Ask from the phone app and the assistant works in your browser at the desk. With a browser linked on Settings → Browser extension (Let jobs use this browser) and Chrome open on your computer, a chat in the Base phone app can read and work on the sites you are signed in to there. Nobody is at the computer, so it follows the same limits as a job: only sites you already allowed, and it posts, sends or submits only where you switched that on under Jobs may. Anything else it tells you about in the chat.

  • 24 Nov — The assistant can email about something that is not a job. Ask it to draft an email that belongs to no job and no lead (a reply to something general, other business, a personal note, a test to yourself) and it drafts it without needing a job to put it on. You check it and press Approve & send as before. It is yours alone: nobody else in the business sees the draft or the sent email, and a reply comes to your own email address. File it on a job later and it becomes part of that job's messages.

  • 24 Nov — The assistant can look in your Zoho, and change it only with your press of a button. Ask the assistant what Zoho says about a deal, a contact or a business and it looks it up. If an admin turns on Let the assistant change Zoho on Settings → Integrations, it can also add or change a Zoho record when you ask: it shows a card with what the record says now and what it would become, and nothing changes until you press Change it in Zoho. Off by default.

  • 24 Nov — Zoho is set up from the Integrations page. Connect, Set it up for me, Send Base leads to Zoho and Sync now are all under Zoho CRM on Settings → Integrations. The Zoho page is now Advanced, for matching fields your head office built. If Zoho cannot be checked, the card says so with a Try again button.

  • 24 Nov — Base tells you when a record is deleted in Zoho. A lead, business or contact that head office deletes in Zoho stays in Base, and Base tells you once so you can decide whether to delete it here too. Nothing is removed on its own, and Base does not send the record back to Zoho.

  • 24 Nov — Zoho can be set up with one button. On Settings → Integrations, Set it up for me matches Zoho's own accounts, contacts, deals and leads to Base and starts the sync, with nothing to work out. Zoho's records appear in Base; Base changes nothing in Zoho unless you turn on Send Base leads to Zoho, which adds each Base lead to Zoho as a deal with its business and contact. A new Zoho lead now arrives as a Base lead with its business and contact made beside it. If you connected Zoho before today, disconnect it and connect it again first — the page says so — because the sync needs one more permission from Zoho. Until then nothing can sync.

  • 24 Nov — A Zoho match opens ready to read, not already blocked. After Read my Zoho, a kind of record no longer opens with red Sort this out first notices about choices you never made. Where two Zoho fields wanted the same place in Base (Phone and Mobile), or a field had nowhere to go, Base now leaves the second one in Zoho and says why on its row, so you can swap them if you prefer. A notice about one field now names the field. Press Read my Zoho again to get the cleaner match.

  • 23 Nov — Cost by section and room opens from a button. On an estimate grouped by room, the table of what every section costs in every room no longer sits open above the estimate. Press Cost by section and room above the first section to open it; the section names and totals stay in place while you scroll.

  • 23 Nov — Base checks an estimate for what a building implies, and for money counted twice. Before it calls a whole-job estimate finished, Base now checks that a job on more than one level has stairs, that bathrooms have shower screens, mirrors and waterproofing, and that a basement has its excavation, the walls that hold the ground back, their footings and the waterproofing behind them. A line priced as a percentage of cost, such as supervision, is brought back to that percentage of the finished cost. Where a whole-trade rate sits beside lines for the parts it already covers, such as a per-point plumbing rate and separate under-slab plumbing, Base removes one or the other. Retaining walls, slabs and excavation are measured from the outside of the building and the natural ground line, not from the room schedule.

  • 23 Nov — Base says how much of an estimate is allowance, and will not stay silent on a trade. When Base finishes an estimate it now tells you how many dollars, and what share of the cost, it allowed for with no drawing, schedule or quote behind them, and lists the largest with the reason for each. On a whole job it also checks the trades every building has (site costs, electrical, plumbing, air conditioning, linings, painting, floor finishes, joinery): if the plans do not show one and it is neither priced nor excluded, Base asks you whether to allow for it or leave it out, and does not call the estimate finished until one of those is written down. An allowance Base makes at its own figure, with nothing on the documents behind it, now shows as a provisional sum (the PS badge) until a real price or a quote replaces it.

  • 22 Nov — Delete your account from Billing once you have cancelled. After you cancel your subscription, Settings → Billing now says it is cancelled and until when you keep access, and offers Delete my account: the same deletion as on your profile and in the phone app, which shows what will be erased before you confirm. Cancelling alone still deletes nothing. A cancelled subscription also no longer shows a renewal date. See Billing.

  • 22 Nov — Base can clear tenders it prepared but never sent. With AI email sending off, Base prepares tender invitations for you to send. Asking Base to cancel one of those used to be refused, so a corrected package came back as another round beside the old one. Base now withdraws invitations nobody has received without asking, and still leaves it to you when any of them went out, because those trades are emailed that the tender is cancelled.

  • 22 Nov — Ask Base which trades got the drawings. Base can now tell you, for every tender invitation, which files went with it and which drawing set, and point out any that went out with nothing attached. Before, it could not see that record and said it did not exist.

  • 22 Nov — Base can see your 3D view again when it looks twice. When Base asked to see a cabinet or a fitout in 3D for a second time, or the view captured again after reloading, the picture failed to reach it and Base waited, then said it could not see the model. The latest picture now always gets through.

  • 22 Nov — Long rows of rooms are easier to move along. When the rooms, units or finishes above an estimate run wider than the page, an arrow now shows at the edge with more to see. Press it to move along, press and drag the row sideways, or use the left and right arrow keys from a selected room. A row that fits shows no arrows.

  • 22 Nov — A quote can read apartment by apartment. In Document Studio → Quote settings, Group lines by has a new choice, Apartment, house or level. On a job priced as several units the quote then lists each unit with its own subtotal, its rooms together, and the lines for the whole job (delivery, site measure) last. You can also ask Base to group one quote that way. The prices and the total do not change.

  • 22 Nov — A job of several apartments reads apartment by apartment. When Base prices four apartments, six townhouses or each level of a building in one estimate, the estimate now lists them above the room strip: a chip for each with what it sells for and how many of its lines are approved, and a small picture of them as blocks, green as they are approved. Press one to see only its lines, and approve what is left in it in one press. A unit that came out well under its twins is marked short, so a missing room is seen before the quote goes out. Above them, Finishes shows a tile for each part of the joinery (carcasses, doors and fronts, end panels, fillers and kickers, feature pieces) with a swatch of its material, and whether anyone has agreed the finishes, with Confirm these finishes when nobody has.

  • 22 Nov — Base no longer removes an apartment's lines as duplicates. On a job of matching apartments, the same cabinet appears once per apartment. Base could mistake those for the same line entered twice and delete them, leaving one apartment priced well under the others. It now knows which apartment each line belongs to and will not remove a line because another apartment has the same one.

  • 22 Nov — Base asks what the joinery is made of before it prices it. On a job with joinery, the questions Base asks at the start now include a finish schedule: the boards for carcasses, doors and drawer fronts, end panels, fillers and kickers, and feature pieces such as an island, filled in from the finish notes on the plans and the boards your rate book usually prices on. If the plans have no finish schedule, Base says so and offers to draft one from your usual finishes or take yours. The schedule you agree is kept on the job and every joinery line is priced on it, so two identical kitchens no longer come back on different finishes. To change a finish later, ask Base ("what if the fronts were 2-pac?"): it shows what the change moves for each unit, then reprices the joinery without taking the job off again.

  • 22 Nov — You can read an estimate line with the chat open. With the chat docked beside an estimate, each line's description was cut to a few letters, or to nothing, by its tags and the columns after it. A narrow estimate now puts the description on top of each line as a heading, in full, with the tags and figures beneath; a wide one gives a long description two lines. See The estimate.

  • 22 Nov — Filling a spreadsheet template no longer stops at 500 cells. When Base filled an Excel template, such as an export of a whole quote into another system's import sheet, it saved the first 500 cells and said it was done, so a long quote came out with half its lines and took several tries. It now writes the whole sheet in one go, and tells you if any cell could not be written.

  • 22 Nov — A line for several units is no longer called "over its build-up". The build-up under a joinery line is for one unit (or one m²), and the line is for however many there are. The inspection view, the breakdown under a line and the Excel export compared the whole line with the build-up of one, so four vanities at the right price read as three build-ups over. They now compare the line with the build-up multiplied out, and show both figures.

  • 22 Nov — The full chat, beside the line you are inspecting. The panel on the right of the inspection view now has two tabs: Build-up, as before, and Chat, which puts the whole conversation with Base in the panel. When Base asks you something, Answer in the chat swaps to it; the view no longer has to close. See The estimate.

  • 22 Nov — Inspecting a won job says it is locked. The inspection view on a won job greyed the line's figures without saying why. It now says the job is won and that a change is a variation, and no longer offers to add parts. When you tell Base to change a locked line and it asks you something back (who pays for the extra?), the list shows what it said and the question, with Answer in the chat; before, it just said "Done."

  • 22 Nov — A finish you choose is filed as the finish. Picking a finish such as a woodgrain melamine or a stone top while inspecting a unit put it under Structure or Tops, so Finish still read as missing and picking again added a second one. It is now listed as Finish — … under Finish, and picking another replaces it. Hours in a build-up are always listed under Labour & machining, whatever they are for. When you tell Base a line is for a different quantity, the line's hours now change with it.

  • 22 Nov — Tell Base shows the answer, not the working. While Base worked on a request from the inspection view, the list showed its thinking as it went. It now says Thinking with a count, as the chat does, and then the answer. Choosing a finish also no longer renames the labour row that sits with it.

  • 20 Nov — Choose a finish and the price follows. Finishes in the inspection view now opens its own list: the finishes in your rate book first, then common ones at an indicative price, or a new one you name and price, which is saved to your rate book. Picking one re-prices the finish in the unit's build-up and moves the line with it, shown before you confirm, and then goes onto the 3D model if the unit has one. It no longer needs a 3D model, or a part selected on it. See The estimate.

  • 20 Nov — Tell Base what to change while you inspect a unit. A small box under the drawing in the inspection view: type or say what is wrong — the box on the drawing is on the wrong cupboard, a part is missing, the quantity is out — and Base fixes that line while you carry on. What you asked and what it answered stay in a short list above the box. The corner preview of the 3D build is now the model alone, and reloading the page comes back to the line you were on. See The estimate.

  • 20 Nov — The drawing now shows when you inspect a unit. On an estimate built in chat, the drawing in the inspection view said the page had no picture. It is now drawn from the plan file itself, closed in on the part of the sheet the line was taken from, with that part outlined.

  • 18 Nov — Inspect joinery one unit at a time. A new view for checking a section before you approve it: the unit in 3D, the drawing it came from in the corner (press it to swap them), what it is made of with a tick for structure, edging, finish, hardware and fixings, and the line's own figures along the bottom, editable in place. Add a missing part and Base updates the 3D model and the line; pick a finish from swatches, yours first, and it goes onto the model; Approve and next moves on. Works by voice too: say "Hey Base" and the chat stays out of the way. Open it from a section's ⋯ menu, Inspect one by one. See The estimate.

  • 18 Nov — See who is using your business's AI, and stop what is running. The monthly AI allowance is shared by the whole business, and until now nothing showed where it had gone. AI use and what's running, in the chat's ⋯ menu, shows how much is used, each person's share of it, and every chat, estimate and scheduled run going right now, with Stop beside each. You can stop your own; an admin can stop anyone's. The same list now appears when the allowance runs out, and tells someone who is not an admin who can top it up. See Ask Base.

  • 18 Nov — Base can be told you only do one trade. For a joinery shop, an electrical contractor or a tiler — or for one person who only ever prices one trade inside a builder — set a Trade focus on Settings → Business Profile → How you work, or just tell the assistant "we only do joinery". Estimates then price that trade alone, write every other trade into the exclusions as by others, and carry a deeper checklist for that trade. The business has a setting and each person can have their own, which wins for them. It is a starting point: ask for another trade on a job and it is still priced. See Business Profile.

  • 18 Nov — Read an estimate room by room. Press Group by: Room above the estimate and a long section reads under a heading per room, each with its subtotal, that folds away. A strip of rooms above the estimate shows what each sells for; press one to see only that room. Select lines and use Room… to put them in one. With a trade focus, or on a joinery-only job, the estimate opens this way. See The estimate.

  • 17 Nov — Base remembers who changed what on a lead. The value, the stage, the owner, the expected close date, the reason it was lost — every change to the things people argue about later is kept with who made it and when. Ask the assistant "who dropped the value on Chermside?" and it will tell you. It catches every way a change can be made, including an import, the assistant itself, or another CRM Base is mirroring; a change with nobody behind it is shown as made by Base. See CRM.

  • 17 Nov — A stage can ask for what it needs before a job moves there. On any pipeline stage you can now tick what a job must have before it can move in — a value, an expected close date, a reason, a note saying why. If someone tries without them, Base says what is needed rather than letting the job through. It applies everywhere a job moves, including chat and the phone, and nothing is required unless you tick it. A requirement never blocks an enquiry arriving, an import, or a client accepting a quote. See Pipelines, stages and lead fields.

  • 17 Nov — "Don't quote stone" now reaches the joinery. On a plans-to-quote estimate, a rule about stone only reached whoever priced stone, while the joinery side, which draws the benchtops, never saw it and kept adding sink and hob cut-outs. The joinery side now follows your stone rules too.

  • 16 Nov — A head office can see how its network is going, without seeing anyone's records. New for franchises: a head office and the businesses under it can be linked as a network. Head office sees a short list of figures by month — how many jobs, what was won, what is in the pipeline — and only the ones each business has ticked. It never sees a lead, a client, a job or a cost. Nothing is shared until someone ticks it, a business can stop at any time, and leaving deletes what was already sent. See Franchise network.

  • 16 Nov — Base can mirror a Zoho CRM your head office makes you keep. If you are a franchisee who has to keep records in head office's Zoho, Base now syncs with it both ways so you only type things once. Base reads your Zoho, suggests what each field means here with a reason for each one, and you say who is in charge of every field — you, head office, either of you, or nobody. Nothing moves until you have read the match and switched it on. If you and head office both change the same thing, Base changes neither and asks you. See Zoho.

  • 15 Nov — Chasing a whole tender package no longer fails with "Too many requests". Chasing several tenderers at once could hit the email provider's limit, and the chase was shown as failed. Base now sends the chases a few at a time and waits out a busy moment instead of giving up.

  • 15 Nov — A large CSV no longer stops the chat. Attaching a big export from another system (a contacts or leads list, say) made every message in that conversation fail with "The model provider rejected this request", even "try again". The assistant now reads the column headings and the first rows, is told how many rows the file really has, and keeps the whole file as a document. To bring a contacts list in, it points you to Contacts → Import, which reads every row. A conversation that already failed this way stays stuck: start a new chat and attach the file again. See Ask Base.

  • 15 Nov — The assistant can read iPhone photos. A photo from an iPhone is often in Apple's HEIC format, sometimes under a .jpg name, and the assistant couldn't see it: it asked you to send the photo again. Base now converts it, whether you upload it to a job's documents or attach it in the chat. If one still can't be read, the assistant says so and how to set the iPhone to take JPEGs. See Documents.

  • 15 Nov — A mailbox paused by a Microsoft or Google outage starts again by itself. When their side kept failing, Base paused the mailbox and it stayed paused until you reconnected, so new mail stopped reaching Base. Base now tries a paused mailbox again every hour and resumes it as soon as a check works; the error it shows now says what went wrong instead of nothing. A mailbox whose sign-in was revoked still needs Reconnect. See Integrations.

  • 15 Nov — Projects and a job's estimate load once, not twice. Opening Projects or a job sometimes showed the page and then redrew all of it a moment later, because a date on it (when a job was last updated, the day it was won, a document's age, the days to handover) was worked out on Base's clock and then again on yours. Those dates now come out the same both times, then settle on your own time zone.

  • 14 Nov — Moving budget between trades works when you ask Base for it. Asking the assistant to shift allowance between two budget lines, or to bring the budget back in line with the estimate, did nothing but return an error — the same thing worked from the Job Costs page. Both now work from chat as well.

  • 14 Nov — Deleting a budget line explains itself. A line with adjustments recorded against it failed with a database error. Base now says that the line is part of the job's budget history and will not be deleted — move what is left on it with a transfer instead.

  • 14 Nov — Engaging a subcontractor asks for their trade. If the business had no trade on file, adding them to a job failed with a database error. Base now asks for the trade, or takes it from the company when it has one.

  • 14 Nov — A scheduled run that stops part-way goes back on by itself. If the machine running one of your repeating runs stopped before it finished — usually a new version of Base going out — the run sat there and the schedule never fired again, with nothing saying so. Base now picks those up within the hour and puts the schedule back on at its next time. A one-off that stopped part-way is recorded as failed rather than run again, in case it had already sent something. Running now shows which runs are going and which stopped part-way, and Stop now works on a run that is already going, not just one waiting its turn. See Automations.

  • 10 Nov — Job Costs' tabs are tidier. Each bill on Cost Entries shows what it is on two lines, then its supplier and invoice number, then its invoice, PO and order as buttons of their own; edit and delete appear when you point at it, and on a phone each bill is a card. Every tab opens with its own buttons and one line saying what it is. On Variations, the four figures are the filter: press one to show only those. The tabs sit higher: Needs doing shows its first three with Show more for the rest, and the header is one line. The Purchase Orders tab has gone: a job's orders open on its own Purchase Orders page, which Budget Lines links to, and a bill's On PO-… button opens the order it pays.

  • 10 Nov — An opened line on Job Costs is easier to read. The expected final is now a row of figures at the top, with how far over or under budget the line is. What still needs ordering sits on the left, with its amounts in one column and Tick off / Not required appearing when you point at a line. What has been spent and ordered sits on the right, and each order and bill shows its PO, quote or invoice on a line of its own.

  • 10 Nov — The Documents library shows your files again. It had been saying "No documents yet" even with files on your jobs. Nothing was lost.

  • 10 Nov — Tender replies are a conversation you can carry on. Each tenderer now has the whole email thread and a reply box on the Tenders page, with Attach for files from the job, the rest of Base or your computer (in Comms too), and a tender conversation in Comms links to its tender. The row says where it has got to, such as Has a question or Pricing it, and whoever sent the invitation is told when one comes in. Invitations now offer Ask a question and a link to the subcontractor portal. See Tenders.

  • 10 Nov — Rebuilding a floor plan from a thin-line PDF now works. On drawings with very fine lines, the assistant couldn't find the dimensions it was pointing at, gave up on measuring and drew the plan by hand. It now measures them off the sheet, and it no longer treats a floor plan rebuild as an estimate when you attach the PDF.

  • 10 Nov — Buttons in the Chrome side column open a tab. Pressing something like Open the lead in the side column's chat used to turn the column into that page, with no way back but closing it. It now opens in a browser tab and the chat stays put.

  • 10 Nov — Comms has an Inbox and a Sent. They replace All, so a message you sent no longer looks like one that just arrived. On Sent each row reads To the person, and inside a conversation your messages say who they went to. See Comms.

  • 10 Nov — Project agents put meetings forward for you to book. Each Monday on a job that's on site, the agent checks what's coming up. A meeting it thinks is missing shows on Decide with who, when and why, and Book it books it and sends the invites. Nothing reaches a calendar until you do. The day before each meeting it builds a page with an agenda you can tick through and actions that go straight on the task list. Under Decide → To send, Approve all clears a job's messages at once.

  • 10 Nov — Project agents only send what you've allowed. Emails, texts and meeting invites from a project agent are now three separate permissions on Settings → AI permissions, all off until an admin turns one on and confirms a warning. If you had AI email sending on, it still works in the chat, but it no longer lets an agent send: the agent's messages wait for you until you allow them. See AI permissions.

  • 9 Nov — Importing a supplier's spreadsheet asks whose prices they are. Choose A supplier's prices on Rates → Imports and a box asks for the supplier's name; before, the import stopped with nowhere to type it. Lists that write their unit as PCE now read as each.

  • 9 Nov — A finish your supplier doesn't sell stays provisional. If a line asks for a colour or metal that isn't on the price list, the assistant no longer links it to another finish. It shows as a provisional sum until a real price is in.

  • 9 Nov — The assistant keeps the drawing in front of it while it builds your floor plan. It could read a plan, then lose sight of it the moment it started drawing and tell you it couldn't see the drawing. It now has the drawing the whole way through. See Floor plan.

  • 9 Nov — A wrong scale in the title block no longer sizes your floor plan. When the assistant traces a PDF, Base checks the printed scale against the dimensions on the sheet. If they disagree, the plan uses the dimensions and the assistant tells you. See Floor plan.

  • 9 Nov — Base's chat can sit beside the page you are on. Click the Base icon in Chrome and the chat opens down the side of the window, knows which tab you are looking at, and stays as you move between tabs. It matches Base's light or dark setting.

  • 9 Nov — See what jobs may do on websites. Settings → AI permissions now lists, site by site and browser by browser, what a schedule or watched page may press with nobody there. The assistant can tell you too.

  • 9 Nov — Receipt scans work properly across several mailboxes. Choose which mailboxes to scan, and see which address each receipt came from. An invoice that reached two of your mailboxes is one receipt, and a mailbox whose sign-in has expired no longer stops the others being scanned. See Receipts.

  • 9 Nov — The plan check has its own page on the estimate. Press Open plan check to go through its questions one by one: answer one yourself or send it to someone right there, without finding it on the RFI page first. Answers stay with the job, and the assistant uses them instead of asking again. See The estimate.

  • 9 Nov — Swapping a supplier price is quicker, even on a huge list. The price list opens already narrowed to the line, with its words, unit and trade as filters you can take off, the best matches at the top and a search that narrows by every word you add. See The estimate.

  • 9 Nov — Very large supplier price lists no longer get in the way of pricing. Base reads your own rates in full and searches your supplier lists for each line, so a list of tens of thousands of items still gets matched.

  • 9 Nov — RFIs say cabinet, not module. Questions that go to architects and clients now use their word.

  • 9 Nov — Lines the assistant adds in chat now use your rate book. When it adds a line itself, Base now checks your book and uses your rate where one applies, and the assistant tells you when it has. A figure you gave it stays as you said it.

  • 9 Nov — Estimates get a final check against your rate book. Before an estimate is finished, Base reads every line and every part of each cabinet against your book, and flags anything the book should have priced: a rate that doesn't match, a row used for the wrong thing, or a cost counted twice. Base never changes the price itself. Change the line, or answer the flag with why.

  • 9 Nov — Joinery no longer borrows another decor's board price. A front in one decor is no longer priced from a rate for a different decor, and the line says the price isn't from your book until you add one. Carcass edging is no longer charged when your carcass rate already includes it.

  • 9 Nov — Base no longer gets lost when you paste a screenshot in the chat. The assistant read the picture and then lost sight of it partway through its reply, and could end up telling you it couldn't see it. A screenshot now stays in front of it for the whole reply.

  • 9 Nov — The assistant checks with you before changing a rate by three times or more. It shows the old and new figure beside the similar rates in your book and your labour norms, and changes the rate only once you say that rate should move. Editing a rate yourself on the Rate Book page works as before.

  • 9 Nov — A curved cabinet is no longer treated as a copy of a plain one. Your rate book now keeps a rate that names a different shape or performance (curved, radius, arched, raked, tapered, splayed, corner, fire rated, acoustic) as its own entry, without asking how it differs.

  • 9 Nov — Estimates quoted room by room need a room on every priced line. If your quote is laid out by room, drawings take-offs now name the room on each line, and the completeness check lists any priced line without one so it doesn't print in an unlabelled block. Job-wide items go under General.

  • 8 Nov — Approved bills reach Xero even when the supplier has no default terms there. Xero turned such a bill away for having no due date. Base now sends the bill's own due date, or your supplier payment terms counted from the bill date (30 days if you have not set any), the same terms the cash forecast uses. Bills that were turned away go across on the next daily push.

  • 8 Nov — A screenshot sent while the assistant is still replying now reaches it. It used to arrive as a file name only, and the assistant said it could not see it. PNG and JPEG images now reach the assistant straight away. Other image types (such as WebP or HEIC) get a plain message asking you to send them again once the reply finishes.

  • 8 Nov — "Send everyone the current set" sends your drawings, and only to contractors you invited. The newest PDF in a chat on the job used to count as the current set, so a supplier's quote dropped in after the drawings could go out to every tenderer as "updated drawings". The current set is now the newest PDF filed as drawings, and invitations you have not sent yet are left out, since they carry the current set when you send them. See Tenders.

  • 8 Nov — Base looks for work priced twice before an estimate is finished. When Base prices a job from the drawings, each trade is now told which trade owns the work that shows up on two trades' pages, such as retaining walls, the upper floor or the pool fence, so it is measured once. When the estimate is checked for completeness, Base also reads every line across the trades and flags any it thinks are the same work. Each flag says what it is priced against: delete the line if it is the same work, or answer the flag with why it is different.

  • 8 Nov — Labour is counted once on lines priced from your rate book. Base now works out whether each rate is materials only, labour only or supply and install, from what you recorded or from the rate's name. A labour-only or supply-and-install rate no longer gets hours added on top, and Base notes on the line when it took them off. A materials-only rate still needs its labour priced, as hours or on its own line.

  • 8 Nov — Base asks before adding a contingency. If your business has no rule about contingency, Base leaves it out of the estimate and asks: add one to this build, add it to all builds, or none. Choosing all builds saves it as a rule, so it won't ask again.

  • 8 Nov — Drawings take-offs code each line to your own cost codes. Each trade now gets your list of cost codes and picks the one that fits each line, so a pool, scaffolding or tiling labour lands on its own code instead of the section's.

  • 8 Nov — 2-pac joinery is costed from your own rates. A 2-pac front now takes your 2-pac rate per m² from the rate book, and your door and panel profile rate when the book has one, with the profile shown as its own line on the unit's materials. A finger-pull profile still counts as routing time, not a profile.

  • 8 Nov — Estimates pick from your own rate book far more reliably. When Base prices a job, it now reads your whole rate book and chooses the rate for each line itself, the way you would, instead of shortlisting by similar wording. It then checks the choice: a rate per m² of floor area is never put on a measured quantity, and an allowance per house is never multiplied by one. A line your book has no rate for now says so plainly, rather than carrying a half-sure match for you to check. When Base measures a job from the drawings, each trade also sees your own rates for that trade first, so it measures in the units your book prices in.

  • 8 Nov — Your estimating rules now reach the drawings take-off, and Base keeps far more of them in mind. When Base prices a job from the drawings, each trade is priced separately, and those trades used to see none of what you had taught Base. Now each one is given your rules for that trade before it starts (a tiling rule for the tiler, a steel rule for the steel), plus your general rules on measuring and pricing, and it can look up more of them when it meets something they do not cover. Separately, the part of every conversation that holds what Base always knows about your business is three times bigger: see the figures under The always-on block on AI Memory settings.

  • 8 Nov — Read the estimate and send the quote in your own cost codes. On a job's estimate, press Group by: Cost code beside Collapse all to read the same lines under your cost codes from Settings → Cost Codes, in their order, with lines not yet coded at the end. Nothing moves: each line keeps its section and its margin, and Base remembers the choice in your browser. To send quotes that way, choose By cost code under Group lines by in Document Studio, or ask the assistant for a quote "by cost code". The total stays the estimate's to the cent. See The estimate.

  • 8 Nov — Bring your Buildxact cost plan across in one upload. On Rate Book → Imports, press From Buildxact and choose the estimate-items export. Its categories become your cost codes, its priced lines become your own rates for you to approve, its layout becomes an estimate template with no prices in it, and its notes become rules you confirm on AI Memory → Decide. A quote total left in the template ("as per … quote # dated") is listed and left out unless you tick it. See Rate Book.

  • 8 Nov — New: Settings → AI permissions. One page for what the assistant may do when nobody is in the chat. Automations that text or email people outside the business (Subbie Reminders, Compliance Chaser, the Friday client report) now send by themselves only once an admin allows each one. Base says so when you install the pack, records who allowed it and when, and lets you take it back. Until then, their messages wait as drafts. If you already run Subbie Reminders, allow it there to keep its texts going. Texts from the chat follow AI email sending, the same as email. The assistant can turn AI email sending off for you, but only an admin can turn it on, on the Integrations page. An automation marks a job won only once you turn on Mark jobs won. A notice to a subcontractor or client about something an automation wrote, like a defect or an RFI answer, now waits for your Send notice. See AI permissions.

  • 8 Nov — With AI email sending off, nothing the assistant writes goes out without your press. Some kinds of message used to slip past the switch: RFIs sent for answers, forms, signature requests, compliance requests, plan check reports, tender cancellations, answers to a client's question, orders issued from chat, meeting invites and CRM sequences. Each now waits for you to send it from its own page, and the assistant tells you which button to press. Asking the assistant to draft something for you to approve no longer sends it. See Integrations.

  • 8 Nov — The research agent learns from what you keep and drop. Dropping a suggestion now asks why in one tap (wrong kind of business, too big, too small, wrong area, we already know them, not worth chasing, or your own words), and the next search learns from it: it judges new businesses the way your decisions point, searches more where your keeps came from, and stops searching for a kind of business you only ever drop. Every five decisions it works out a few rules, shown in the pipeline's settings under Agents, with a sentence for the brief when your choices say something it doesn't. Add to the brief puts it in; you save. It also stops suggesting businesses you already have under a longer or Google Maps name, or whose people are in your contacts with a work email. See Pipelines.

  • 7 Nov — Base can put files on a site, save files from one, and do more with a page. Ask the assistant to post a job's photos to a site or attach a document on a portal: it puts Base's own files in the site's upload box, drop area or message box, and asks Allow first, as for a Send. Ask it to save an image or file from a page (a spec sheet, a plan from a portal, a photo someone sent in a chat): it files it in the job's documents, or downloads it to your computer if you ask. It can now also double-click, right-click (the site's own menu), point at things to open hover menus, drag (reorder, drop, sliders), press more keys, and read and use forms inside frames embedded in a page. Update Base for Chrome to 0.4. See Browser extension.

  • 7 Nov — Enter in a message box now counts as sending. Base for Chrome treated Enter in a chat box (Messenger, WhatsApp Web, a comment box) as nothing in particular, so a job could send a message on a site where you had not switched on send. Now it is a send like the Send button: with you at the browser it asks Allow, and a job does it only where Jobs may includes send for that site. A watch you set up to reply needs send switched on for that site in the extension's menu. Update Base for Chrome to 0.3.1. See Browser extension.

  • 7 Nov — Linking a browser now asks you in the extension, and a linked browser is yours alone. When you press Let jobs use this browser, Base for Chrome opens its own window showing your name, email and business as Base has them; nothing is linked until you press Link this browser there. From then on that browser works only for your account: a chat signed in as someone else in the same Chrome cannot use it. Signing out of Base in that browser unlinks it, changing your password unlinks all of them, and a browser unused for 30 days is unlinked. Update Base for Chrome to 0.3 and link again. See Browser extension.

  • 7 Nov — The assistant can use your browser on a schedule, and watch pages for you. In Chrome, open Settings → Browser extension and press Let jobs use this browser. Then ask for browser work with a time ("every morning, check my Reece account for new invoices") or ask the assistant to watch a page ("watch my Instagram notifications every hour and draft replies to new comments", "watch the bugs WhatsApp group and add each one as a task"). Jobs run while Chrome is open, in background tabs that never take over your screen, and never ask you anything: they use only the sites you allowed, and post, send or submit only where you switch it on in the extension's menu under Jobs may. Everything else is left for you. Watched pages are listed on the same settings page. Needs Base for Chrome 0.3. See Browser extension.

  • 7 Nov — Alerts in the Base phone app. Update the Base Management app to version 1.0.1 from the App Store or Google Play, then open More → Alerts on this phone and press Turn on alerts, or answer Turn on on the card on Today. The phone then gets the same alerts your computer can: a new enquiry and a booking for the person who hears about them, and the urgent site alerts (an incident, a worker refused at the gate, someone not fit for work, a critical-path task running late, a forecast finish past handover) for the job's site supervisor or head PM. Tapping an alert opens the lead or the job's screen in the app. Mute, quiet hours and Send a test are on the same screen, and the phone is listed with your browsers under Getting alerts. Signing out of the app stops its alerts. See Notifications.

  • 7 Nov — The research agent sees who is hiring and who is busy. It now checks whether each business it finds is advertising jobs on SEEK, and how many followers and recent posts the Instagram account on its website has, and counts both towards Active and Good signs on the scorecard. A business advertising for the role your brief names can be suggested from its job ad alone; recruitment agencies and job boards are left out. Both links are on the suggestion. See Pipelines.

  • 7 Nov — The research agent reads each business, and shows you why it fits. It now searches every place your brief names, reads each shortlisted business's own website and, in Queensland, its QBCC licence, and leaves out directories, job boards and anything on your leave-out list. Each suggestion is scored 0–100 on six things (kind, where, size, good signs, active, reachable): Suggested shows them as a matrix, and each row opens to a spider graph with the evidence for every score. What you keep and drop guides the next search. Under the brief, six marks show which parts of a good brief yours covers, with a template and Improve with Base to sharpen it; the brief now takes up to 1,500 characters in a box that grows. See Pipelines.

  • 7 Nov — Choose when the research agent looks for new targets. It used to run each Monday. Now each pipeline sets its own schedule: every weekday, every week or every two weeks on a day you pick, the first chosen day of each month, or only when you press Run now. Run research now also sits on the agents line above the board. You can ask the assistant too, for example "run research every second Friday". See Pipelines.

  • 7 Nov — Base asks before it learns from how you correct its estimates. Once a day Base looks at the changes your estimators made to lines it wrote. When the same correction keeps coming back on three or more different jobs (a line you always delete, labour hours you always raise or lower in a section, a line you keep adding because it was left out) it asks the person who made the changes, on their decisions and in the chat: "You deleted the site measure line on 5 of 6 jobs — leave it out from now on?" Say yes, and why if you like ("it's in our unit prices"), and the next estimate starts that way with your reason kept beside the rule; say no and it is not asked again. A yes to a joinery hours question also changes the joinery hours Base allows. Two copies of one job, priced two ways, count as one job. Prices are never part of it: your rate edits already teach the rate book. See AI Memory.

  • 7 Nov — The CRM knows who is waiting on you. When a client writes and nobody has replied, the lead moves up Next up into a new Waiting on you section, its card says so, and the top of the lead says who wrote and what about, with Draft a reply (the assistant writes it for you to check) and Read it. Next up opens with what happened since your last visit: new enquiries, who wrote, quotes opened and accepted, wins and losses, and the agents' drafts. Above the board, one line shows what the pipeline's agents are doing and what they have waiting for you, and an admin can press a column's name to change that stage. See CRM.

  • 7 Nov — The CRM tidied after a walk-through. Winning a lead straight after sending its quote no longer leaves three quote-chase tasks on a won lead. Moving a customer to a stage that means they left asks why from the lead's stage badge too, not only on the board. The Leads list's stage filters use your pipelines' own names, the Win window offers Stop asking on this pipeline for work that never has paperwork and no longer says "from its quote" when there is none, and Start here counts the pipeline you chose and offers to set up the agents. The Automations panel on the CRM lists each pipeline's agents and keeps what's on apart from what you can add. In a lead, the stages after the win follow Won on a dashed line, a won lead can Move to its next stage, the intake and booking rows go once it is decided, and Follow up with offers the sequence that fits the stage. The Trades job types are now Trades, fabrication and repairs. See CRM.

  • 7 Nov — Joinery costed from the drawing no longer borrows a past job's price. When Base costs a cabinet from its size, it now skips rate-book entries that are a whole unit or finished work from an earlier estimate (a shelving unit, a fitted wall panel, a veneer dado) and any part priced far above what that part costs, and uses its standard figure instead, marked as not from your rate book. Before, a bench with open shelving could come out at over $100,000 because a past job's shelving unit was read as the price of a shelf pin.

  • 7 Nov — Set up a pipeline without leaving the board. Admins: press Pipeline settings beside the pipeline chips on the CRM board and its settings open in a drawer over the board: stages (each on one line until you open it), lead details, what winning does, the agents and who hears about enquiries. One Save covers every tab, and the board changes behind it. On Settings → Pipelines, the button beside each pipeline now says Settings. See CRM.

  • 6 Nov — Joinery estimates read every drawing and check what's missing. When Base takes off joinery from your plans, it now reads every elevation at full size before it prices a unit, finds every sheet that carries a joinery finish code (so a theatre or a shaving cabinet on a sheet tagged for another trade still gets priced), and uses the board, edging and hardware rates already in your rate book. Before it says the estimate is finished, it checks each joinery sheet has a line, and that site measure, shop drawings, delivery and, for a job in another state, travel and accommodation are priced. It asks you about any it can't account for. Each cabinet, vanity, robe or panel run is now costed from its measured size, modules, doors, drawers and finish on your own board, edging and hardware prices and your joinery rate, the same way every time, and the line says which prices weren't in your rate book.

  • 6 Nov — Set up a pipeline's agents from the chat. Ask Base to switch on the first-reply agent, the chaser or the research agent, and it writes what the agents should know and who to look for with you, then saves them when you say yes. So can what winning does and whether a win asks for paperwork. See Pipelines.

  • 6 Nov — Read a lead's emails in full. On a lead's Emails tab, press an email to read all of it, and Open the conversation in Comms to see the whole thread and reply. See CRM.

  • 6 Nov — Base finds new targets for you. Switch on the research agent for a pipeline in Settings → Pipelines → Agents, and say who to look for. Each Monday, or when you press Find targets now, it searches Google Maps and the web, leaves out every business you already have, and suggests the best fits, each with why it fits and where it was found. Keep them into the pipeline's Research stage or drop them on CRM → Customers → Suggested. It never contacts anyone, and a monthly limit you set caps what it spends. See Pipelines.

  • 6 Nov — Emails Base sends for you carry your business's name. A tender, an order, a claim or any email that goes from Base (rather than your own mailbox) now shows as from Your Business via Base, not a bare hello@basemanagement.org, so the people you send to can see who it is from.

  • 6 Nov — The Excel estimate carries the build breakdowns. Export → Excel now puts each joinery line's build breakdown under it (board, fronts, edging, hardware and hours, with quantities and rates), shows how every line was priced, and adds a Build Breakdown sheet with one row per component. Before, the export showed one figure per line and left the breakdown behind. See Documents.

  • 6 Nov — Replies to your emails always come back to you. When someone answers an email you sent through Base, the reply is filed on the job under your email and you are told in your inbox, however they answered. That includes answering Base's hello@ address instead of the reply address, and a colleague of theirs answering a copy that was forwarded to them. Before, those replies stayed with Base and nobody at your business saw them. See Comms.

  • 6 Nov — New pipeline templates beyond building work. Start a pipeline for subcontracting to builders, for a supplier opening trade accounts, or for software and subscriptions (Research, demo, trial, then Onboarding, Active customer and Churned after the win, with no job or signed contract needed to win). Maintenance & service now carries on after the win with Regular client and No longer a client. See Pipelines.

  • 6 Nov — Agents that draft your first replies and chases. Switch them on per pipeline in Settings → Pipelines → Agents: one drafts the reply to every new enquiry within minutes, the other drafts a chase each morning for leads that have gone quiet (after checking your mailbox for a reply). Each draft arrives as a card with Send; nothing goes to a client on its own. Tell them how you talk to clients in What the agents should know. See Pipelines.

  • 6 Nov — See who your customers are, and who left and why. The new CRM → Customers tab shows every business as a target, prospect, customer or former customer, moved on its own by your deals: a lead makes a prospect, a win a customer. Drag a customer into a stage like Churned and Base asks why they left; the deal stays won, and the band counts who left in the last 90 days and the churn rate. See Customers.

  • 6 Nov — Each pipeline says what winning does. In Settings → Pipelines, choose whether a win offers to create the job (as building work always has), marks them a customer, or does nothing more, and whether it asks for the signed contract first. A sign-up or a service customer can now be won without paperwork or a job. See Pipelines.

  • 6 Nov — Stages before Enquiry and after Won, and say what Base does at each. In Settings → Pipelines, add a Research stage for businesses you haven’t contacted yet (it never shows as unanswered and stays out of the forecast), carry on past Won with Onboarding, Active customer or Churned (the win stays a win), and add more than one kind of lost, such as Disqualified, kept out of your hit rate. Each stage has switches for the response clock, the forecast, the board and the hit rate, and the assistant can set them up when you ask. See Pipelines.

  • 6 Nov — The CRM keeps itself up to date. The pipeline board, the Leads list and an open lead now change in front of you when a lead is edited anywhere: by the assistant in another chat or on your phone, or by a teammate. A stage the assistant adds or renames shows on the board straight away. See CRM.

  • 6 Nov — Opening a lead keeps the pipeline you’re on. On a business with more than one pipeline, opening a lead from the board used to flip the board behind it back to your first pipeline. It now stays on the one you were looking at, and closing the lead returns you to it.

  • 6 Nov — Pick several leads the way you pick files. On CRM → Leads, Ctrl-click (⌘ on a Mac) adds a lead and Shift-click takes every lead from the last one you picked, without opening them; hold Shift on a tick box to tick the run. In the list, ↑ and ↓ move, Space ticks, Enter opens, Ctrl+A takes every lead showing, and Ctrl+C (or Copy on the bar) copies the ticked leads to paste into a spreadsheet. See CRM.

  • 6 Nov — Emails in Comms are easier to read. An email someone sent you now shows as paragraphs with their signature set apart, and the lines their mail program broke partway through a sentence are joined back up. The earlier emails a reply quotes are folded under who wrote them and when. Long links show only the website they go to, and signature logos are kept out of the attachment list. See Comms.

  • 5 Nov — The assistant finishes what you ask instead of stopping to check. When you tell Base to do something, or say yes or go ahead, it now does it to the end in one go and then tells you what it did, rather than doing one step and asking "shall I carry on?". In your own browser, the Allow prompt on the page is the only confirmation it waits for. It still asks when there is a real choice to make, such as which item or how many. See Ask Base.

  • 5 Nov — Five chats can work at once, up from three. A chat can also hand work to up to five threads of its own at the same time. See Ask Base.

  • 5 Nov — Base can work in your own browser (early access). With Base for Chrome added, the assistant can read the supplier portals and subscriptions you sign in to: your trade prices, a catalogue page after page, a tender listing. It brings prices into the rate book for you to approve. It asks on each site first, never types passwords or card details, and waits for you to press Allow before anything that buys, sends or submits. See Browser extension.

  • 5 Nov — See how your business shows up on Google, and what to do first. CRM → Online presence searches for the work you do in the suburbs you work in (read off your own leads and jobs, or the ones you type), shows where you come up on the web and on Google Maps, compares your Google listing and reviews with the businesses above you, checks your website's speed and basics, and scores it all out of 100 with the few changes that will help most. Check any business in your Contacts the same way, and ask the assistant "how do we show up on Google?". See Online presence.

  • 5 Nov — Joinery is broken down while the estimate is priced. As soon as the assistant saves an estimate's joinery section, each joinery item becomes a unit with its bill of materials (the sheets, edging, hardware and hours it was priced from), without asking you first. You see the breakdown under each joinery line and in Manufacturing. The prices on the estimate do not change. See Manufacturing.

  • 5 Nov — Archived jobs stay archived. Money figures, Home's Recent projects and project count, the sidebar's project list and the daily insurance and licence reminders no longer include jobs you have archived. When you name a job, the assistant now picks the live one rather than an archived copy with the same name, and it can search your archived jobs when you ask for an old one. Unarchive a job to bring its money back into the totals. See Money.

  • 5 Nov — Set how fast Base talks, and how long it waits before it answers. In voice mode, two dials now sit in the chat's bottom corners: Speed on the left (0.75× to 1.5×) and Send after on the right (how long a pause sends what you said, 0.6 s to 3 s). Grab one and turn it. They are kept in your browser. The note about checking figures and the "Hey Base" hint are hidden in voice mode to make room. Separately, a spoken reply no longer opens with a stray <voice> in the chat. See Ask Base.

  • 5 Nov — A tender comparison reads as a comparison, and Base can read it to you. Base's write-up above a package on Tenders now shows its price table as a table and its headings as headings. Before, the table came out as one long line of | marks. Press Listen beside it to hear the comparison, or beside Base's take on a sub's row to hear that tenderer's analysis, at 1× to 2×. See Tenders.

  • 4 Nov — Connect all your business email addresses and see them in one inbox. Under Settings → Integrations you can now connect several Gmail and Outlook mailboxes (up to eight each person): press Add another Gmail or Add another Outlook. Each mailbox gets its own colour, and you can Rename it ("Tenders") and choose which one new email goes from with Make default. On Comms, an Inbox bar shows All inboxes, a button per mailbox and Base and team; every email carries its mailbox's mark, and a reply goes from the mailbox the email came to, with a From you can change. The assistant can search one inbox ("in my tenders inbox") or all of them, and send from the address you name. See Integrations and Comms.

  • 4 Nov — A lead shows who it is for, and you can add people to it. The person typed on New lead for a homeowner's job now shows under the lead's name, on its Contacts tab and in a new Client column on the Leads list (the business, or the person when there is none). Before, they were saved but shown nowhere. Contacts has Add someone; Owner on Details is picked from your team instead of typed (it used to show a code); the shop fit-out details can be changed after the lead is made; probability reads Auto until someone sets one, instead of 0%; and Decide go / no-go is in every unpriced lead's ⋯ menu. Import leads from inbox now shows as a short request in the chat rather than the whole instruction, and Paste the message fills in when the client hopes to start. See CRM.

  • 4 Nov — Select several estimate lines and act on them at once. Ctrl-click (⌘ on a Mac) picks lines one at a time, Shift-click picks a run, Shift+↑/↓ grows it and Ctrl+A takes every line showing. A bar then shows what they cost together and lets you approve them, give them a cost code or a supplier, move them, set their labour rate, change quantities or rates by a percentage, group them under a scope, show them on the quote as one item, raise a purchase order or tender for just those lines, duplicate them into another section, copy them into a spreadsheet or delete them, each undoable from Undo. Each line now shows its cost code and you can change it there; setting a code or a supplier on one line offers to do the same for the lines that look like the same work. The assistant can see which lines you selected, so "move these to Electrical" works. See The estimate.

  • 4 Nov — Base asks you to reconnect a mailbox that stopped syncing. When your Gmail, Outlook or Google Calendar sign-in has lapsed, a box now asks you to reconnect on whatever page you are on, and brings you back there afterwards; admins are asked the same about Xero. Before, the only signs were a line on Home, the Integrations page and an email. See Integrations.

  • 4 Nov — The assistant explains why an email waited for you. Ask why it didn't just send, to CC someone, or to send from your own mailbox, and it names the switch (AI email sending or Business emails under Settings → Integrations), says an admin turns it on, and offers to do it for an admin. It also now deletes an empty estimate section when asked, and takes you to a page or tab ("open the Documents tab") instead of saying it can't.

  • 4 Nov — Make one quote from another template without changing your default. Ask the assistant for a quote "on our short brochure" and it makes that one document on the template you named; the template your business uses for quotes stays as it was. Home also stops redrawing itself a moment after it opens: the status strip at the top now starts the same way it was sent, then fills in.

  • 3 Nov — Your own quote template fills its totals and address. A quote or brochure template that says [Total ex GST], [Total including GST] or [Address] now fills them from the estimate and the job, the same as [Subtotal ex GST], [Total incl GST] and [Project Address]. Before, those three were left for the assistant to type in by hand.

  • 3 Nov — Home loads once, not twice. Opening Home in the afternoon or evening sometimes showed the page and then redrew all of it a moment later, because the greeting under the title was worked out on Base's clock and then again on yours. It now uses your business's time zone both times, so the page you see first is the page that stays.

  • 3 Nov — The chat follows the job you open. With the chat panel open, moving to another job used to leave the last job's conversation on screen until you pressed New, and the next message would have gone to that job. Now the chat starts fresh for the job you are on, and Continue brings back the old conversation in one press. A chat still writing its reply stays where it is. An RFI's PDF is now named "RFI-001 - " rather than "RFI RFI-001 - ". See Ask Base.

  • 3 Nov — A rate you tell the assistant is your rate, and RFIs show who and what they are about. Say "our rate is $27/lm" when adding a line and the rate book now keeps it as your own figure, confirmed by you, rather than as an AI guess waiting to be checked. A new RFI document shows the company it is addressed to, its status and a References table of the drawings linked to it (left out when there are none), and its heading reads "RFI-001" instead of "RFI RFI-001".

  • 3 Nov — Your job email follows your sharing choice, and you can share one email at a time. With Share my job email with my team off (the default), the tasks and notes Base makes from your own email are yours alone even when they are on a job, and they are assigned to you; turn sharing on, or share the email, and they go back to whoever would have had them. An admin turning project email sharing off for the business keeps everyone's email private. On Comms, your own email filed on a job shows Only you with a Share with team button, and the first time you open Comms with your mailbox connected it asks whether to share your job email. When something only guessed the job for an email in your mailbox, Base now reviews it in the background with a reasoning model and files it, suggests it, or drops the guess, and it learns from each review which senders write to you about jobs. See Comms.

  • 3 Nov — Watch and help your project agents from Claude or ChatGPT. With your own assistant connected to Base, ask "how are my project agents doing?" for every job's agent at once (what it is doing, what it needs from you, what it did and spent today), go into one job's agent and its tasks, answer its questions, change its tasks and settings, pause or resume it, and work through your Decide list ("what decisions are waiting for me?"). The same works when you ask Base's own assistant away from the agent page. Only the person who started an agent can change it; starting one and sending what it prepared stay in Base. See MCP connections.

  • 3 Nov — What Base makes from your own email stays yours. When Base reads mail in your connected Gmail or Outlook that isn't on a job or a lead, the tasks, follow-ups and notes it makes from it are now yours alone: assigned to you, in your own Home, Decide and Tasks, and hidden from everyone else in the business, admins included. Before, a task made from a bank letter or an invitation in your inbox could show up on the company task list or in an admin's Decide. (Since the next change, the same holds on a job while your job email is private.) The project agent also no longer reads a colleague's mail just because it looks like it belongs to the job.

  • 3 Nov — Give one price for the house and list the extras on their own. On a line's details, type a label under On the quote and that line prints as its own item on the quote, at its price including GST. Lines with the same label print as one item. Everything else becomes one price, [Plan Price], and the total doesn't change. Quote templates can now use [Plan Price], a list of extras ([Extra Description], [Extra Amount]) and your builder's licence number ([Your Licence Number]). See Show a line separately on the quote.

  • 3 Nov — Claims and RFIs fill more of your own layout. A progress claim template can now show contract works and variations in separate tables, each with its own totals, plus the contract total, net value to date and what was previously claimed net of retention. A variations page wrapped in data-repeat="variations_section" prints only when the claim has variations. An RFI now fills who it is to ([Recipient], [Recipient Company]), its [Status], and a References table of the drawings it cites.

  • 3 Nov — Seats are free. Every plan includes your whole team, with no limit and no charge for inviting more people. The Billing page now says so and no longer shows seat buttons; checking out a plan never adds a seat charge, whatever the size of your team. A second subscription can no longer be started beside the one you have: if a payment has failed, Fix payment first opens Stripe to update the card. See Billing.

  • 3 Nov — The project agent asks each question once, and sleeps when the job goes quiet. A blocked task now puts one question in Decide: when the agent rewords what it needs, the question you have is updated instead of a new one arriving, and a dismissed question stays dismissed until you next do something to that task. Questions now arrive even when the agent is stopped. An agent that has been Watching for three days with no input from anyone and no change to its tasks pauses itself, says why on its page and notes it on Home, so it stops spending on checks that find nothing; press Resume agent when there is work for it. A pass cut short by a restart or an update is recorded as interrupted, not failed. See Project agent.

  • 3 Nov — A document template can't save a placeholder its kind of document doesn't fill. A quote, claim, RFI or other template that uses a placeholder Base never fills for that kind ([Section Amount] on a quote), a repeating block over a list it doesn't have (several RFIs on an RFI) or a data-if condition (which does nothing) is no longer saved, by the assistant or in the Document Studio. Before, it was saved and every document showed the brackets, an empty block or the whole section regardless. The message names each one and lists what that document can use. Templates that already had one still save as long as a change doesn't add another, and the assistant lists what is left to fix. See Document Studio.

  • 3 Nov — Ask Base why you can't see a page. Ask the assistant "where are the RFIs?" or "why don't I have Timesheets?" and it now checks your access and tells you plainly: the module is switched off for you (and which of your admins, by name, can tick it under Settings → Team Modules), it isn't in your business's plan (Settings → Billing), or it isn't released yet. When the assistant can't do something for you, it now says who to ask too.

  • 3 Nov — Ask Base to pass something on to the Base team. Tell the assistant "let the Base team know…" with a feature request or a problem with Base, and it now sends it to our support inbox with your words, your business and the conversation, then tells you it was sent. We reply to you by email. Before, it had no way to reach us.

  • 3 Nov — Win from the lead's footer, and a won job wins its lead. An open lead now has a Win button in its footer at any stage, not only when Won is next. Marking a job won moves its open lead to Won with it, so a job being built no longer sits in your pipeline as Quote submitted. A job won without the signed contract and with no lead gets a Get the signed contract task on the job. Typing in the Win window (the reason, who accepted) works again.

  • 3 Nov — Win a job now, upload the signed contract after. The Win window and Mark won still ask for the signed contract or quote first, but no longer stop you: Win without it… says why the signed paperwork matters (it is your proof of the agreed price and scope, and every claim is measured against the contract sum), lets you note why it isn't here yet, and wins the job. Base then keeps asking: the lead's timeline records it, a Get the signed contract follow-up stays open and the job shows Signed contract missing — upload it. until it is uploaded. The same on the phone, and the assistant asks for the paperwork and explains why before it will win a job without it. See CRM: leads and pipeline.

  • 2 Nov — Emails can sign off with your title and phone number, and a template can't save a field its email doesn't fill. Email templates have two new fields, [Sender Role] and [Sender Phone], filled from the job title and confirmed mobile on the sender's profile, so a sign-off can say who you are and how to reach you. And a template that uses a field its email does not have ("Good afternoon [Contact Name]," on an invitation to tender) is no longer saved, by the assistant or on the page. Before, it was saved and every email went out showing the brackets. The message names each field and lists the ones that email can use. See Email Studio.

  • 2 Nov — A new job gets its own chat. When you move on to another job partway through a conversation, Base offers a Continue in a new chat card: one press opens a chat for that job beside this one, with its plans carried over, and starts it, while this conversation stays on screen. Or ask Base to move this chat to the other job. Base also now stops when it keeps hitting the same wall and tells you what is in the way, instead of retrying. See Ask Base.

  • 2 Nov — Signing up on the phone stays on the phone. An account made in the Base Management app now confirms back into the app: tap the link in the email on the same phone and the app opens, signed in, instead of a web page asking you to pick a plan. See Welcome to Base.

  • 2 Nov — The CRM speaks your trade. New lead is one page — who it is for, the site, the job, the value and when the price is due — with Create lead always on screen and the rest under More details; Paste the message fills it in from an enquiry email or text. Homeowner leads are no longer asked for a tenancy or a shopping centre: each pipeline says whether the shop fit-out details show, which job types it offers (new homes, renovations, kitchens, steel, framing, joinery and more), and whether money is typed inc or ex GST. A lead's Details now edit the value, job type, site address, quote due (or tender close), expected start, weeks and estimator. New templates for steel fabrication, framing and prefab, and builder joinery. A builder's Contacts page shows its leads, quotes and your hit rate with them, with New lead for this builder. See CRM and Pipelines.

  • 2 Nov — A job is won on the signed contract. Moving a lead to Won — dropping it on the board, the stage menu, Move to Won, Accept for client or the phone — now opens a Win window. It says what Base already has, and asks for the signed contract or signed quote first: upload it (or take a photo on the phone), or pick the signed one already on the job. Then it asks Mark the job won too? and opens the job's Mark won, or offers to create the job from the quote. Not signed yet keeps the lead where it is and adds a Get the signed contract follow-up. Mark won on the job asks for the same paperwork, quotes can be marked Preliminary (accepting one moves the lead on and never wins the job), and won jobs without their signed contract say Signed contract missing — upload it. See CRM: leads and pipeline.

  • 2 Nov — One pipeline at a time, everywhere. With more than one pipeline, Next up, Work in hand, Tenders and Win & loss now have the same Pipeline chips as the board, with All pipelines as well, and the figures above the board follow the pipeline it shows (and Just mine). Every list names a lead's stage the way its pipeline does and goes stale on that stage's own limit. Enquiry links and booking pages choose the pipeline their leads land in and the source they carry, Base asks whether new enquiries should go to a pipeline you have just made from a template, a new residential builder starts on New homes, and a business that had leads before pipelines sees a short What changed note on the board once. See Pipelines, stages and lead fields.

  • 2 Nov — Tidy up your leads. The Leads tab has a Tidy up view that gathers leads that look like tests, duplicates, leads on archived jobs, enquiries nobody answered in a month and leads nobody owns — tick a group and close, assign, move, start a sequence on or delete them in one go, or ask Base to suggest a clean-up you approve. Tick boxes on the list bring up the same bar. A lead can now be deleted from its ⋯ menu (never one on a won job), duplicates merge on screen, Not a duplicate stops two leads being paired again, and two leads for one job are always flagged. Closing a lead asks why with no default reason, in words that fit homes and trades as well as fit-outs; Not a real lead and Duplicate leave every number and Our builder didn’t win it leaves your hit rate. When a job is archived with its lead still open, the owner is asked whether to close it, and the lead says Job archived. See CRM: leads and pipeline.

  • 2 Nov — The CRM starts you off. The Pipeline now opens on Next up for everyone, with a Start here panel above it on a new or busy pipeline: what the CRM is for in a paragraph, then tidy up, answer or close old enquiries, give every lead an owner and pick stages that fit, each with its count and one button. What do these words mean? explains hit rate, likely to win and the rest. Next up's buttons do what they say (Open estimate opens the job's estimate), and ⋯ on a row assigns the lead or closes a test as Not a real lead, left out of every number. On the Board, the rails show five with +N more, Called them is now Already in touch (it no longer logs a call nobody made), the strip says how many follow-ups are overdue, "likely to win" uses your hit rate everywhere, cards show the owner's name, and won leads are dated by the day they were won. See CRM: leads and pipeline.

  • 2 Nov — New enquiries reach your phone, and one chase per lead. A new enquiry (from an enquiry link, your inbox or Base Connect) and a booking now tell one person straight away: the one each pipeline names, else the business owner, with a notice in Base, an alert on their phone or computer, and a text from your own number if the pipeline is set to send texts. Tapping the alert opens the lead. While a follow-up sequence runs on a lead, the Quote Follow-Ups pack stands aside on it, and starting one offers to close the pack's chase tasks. A check-back sequence now runs on a lost lead; a reply, or a finish with no reply, gives whoever started it one notice; Next up shows a sequence's next step; and there is a Builder quote chase starter ("Has the head contract been awarded?"). The assistant can find leads by when they came in, days in stage, no owner and your own fields, and change many leads at once after showing you each one. Import leads from inbox now includes repeat builders, asks the pipeline and close date, and saves the attachments on the lead. See Follow-up sequences and CRM.

  • 2 Nov — Work your leads from the phone app. In the Base Management app a lead now has Move stage (your business's own stages, with Won asking the value and Lost asking why), Log a call, Note and Edit details (value, likelihood, follow-up date and your own fields), plus Call, Text and Email. + on Leads adds a lead from site in a few taps, and with more than one pipeline you can switch between them at the top. See Base on a phone.

  • 2 Nov — Pipelines of your own. Name the stages your leads move through in your own words, add or remove stages, and make a pipeline for each kind of work — kitchens, new homes, service calls — each with its own board. Start from a template for your trade or let Base work one out with you in chat. Each stage can carry a line telling the team what happens there, its own stale limit and a likelihood. See Pipelines, stages and lead fields.

  • 2 Nov — Your own fields on every lead. Add the questions you ask every client — the budget, the land, the finish — as fields on every lead or on one pipeline's leads. They show in the lead's Details, the New lead form asks for the ones you mark, and up to two can show on the board's cards.

  • 2 Nov — Follow-up sequences. A new Sequences tab in the CRM holds your own follow-ups: a few emails and tasks on a timeline ("day 0 thanks, day 3 a nudge, day 6 ring them"), written in your words with each lead's details filled in. Each email either sends by itself, from whoever started it, or waits for you to press Send. Start one on a lead from its drawer under Follow up with; it stops by itself when the client replies by email or text, or the lead is won or lost. Four starters to copy, or ask the assistant to write one. See Follow-up sequences.

  • 2 Nov — See when a client opens or clicks. Emails Base sends about a lead now show Opened, Clicked (with how many times) or Bounced on the lead's Emails tab, and the lead's timeline notes the first open and the first click. A quote shows Clicked when they followed its link. Opens were not being recorded at all before this; they are now.

  • 2 Nov — Clients can book a site visit with you online. Make your booking page under Settings → Booking: your hours, how long, the gap you need between visits and how much notice. Clients open the link from your website, an email or a QR code, pick a time you are actually free (your Base calendar and your connected Google or Outlook calendar are checked), and leave their details. The meeting goes into your calendar, they get the invite with a button to change or cancel it, the lead goes into your pipeline and you are told. On a lead, Get booking link sends a link with the client's details filled in. See Booking.

  • 2 Nov — Free trials from Base. If Base has given your business a free trial, Billing shows how many days are left and lets you choose a plan at any point. Choosing early costs you none of the trial: your card is first charged on the day it would have ended. When a trial ends without a plan, Base shows the plans; nothing you made is deleted. See Billing.

  • 2 Nov — Document Studio is three tabs: Create, Library and Brand. Create has three ways to start, each under its own heading: Describe it, Start from an example (each shows the cover and an inside page it would make from your own logo and photos) and Use a template (the ready-made ones). Library holds your own documents in three groups: in use, not in use yet, and documents. Brand has your business details, your logo, photos and colour, and your quote wording and contract terms (open, ready to fill in), which used to be spread across the editor, Settings and the bottom of the home page. Each part opens with a short note on what it is for, and admins can add another company you run with Add a business, without leaving the studio. New document is beside the page title.

  • 2 Nov — Matching a quote now brings its logo, colours and fonts across. Attach an existing quote, letterhead or set of plans (PDF or Word) when you ask the assistant to match it, and your logo is lifted out of the file, cleaned onto a transparent background and saved to your asset library, in a version for light backgrounds and one for dark. The quote's exact colours and fonts are used for the new template. Each logo is checked before it is saved, and one that does not come out cleanly is not saved. The photos in a PDF can now be brought across too, at full quality, not only those in a Word file.

  • 2 Nov — One brand colour, set in one place. The Brand colour row in Document Studio → Brand → Logo, photos and colour is the colour every document Base generates uses. The house fonts setting is gone (documents designed for you choose their own type), and so is the second colour picker in Quote wording and branding. Your colour is unchanged.

  • 2 Nov — The assistant asks before changing which template your Quote button uses. If another template already fills that button (or Scope of works, BOQ and the rest), the assistant now asks you before switching it to the new one.

  • 1 Nov — Asking the assistant for a new template no longer leaves a spare copy. When you started from the Document Studio home screen, the assistant could lose track of the template it had just made. It then saved a second copy into your library, and sometimes stopped to say no document was open. It now keeps working on the one it made, names it in place, and opens it in front of you.

  • 1 Nov — Document Studio's editor fills the screen. Inside a document the page now runs edge to edge, like the project agent, with every control in one toolbar along the top: All documents, the name, Editor / Asset library, Save and PDF on the first row, and the formatting tools, Portrait / Landscape and the Heading colour on the second. The inspector floats beside the page and the panel button shows or hides it; the page count sits in the bottom-left corner. See Document Studio.

  • 1 Nov — Inclusions and exclusions side by side carry on together. When a two-column page of what's included and what isn't runs past one sheet, both columns now fill the first sheet and each carries on in its own column on the next. Before, everything not included jumped to the next sheet and left the first half empty. Long inclusions taken from an approved scope are also shortened at a whole word and end in "…", instead of stopping mid-word.

  • 1 Nov — You can see where each page ends in Document Studio. Every page of a template now has a black bar between it and the next, with a PAGE 2, PAGE 3 tab, including designed templates with photos and coloured pages, where the pages used to run together. The bar is only on screen; it never appears in the PDF.

  • 1 Nov — Design a template from a sentence. In Document Studio, type what you want ("a modern black and gold quote with an about us page and photos on every page") and press Design it: a finished-looking template opens in about a second, with colours, fonts, page layouts and your own photos chosen to match, and the wording follows a few seconds later, written for your business. Its cover, about and acceptance pages are always exactly one sheet; the schedule and terms carry on over as many sheets as the job needs. You can also ask the assistant for one in chat. See Document Studio.

October 2026

  • 31 Oct — Your email is private unless you share it. Email from your own connected Gmail or Outlook is now private to you even once it is filed on a job. To let your team see the job email from your mailbox, switch on Share my job email with my team under Settings → Integrations. Base follows the same line everywhere: your private email is not summarised onto leads, its attachments are not saved to the job by themselves, Base's email triage leaves it to you, and a bounce of something you sent from your own mailbox is told to you rather than to the admins. Answers to an RFI and a subcontractor's claim still reach the job. The admins' switch is now Let people share project email with the team: off still means nobody's is shared.

  • 31 Oct — The tour's Comms chapter shows a conversation and links your inbox. If Comms is empty, the tour adds a sample Welcome to Base email and opens it, so you can see what a conversation looks like. It points out the button that gives your assistant its own Australian mobile number, then takes you to Settings → Integrations to connect your Outlook or Gmail, and shows the switch that keeps your email private.

  • 31 Oct — Set up your finances, in order. A new Settings → Finance setup page lists the eight things to set up for your money — where your books live, your default accounts, cost codes, which account each code posts to, Xero job tracking, job numbers, payment terms, GST and bank, and approval limits — in the order that works, ticks each from your real settings, says why each one matters, and lets you mark a step fine as it is. The getting-started checklist's Connect Xero step is now Set up your finances, and Money shows a slim Finance setup: 5 of 8 done bar for admins until it is finished. See Setting up your finances.

  • 31 Oct — Base walks you through it. Set up with Base has the assistant go through what is left one question at a time, explaining what each setting does for your money before it asks, and saving only when you say yes. Accounts Base suggested when you connected Xero now say so until someone checks them, and are never suggested again after you save them.

  • 31 Oct — A tour chapter for your finances. Take the tour has a new Your finances chapter after the rate book: Money (what is free after what you owe, runway, GST set aside, and Decide, where money waits for a person), then Chart of Accounts, Cost Codes and Finance settings. It ends on Finance setup, hands over to Base to set yours up, and carries on by itself as soon as you finish a step.

  • 31 Oct — Practice jobs are marked everywhere. A practice job carries an amber Practice job tag wherever a job is listed or picked, on the web and in the Base app, and a notice across the top of every page of the job. Money and Xero say how many practice jobs are left out of their figures, and the projects list can show, hide or list only practice jobs.

  • 31 Oct — Switch a job between practice and real. An admin can make a practice job a real one, or a real job a practice one, from the job's Dashboard under Project details. Base says what changes first and keeps a record of who switched it and when.

  • 31 Oct — Practice paperwork says so. Every document made on a practice job carries PRACTICE — NOT A REAL DOCUMENT across each page and a line at the foot — the copy in Documents, the one you download and the one anyone receives. Sending a quote, claim, purchase order, variation, tender, RFI, signature request, portal invitation or text from a practice job asks you first; the assistant asks too, and automations never send from one.

  • 31 Oct — Out-of-date account suggestions clear themselves. A suggestion on Chart of Accounts → Changes whose account has since been archived or removed now leaves the queue with the reason, instead of failing when you approve it. Only a change Xero refused offers Try again, and History reads in words.

  • 31 Oct — The tour makes your first quote template with you. The Document Studio chapter of Take the tour now copies the standard quotation into your account as My quote template and opens it in the editor, explains the editor, then asks Base for three changes while you watch: a new colour scheme, your business name in the header, and an About us section. It goes on to the Asset library, adds two demo photos, has Base scan them, and puts one into the About us section. The template is not used for anything until you set Used for to Quote, and the demo photos can be deleted whenever you like. Replaying the chapter reopens the same template and does not add the photos twice. If Base asks you something on the way, the tour waits for your answer. In Document Studio, clicking on a template without typing no longer counts as an unsaved change, and once a template is open the first step in Set up your template no longer offers to start another.

  • 30 Oct — A new Home. Home opens on a brief of your day, the way a personal assistant would tell it — who's on site, meetings, inspections, what falls due in the next few days, what Base finished, the decisions waiting and the money in a line — read aloud at the speed you choose, beside three numbers: what waits on a yes from you, who's on site now and what clients owe. Underneath, tabs: Today (Decide and Needs you), Jobs, Mail and My cards, and Home remembers the one you were on. The header now says both lists, "64 to decide · 37 need attention", and a money decision shows only in Decide. See Home.

  • 30 Oct — Mail on Home tells you what to do. Mail that needs you is briefed as you open it: Base's summary first, only the checks that didn't match, then buttons that fit the email — Start the estimate from it for a request to price with plans attached, Reply: we'll price it, Decline politely, Close the RFI with this answer, Record and assess the claim, File the attachments and more. Each opens the assistant on that email to do the work, and it waits for your OK before anything is sent. The email itself folds to one line once there's a summary.

  • 30 Oct — Every decision on Home has a real button. A drafted chase or reply in Decide now shows the email on its card — who it goes to, the subject, the words — with Send and Edit, beside the decision rather than under it; when the draft came with nobody to send to, Base fills in the likeliest person for you to check, and you can add more people or take them off as chips. Anything that needs more than a yes has Get Base on it, which hands the assistant the decision with its context to work through with you; the page it is about is the link beside it. Needs you rows gain Get Base on it too.

  • 30 Oct — Emails on Home read like emails. A conversation in Mail no longer opens with a stray "Email" line or a big empty gap: each email shows who sent it and when, then its paragraphs, the signature set apart underneath (a signature whose lines had run together is split back apart), and links, addresses and phone numbers you can press. What a reply quotes is folded under Earlier in this email. Mail arriving from now on is stored cleaner too.

  • 30 Oct — Make your decisions on Home. A new Decide section on Home holds every decision waiting on you — money to approve, a job's agent asking which way to go, drafted emails to send, approvals — and you make each one from its card: Approve, the agent's options, Approve and send. The card turns green and folds away at once; if it could not be done it comes back with why. Anything that needs its own page opens it. See Home.

  • 30 Oct — Decide reads at a glance. Each money decision now shows what it does in one line, what it changes (a forecast's expected final before and after, and the margin it moves), and why it came up in one line, with the figures and full reasoning under The working. Approving or rejecting answers at once: the row turns green with what was done and folds away, and comes back with the reason if it could not be done. A forecast cut proposed by the watchers can now be approved; it records the proposal's reasoning, or your note, as the reason. See Money.

  • 29 Oct — Your own cost codes code things automatically. When Base codes a line, bill, order or claim by itself it now uses your codes — including ones you imported with no trade, matched by their name — never a group heading and never a code you switched off. Importing without a trade column reads each code's trade from its name and marks it from the name so you can check it; renaming one of Base's starter codes in your file no longer keeps its old trade.

  • 29 Oct — Bills from Xero code themselves better. A bill pulled from Xero without a cost-code tag is coded from the account it is on, its line descriptions or the supplier; if none of those says, it waits for Suggest codes instead of going to General. Suggest codes offers only codes you can use, each under its group (Site works › Excavation), however long your list.

  • 29 Oct — Accounts found in your own chart. Overhead codes post to the matching account in your chart, found by name, or your default purchases account; a bill is filed as an overhead on its own only when your chart's account is an expense or overhead account with a matching name. Connecting Xero suggests revenue, cost and bank accounts by type from your chart. Jobs converted from a lead or imported from Xero take your job numbering.

  • 29 Oct — Settings, sorted. The settings menu and hub now group pages by what they are for — Business, Finance (Chart of Accounts, Cost Codes, Finance, Job Numbers, Plant & vehicles), Team & permissions, Workshop & engineering and Connections & AI — with the pages in each group in alphabetical order.

  • 29 Oct — Add and import from the top. On Settings → Cost Codes, Add a code and Import from a spreadsheet now sit above the library and open their forms right there, so you no longer scroll past the whole list to start one; a new code can take its account as you add it. On Settings → Chart of Accounts, Add an account sits above the chart and Add a tracking category above the categories. See Cost codes and Chart of accounts.

  • 29 Oct — Private clients. Add a homeowner or a couple as a client without a business name or ABN: Contacts → Add contact → Private client, or from any client picker. They go by their names on quotes, claims and the portal ("Michael & Sarah Downes"). See Contacts.

  • 29 Oct — A new job doesn't need a client yet. Skip the client on the New Project form and add it later on the job's Client page. A claim can't go to Xero until the job has one.

  • 29 Oct — Import your contacts. Contacts → Import brings in a client, supplier or subcontractor list from a CSV or Excel file — you see every row first, fill blanks on a match or skip it, and can download a template — imports just your contacts from Xero, or hands the list to Base in chat.

  • 29 Oct — Your own job numbers. A new Settings → Job Numbers page sets how jobs are numbered: year and number (26-033), a prefix and number (KDB-1042), prefix, year and number (KDB-26-042), or your own format; whether the count starts again each January; the next number, so you carry on from your old system; and a different prefix per job type, counting together or separately. The New Project form and Create project from a lead fill in your real next number, confirmed when the job is created, so two people creating jobs at once no longer clash. You can still type your own, and existing jobs keep theirs. See Job numbers.

  • 29 Oct — Import your cost codes. Settings → Cost Codes imports codes from an Excel or CSV file. You see every row first — new, changed, unchanged or skipped and why — and nothing is saved until you press Import. Download a template, or export your current codes to edit and import back. See Cost codes.

  • 29 Oct — Group and order your cost codes. A code can sit under a parent, so a group like Site works holds its own sub-codes, shown indented. Drag a row or use the arrows to set the order; a group's sub-codes move with it. Search by code or name; inactive codes stay hidden until you switch on Show inactive.

  • 29 Oct — Where your accounts come from, said plainly. Cost Codes and Chart of Accounts now say that cost codes are Base's own, and that the accounts they post to come from Xero when it is connected (Base's own chart when it isn't), with Connect Xero or Refresh from Xero right there.

  • 29 Oct — Set the business up with Base. In chat, Base can import your cost codes, set your job numbering and bring in your contacts, showing you the plan first and saving only when you say yes.

  • 29 Oct — Joinery drawing and manufacture tasks show on the programme. A joinery job's shop drawing and manufacture tasks now appear on the programme list and the Gantt; they had been left off.

  • 29 Oct — The guide walks the end of the job. Handover is now its own steps: practical completion, defects closed, the handover pack, the final claim, retention released and the outcome recorded, before the job closes. Open defects are counted again; the guide had been showing none.

  • 29 Oct — Email files to the right job more often. A reply carrying a tender or order's [Ref] code, or part of a conversation already filed, goes to that job. A subcontractor working on two of your jobs is no longer filed under the newest by default.

  • 29 Oct — A support page. basemanagement.org/support says how to reach us (support@basemanagement.org), where the guide is, and how to delete your account. The iPhone app links to it from More → Help & support.

  • 29 Oct — A new Base logo. The dot mark beside the Base wordmark on the sign-in page, the portal, the browser tab, the home-screen icon when Base is added to a phone, and the footer of the emails Base sends. The side bar keeps BASE over your workspace.

  • 29 Oct — One orb in the chat. The small orb beside the chat's title is gone; start voice mode with Voice mode beside the message box.

  • 29 Oct — The job's guide asks for the signed quote. A new step, Have the signed quote on file, ticks once the client's signed quote, letter of acceptance or purchase order is on the job, whether it was signed through Request signatures, dropped into Documents or brought in from an email.

  • 27 Oct — Base suggests cost codes for uncoded lines. When an estimate has lines without a cost code, a note above it offers Suggest codes: Base picks a code from your library for each line, ticks the ones it is sure of, and offers its next best for the rest. Nothing changes until you press Accept. It works on a won job too, because a cost code moves no money. On a job's Invoicing tab, generating or rebuilding the schedule of values offers Suggest codes first while estimate lines are uncoded.

  • 27 Oct — Fixes to notes that close themselves. A note waiting on a sub's insurance or WorkCover for a job now closes when the certificate is uploaded; it used to stay open. A note asking for a signed subcontract and a certificate no longer closes on the signature alone: it says what is still missing.

  • 27 Oct — A second admin approves the run you built. When your business has two or more admins, pressing Approve & build ABA on a payment run you drafted yourself is refused with who can approve it instead; another admin approves it. A sole admin approves alone, and a run Base drafted on the weekly schedule has no builder, so any admin approves it.

  • 27 Oct — Several orders on one job are one card on Decide. When the hourly tick holds more than one purchase order on a job, Money → Decide shows them as one card — the job's name, N orders to issue — $total ex GST, each order with its own Approve and Decline, and Approve all, which approves them one after another and stops at the first that is refused, saying which.

  • 27 Oct — One month-close decision closes every job. The close-month reminder on Decide now names every job with a month to close, and approving it closes each job's month in turn — stopping at the first that cannot close and saying why, with the ones before it done and the rest still waiting on the same decision.

  • 27 Oct — A purchase order goes out with the subject you typed. The subject line on the Issue screen, and a message written for that send, now reach the supplier's email when the order is issued through Decide — the decision carries them. The order itself keeps its own notes.

  • 27 Oct — Every money button is one decision, and Decide remembers it. Certifying, disputing or marking paid a subcontractor claim on Job Costs, changing a progress claim's status or recording its payment on Invoicing, and issuing a purchase order from the Issue screen or the Procurement board now run the same decision Approve on Money → Decide runs, as you, within your approval limit; over it, the row waits on Decide and the screen says so. Decide gains a History tab listing everything decided — who, when, the kind and the outcome. The database itself now refuses a member's direct write of a bill's, claim's or prepayment's money and status columns, and pay rates and PINs are readable only by people with the pay-rates permission. The Payments page and the assistant read payment-run candidates from one list, so a business with more than a thousand bills sees them all. See Money.

  • 27 Oct — Xero follows Base, when you switch it on. A new switch under Settings → Finance → Automation, Xero follows Base, off until you turn it on: every sent claim, approved bill, issued order and paid run's payments reach Xero within five minutes, and a change you make afterwards goes too; a subcontractor's payment is now recorded in Xero, net of any no-ABN withholding, and a payment whose bill was not in Xero yet waits for the next pass instead of being dropped. While the switch is off nothing is pushed by itself, and when there is something Base could have sent, one card offers to turn it on. The Xero page says, beside each claim and bill, whether it is in Xero, changed — going to Xero, waiting for Xero or retrying with the reason. See Finance settings.

  • 27 Oct — Automation asks before it runs. Every finance automation is off until you turn it on, and now offers itself at the moment it could have helped: when a switch is off and Base finds something it would have done this hour — a routine sign-out it would have approved, a bill waiting on the order it pays, a bank line that matches an approved payment run, a draft order it could have issued, a payment run it would have drafted, records it could send to Xero — one card slides in for an admin with what it found and Turn it on. Not now asks again only when the same thing comes up after a week; Don't ask again stops every card. Bill auto-approval needs a limit first, so its card takes you to set one. See Finance settings.

  • 27 Oct — Job Costs reads in plain words, and every figure agrees. The trade table now shows Budget, Owed (what the orders and signed subcontractors still have to bill), Spent (what it has cost, with the part not billed yet named under it), Expected final (spent + owed + still to buy) and Over/under; Still to buy and Var % sit in Accountant mode. The panel at the top is four numbers — Contract, Expected final, Margin at completion and Spent — with earned to date and margin to date under What's in it. Under it, Needs doing lists everything those numbers are waiting on, one action a row: bills to approve or attach, held bills, hours to approve, costs and orders on no trade, variations built before the client agreed, an estimate that moved. The Cost Summary card and the cost-by-trade chart are gone; the money strip, the CPI badge, the anticipated strip and the By Cost Type, By Cost Code and Schedule of Values tabs are in Accountant mode. Purchase Orders links to the Procurement board filtered to the job, and Upload invoices is under Add cost. Every figure on the page, the Money page, the WIP and the reports now comes from one calculation, so they agree. See Job costs and supplier bills.

  • 27 Oct — Bills land one way, and a copy is held. Every bill — typed, read from a file or a receipt, from the assistant, or pulled from Xero — now goes through the same intake: its money is checked (subtotal + GST = total, GST within the rate; a mismatch holds it with the reason), it is placed on its order or trade, and it is checked against every bill on the business for a likely copy: same supplier and invoice number, the same file, or the same amount within a dollar in the same three weeks. A likely copy lands held as a possible duplicate: it counts nowhere, cannot be approved and is never put on an order, and one Needs-doing item asks you to keep one. If it is not a copy, clear it on the bill. A bill from Xero with no job now waits on the holding job instead of being dropped, and a Xero bill whose amount changed after approval asks you about it.

  • 27 Oct — The routine work comes off people. Two new switches under Settings → Finance → Automation, both off until you turn them on: Approve routine shifts approves a crew member's own sign-out on a job — not closed at midnight, not edited, not typed in, not daywork — when the hours are within the Job Costs tolerance of their usual day, and leaves the rest for the foreman with one line a day on Home saying what it did; Draft a payment run's paid confirmation from the bank line turns a matching bank line into a Mark paid decision for you to confirm. With bill approval on, a bill that arrived before its goods is matched again when the delivery is recorded and approved if it fits (undoing the delivery takes that back), and each bill that still does not match gets one Approve bill decision with the reason. A subcontractor's payment schedule is now proposed two business days before it is due. Decide asks less: one Close month decision per business at a time, the Issue order decisions of one job marked as a bundle, and a line on Home the day before decisions lapse unread.

  • 27 Oct — Numbers that are not known say so. On Job Costs and the Money page a job with no budget now shows Earned to date, Margin to date and Unbilled as not known instead of $0, and the True value panel tells you when it could not load, when the job is not a live one, or when the figures are a stored day's. A cost-plus job's two margin tiles say cost-plus: the fee is the margin. The Purchase Orders tab counts issued orders only. In Accountant mode the panel's Internal costs and Not yet billed rows now explain the sum they show. The Correct button on the contract sum shows only to people who may use it.

  • 27 Oct — Ticks mean paid-for. Under Outstanding — not yet ordered, a bill matched by its words ticks a line only when it covers at least half of it; a smaller one shows part-invoiced $150 of $12,000 and the line stays outstanding. A tick you made yourself always stands. A Xero bill nobody has approved ticks nothing yet. When every tick on a trade is a word match, the note no longer suggests cutting the still-to-come.

  • 27 Oct — Paper means paper, and payment runs carry claims. The file attached as a bill's invoice must be filed as an invoice (or a receipt, claim or credit note), and an order's quote as a quote, tender or price list; any other file is refused with the reason. An Other cost with a payee needs its invoice too. The Payments page holds back a bill with no invoice, as the weekly run already did; the weekly run now includes every certified subcontractor claim; and a draft order Base would issue but cannot, because its quote is not attached, appears on Money → Decide asking for the quote. A claim pushed to Xero takes its due date from your payment terms when it has none, and a date typed as year 0026 is refused before it is sent. Bills pulled from Xero read Approved in Xero on Cost Entries.

  • 27 Oct — Weeks and months are yours, not UTC's. Labour and plant are posted to the week the shift happened in your time zone, and the month Base suggests closing is worked out on your calendar. A visitor's photo on a unit note is capped at 6 MB (crew keep 15 MB).

  • 27 Oct — See a file before you open it. Rest the mouse on a document's name or link anywhere Base shows one — the Documents library, a job's Documents tab, a lead's files, a tender's quote chips, the Invoice, Receipt and PO links on Job Costs, a claim's document, a task's attachments, compliance documents, the handover and safety registers — and a card shows the file itself: the first page of a PDF with its page count (a drawing sheet gets a wider card), or the photo. Move off and it goes. Spreadsheets and Word files show no card. See Documents.

  • 26 Oct — Three new built-in notices, and Base can read your approvals. When a hold point passes and frees its task, whoever runs that work hears it can start; when an approval condition that held up the programme is met, the head PM hears; when a subcontract is ticked signed by hand, the head PM hears. Nobody is told about what they did themselves. Base can now tell you which of a job's approval conditions are still open and when an approval lapses, and can record a hold point passed with a certificate already on the job's register.

  • 26 Oct — More of Base's notes close themselves. A note about a hold point closes when it is passed, one about an approval about to lapse when the renewal is recorded, one about an approval condition when its task is done, one about a document when it is approved or sent, one about a sub's licence or ABN when the register shows it verified, one about a subcontract when it is signed, and one of the job's money checks when the figures are fixed. New moments to build automations on: a hold point passed, a certificate verified, a subcontract signed and an approval condition met.

  • 26 Oct — Base sees what a subcontractor uploaded. Certificates a subbie uploads through their compliance link or the Base portal now show to Base when you ask about them, on the job's Safety summary, and on their card: a certificate on file that nobody has checked shows amber, On file — check it and verify, and Verify records it with its expiry date. Uploading insurance or WorkCover now asks for the expiry date on the certificate, so Base can remind you before it runs out.

  • 26 Oct — Base's notes close themselves when the thing they asked for happens. A note about a task closes when the task is done, a note about a claim when it is paid, and a note waiting on a sub's paperwork when their compliance pack lands; when only part of it has arrived, the note says what is still missing. When the record alone cannot say, Base takes one quick look and closes the note if it is done, with a line in the ledger saying why. Undo in the ledger reopens one for a day.

  • 26 Oct — Edit a schedule of values line yourself. On a job's Invoicing tab, while the schedule is unlocked, click a line's description, cost code or scheduled value to change it, add a line, or delete one that has never been claimed. Under the table, Against the contract shows whether the lines add up to the contract sum. Base can make the same changes from chat again: its edits to the schedule had been refused since mid-October.

  • 26 Oct — Base's walkthroughs stay on track. When Base takes you to a page to show you something, it now knows the page has opened instead of opening it again, it tells you when something it meant to point at is not on the page instead of waiting in silence, and it can point at a row of a table, not only at buttons.

  • 26 Oct — An answered question shows once. When you answer Base's question, it folds to a line marked You answered with your answer after an arrow, and the answer is no longer repeated underneath as a message from you. Anything else you typed with your answer still shows on its own.

  • 26 Oct — Email signatures no longer land on your jobs as site photos. Logos, accreditation banners and signature cards that ride along on a sub's reply or a synced email are now left out when the email's files are saved to the job, whether the reply came to Base or to your own Gmail or Outlook. Pictures pasted into an email at full size (a render, a site photo) are still saved.

  • 26 Oct — Tenders show who they are from before you send. The tender send screen has a From line above the email: your own Gmail or Outlook address, or Base's. When it is Base's, a note says why that can lose a reply (a sub's office that forwards the invitation round before answering can reply to Base instead of you), and an admin can switch on Business emails right there with Send from my Gmail or Send from my Outlook. The chat's ready-to-send tender card says the same. New businesses start with Business emails on.

  • 26 Oct — Base suggests who should own each task, and says why. Open a task to see who Base would give it to and why ("Head PM on 14 Smith St", "Has taken 7 of the last 8 tender tasks", "Has room this week"); the owner menu shows the same suggestion at the top. Base learns from every change: when you move a task off its pick it asks why in one tap (away, too busy, not theirs, needs a licence, the client's person), and it never changes an owner a person chose. Once it is sure and your team's record agrees, it gives new unowned tasks out itself; an admin can switch that off on Settings → Tasks → Owners, which also shows how often its pick was kept. Patterns it notices come to AI Memory as rules to keep or bin, at most two a week.

  • 26 Oct — Base's notes on a job tell you what to do when they take you somewhere. Press a note's button that opens a page (Open Job Costs, Review) and the chat starts a conversation about it: Base says in a few lines what to do on that page and points at the first thing to press, and when it knows which button it is, that button lights up as the page opens. The notes beside the chat are also easier to read: a coloured edge instead of an amber fill, the chat's green button instead of a black one, buttons that keep their words on one line, Base's suggestion under the reason, and a drawer that widens on a bigger screen.

  • 25 Oct — Terms of Service and Privacy Statement updated. Both now call the product Base throughout and name the company exactly as registered: BASE MANAGEMENT TRADING PTY LTD, ABN 73 700 115 466. Nothing you agreed to has changed.

  • 25 Oct — One setting for how much GST to put away. Settings → Finance had two (a buffer under GST and a share under Targets) that disagreed, so the GST report suggested 10% more than the Money page set aside. It is now one figure, under Targets, and the Money page, its alerts and the GST report all use it.

  • 25 Oct — Pages that are about figures open with the one that matters. Money leads with what is free after what you owe, Cashflow with the lowest balance ahead, Procurement with the orders that need a person, Stock with what it is worth, Maintenance with the requests past their deadline, and a job's Costs with where the job finishes (forecast margin, then the revised contract sum, forecast cost and cost to complete); a job's Dashboard leads with its contract sum. Each has a next step underneath. Reports picks a report from one row, keeps its filters in one bar, and draws the margin bridge from zero with a loss in red. Receipts and Scratchpads are tidy lists.

  • 25 Oct — Every tab inside a job has the same heading, with its buttons beside the title, and the boxes that stacked up on Hold points, Safety, Site, Drawings and the Client tab are fewer and flatter: an empty section is one line. Costs keeps its tabs on one line with each tab's buttons under them. Programme opens on your work instead of an empty week. The Manufacturing board fits the screen, and a unit's due date, like Workshop's, is picked from a calendar. Subcontractors shows a long scope as four lines with Show all, and a compliance warning once.

  • 25 Oct — Dropdowns, switches and dates look the same everywhere. The browser's own dropdowns, date boxes and checkboxes left on Settings, the LGS calculator, Renders, the Diary, Reports, Receipts, Cashflow and a job's purchase orders are now the app's. On Settings → Meetings each meeting is a one-line summary you open to edit; Team Modules gives the editor the full width; Cost Codes opens a row to edit it and names each trade; Interest fits its table; Billing names each invoice by plan and month. Explainers on Teams, a job's Team page and Team Modules open on your first visit and fold to one line after.

  • 25 Oct — Every page your link opens looks like Base and names your business. Forms, enquiries, signing, tenders, RFIs, subcontractor compliance and claims, booking confirmations, part labels and the crew sign-in now carry the Base mark and your business's name, follow the visitor's phone or computer light or dark setting, and ask for a QBCC number only for Queensland work. On a tender link, Submit tender comes straight after the scope. A password-reset link that has expired says so, instead of loading forever, and a part label scanned on a phone reads properly in dark.

  • 25 Oct — The website, the guide and the sign-in pages follow your device's light or dark setting until you choose one (inside the app, dark stays the default). The guide no longer shows authors' notes, its links between pages work, and on a phone the website has a menu. Browser tabs read "Page · Base" once, not "· Base · Base".

  • 25 Oct — Base's question cards do more. Yes/no buttons, ratings, putting things in order, date ranges, typed answers and a recommended choice; a long list has a filter; Not now puts a question off; press a card's title to minimise it or × to dismiss it (Undo brings it back), and the plan, email-draft and tender cards fold and hide the same way (hiding sends or discards nothing). An older question you never answered stays in the chat as Not answered instead of disappearing. Answers whose options contain a comma come back correctly when you reopen the conversation. Headings, tables, code (with Copy) and links in Base's replies are drawn the same way everywhere and read clearly in light mode.

  • 25 Oct — In the chat, nothing goes missing beside a download or a section card. Words beside a download, or beside an estimate section with a slash in its name ("Doors / hardware"), were dropped; they show again, in old conversations too. A download shows Downloading… until the file is saved, the card that offers to take you to a page names the page, and the cards' outlines show in light mode.

  • 25 Oct — Procurement names each kind of order: subcontractor orders, supplier orders and supply & install orders, where the filter used to offer "Purchase orders" twice.

  • 25 Oct — Fixes. AI usage counted at most 1,000 requests in a period; it now counts them all. Contacts shows the true number of businesses past 1,000. Client names and addresses no longer show "&" for "&". A claim date with a two-digit year is refused with a note to check the year, where it used to save as year 0026. The date picker no longer greys out today.

  • 24 Oct — Tasks, the Calendar and a job's Tasks page are easier to work through. Tasks opens with what needs you now (late, then due today), this week, what Base is doing and what is up for grabs; press one to jump to it, and Next opens the most urgent task. The views and filters sit in one toolbar, and the list uses the width of the page. The Calendar has one toolbar for the month, the view, the job and the person; its layers are a legend you switch off and on; and subscribing or connecting your own calendar folds away under Your own calendar. A job's Tasks page has tabs, Board, Plans, This week and Meetings, instead of one long page, and each card's status is a dropdown like everywhere else. On Projects each stage is one panel with its jobs as rows. Figures that used to sit in separate boxes (Money, Cashflow, a job's Costs and Variations) are one band. Buttons no longer hide under Ask Base AI: while it sits at the top of the page, the page starts below it. Site, Tickets & licences and My submissions use the width of the page with the usual heading. When an import from Xero stops, the page now says what to do (usually Reconnect Xero) instead of showing Xero's error text. In Settings, a page's buttons sit under its title, and notes such as "connected as…" are plain with a coloured edge instead of a coloured block. The skill file editor follows light mode.

  • 24 Oct — Light mode is sharper. The light theme's colours have been reworked to read as clearly as dark mode. Green text (links, section titles, figures, Approve) is a deeper green that is easy to read on a light page. The headline figure on a page (the estimate's sell price, Waiting for you), the page you are on in the sidebar, the main button in a toolbar or dialog and the Ask Base AI button are now solid green with white text, where they were pale mint. A figure that needs your attention is a deep amber tile instead of khaki. Blue, amber and red text is darker so it reads on a light page, and the money figures show cents consistently ("$639,821.60", never "$639,821.6" or "-$0"). The pale green haze across the top of the page and the sidebar is gone, and the greys are slightly warm, to match dark mode. Dark mode is unchanged.

  • 24 Oct — The AI keeps a job's sizes to hand. Inside a job, the AI now knows the tenancy size from the Site brief, the levels and rooms labelled on the plans, the areas stated in schedules and legends (with the sheet each came from) and the measurements your team drew in the plan viewer, so a question about a size, an area or a room count is answered without reading the plans again. Figures from a superseded drawing are kept apart and marked as out of date.

  • 24 Oct — Archived jobs go quiet, and overdue RFIs are one card per job. Base no longer tells you about an archived or completed job's overdue RFIs, or about uncommitted estimate sections on a job that is archived or already won, and anything it filed about an archived job before has left the standup, the ledger and the job's notes (money on an archived job still shows). Overdue RFIs now come as one card per job, saying how many and which. The uncommitted-sections card names its job. The ledger shows a line said more than once in a day once, with how many times.

  • 24 Oct — Teach the AI how you work in a few minutes. AI Memory now opens with quick questions the first time an admin visits: the things the AI most needs to know about how you work, such as whether the rates you give it are cost or sell, how you set your margin, how you handle the levy in your state, what goes in preliminaries, what you always exclude and how your quotes should look. Most take one click, and each shows exactly what the AI will remember before it is kept. Questions the AI can already answer are shown as already known. Reopen them any time with Quick questions at the top of the page.

  • 24 Oct — Invoiced lines are ticked off on Job Costs. Open a trade: under Outstanding — not yet ordered, an estimate line a bill on that trade pays for now shows a tick with the supplier, invoice number and amount, and is left out of Issue a purchase order and Invite tenders. Base matches a bill to the lines its description names. Press Not this line if it's wrong, or Tick off to pick the bill for a line it missed. A tick changes no figure. Each cost entry shows the lines it pays for. See Job costs and supplier bills.

  • 24 Oct — Every cost carries its paper. An order is issued or accepted only with the quote it was raised from attached, and a bill is approved and paid only with its invoice attached. Attach them from the order (Quote → Attach quote), the Issue screen (Their quote), a bill's row on Job Costs (Invoice missing · Attach) or the Invoice file on the add-cost form. A bill without its invoice still counts toward the job; it waits to be paid. Bills from Xero have their invoice in Xero and are not held up.

  • 24 Oct — Upload the job's invoices, and open the paper behind every cost. At the top of Job Costs, drop the job's bills — PDFs, scans or photos, as many as you like — and Base reads each one and records it on its trade for approval: the order it pays, else the trade it reads from the job's cost sections, else the one trade line carrying its cost code, else where that supplier's earlier bills on the job went. The list under the drop says what landed where; nothing is approved until you tick it on Cost Entries. Each bill on Cost Entries, and each order and bill in a trade's drawer, now carries links to its Invoice, Receipt, PO, Docket or the bill in Xero.

  • 24 Oct — Accountant mode reaches every figure on Job Costs. Turn it on (or Alt+click) and the True value panel's tiles open their working: Earned to date line by line, Cost to date split into outside bills, your own labour, stock and plant, what is incurred but not billed, and the overhead share, Margin to date and At completion with their percentages, each row of What's in it, and the Overhead share with where its % came from. So do the strips beside the table — the anticipated variations and the work done on unapproved ones, engaged money with no order, the extras named on the lines, orders and costs on no trade — a line's % complete chip (its earned value and CPI), the accrued figure in a line's drawer, the SOV tab's lines and totals, and the Approved and With the client tiles on Variations. On the Money page each job's Contract, After overheads, Claimed and Unbilled open too. A past day's figures (As at) stay plain.

  • 24 Oct — Overhead bills from Xero can file themselves. A new switch under Settings → Finance → Automation, File a Xero bill with no job on it as an overhead when its account says so, sends a bill Xero holds with no job — rent, insurance, the phone — straight to Company overheads under its category as it is pulled, instead of waiting on the holding job for you to file it from the Money page. Only the account it is coded to decides: one of your overhead cost codes' accounts, an account you classed as overhead under Pull from Xero, or one of Xero's standard overhead accounts. An account you classed as direct cost or revenue is never filed, and the wording alone never is. It is off until you turn it on; the bill still waits for a person's tick, and nothing is retagged in Xero.

  • 24 Oct — AI Memory, rebuilt: decide, fix, test and ask. The AI Memory page now opens with what is waiting for you, what the AI knows and how much of it is in use, and a short panel on how memory works. Decide lists what the AI noticed with where it came from: Keep it, Fix the wording and keep it in one step, or Bin it with a reason (J/K move, Y keeps, E fixes, N bins); it also shows corrections against the old wording, memories the AI is asking about (Still true or Retire it) and pairs that disagree. What it knows lists every memory, searchable: open one to change its words, where it applies or how much it matters, retire it with a reason, or see its history (an edit keeps the old version). Add a memory writes one directly. Try it shows exactly what a message pulls in, how strongly each memory matched and which nearly made it, and the compliance rules it would look up; Ask it what it knows is a conversation with the AI that shows, beside each reply, what it recalled and looked up. Compliance lists the researched rules for your area. A memory about you is now shown only to you, and only you decide a suggestion about you. New in Settings → AI Memory: Learn from finished conversations, where Base reads a conversation once it has gone quiet and suggests what to remember; everything it suggests waits for a person, and each person can switch it off for their own conversations.

  • 24 Oct — Teams, rebuilt. The Teams page now opens with a summary of your staff, your teams and the open jobs nobody runs, with the next step to take, and a panel that says how staff, crew, subcontractors and clients differ. Three tabs hold the rest, each with a short how-to: People in your business (everyone with a login, grouped by access, with the teams they are in and the invitations still out), Teams (pick a team to see and change who is in it), and the new Job teams, which lists every open job with its head PM and people; Name head PM opens that job's Team page with the picker open.

  • 24 Oct — A job's Team page: roles of your own, new clients and subcontractors in one step, and who's who. On Your team, every role list ends in + Create role: press one of fifteen common roles or type your own, and it is offered on every job after. Link the client business and Add a subcontractor now have New client and New subcontractor, which add the business and the person you deal with to Contacts and pick it for the job in one go; the search results no longer hide behind the window or the table below. A panel above the tabs sets your team, crew, subcontractors and the client side by side: who they are, how they get into Base, how they sign in on site, and what they cost the job. The tables' columns line up, every dropdown on the page and on Teams looks the same and says what each choice means, + Create role stays in sight at the bottom of the role list, and each tab's How this works is a row of numbered steps.

  • 24 Oct — A job's Team page: everyone on the job in one place. The Team page inside a job now shows who runs it, the client, the subcontractors and your crew, with the next step the job still needs, in four tabs. Name the head PM picks anyone on your staff: you no longer need to link a team first, and with no team yet Base makes one. From the same page you can add your other people with their role on the job, invite someone new, link the client business and its people and invite them to their portal, add subcontractors from Contacts or new, and add crew from your roster or new with their PIN texted. Each tab starts with a short how-to.

  • 23 Oct — Not required, on Job Costs. Open a trade and press Not required beside a line in Outstanding — not yet ordered to take scope out of a won job. Keep the saving asks why, takes the cost off the budget and leaves the margin with it; Credit the client raises a credit variation for them to approve. A line a variation has taken out is no longer listed as scope to order, and the variation dialog now says "keep the saving" rather than "we wear it" when the change takes cost out.

  • 23 Oct — Job Costs: costs coming by name, and Accountant mode. Open a trade and add a cost that's coming that the budget doesn't cover ("Switchboard upgrade, $5,555"). If you wear it, it shows under the trade and goes on top of its expected final until it's in an order or a bill. If the client pays, it's raised as a variation instead. The Forecast column is now Expected final (here and on the Money page, WIP and reports), and Variance is Over/under. The plain page shows Budget, Committed, Actual, Expected final and Over/under. The Audit button is now Accountant mode (Alt+A) on every finance page. On Job Costs it adds Remaining, Uncommitted and Var %, a list of extras for accounts to review, and accounts' tools: the still-to-come figure on a line with a reason, % complete, moving budget, reconcile, close month and the CVR.

  • 23 Oct — Sign out of a label. A Sign out button sits beside your name once you've entered a PIN or reported as a visitor; it clears the pass, the visitor name and the PIN the workshop panels keep, so the next person starts clean. A PIN that isn't on the job's crew now sees why it can't log installs and the install buttons are hidden instead of failing.

  • 23 Oct — Anyone can report on a unit from its label. Someone with no crew PIN — the builder's site manager, the client's representative, a subcontractor not on your crew — scans the unit's label, gives their name once under No crew PIN? and can send notes with photos: missing, damaged, doesn't fit, drawing wrong, a question. It reaches the workshop or the PM like any site note, marked Visitor with their name and contact on the unit's Site section. Visitors can only leave notes; arriving, installs and sign-off still need a crew PIN.

  • 23 Oct — Label pages read on a phone. The page a scanned label opens now keeps the unit's tag, name and status at the top while you scroll, uses the app's own colours (it was unreadable in dark mode), fills the phone's width with thumb-sized buttons and fields that don't make the phone zoom, and folds the recent scans away.

  • 23 Oct — A bill lands on its trade however it arrives. A bill or receipt with no order and no trade picked now goes on the one trade line that carries its cost code, whether it came through the assistant, the Documents tab or a form. Before, a receipt recorded from its form landed with No trade, and Approve all refused it. Approving puts an older one with no trade on its line the same way. The receipt form now keeps the receipt's number, and can name the order it pays. A bill read off a file in a chat counts once it is approved, as it does from the form. Approving it in the chat works again; it had been failing with a permission error. A document the assistant records is marked as dealt with, rather than staying New. For a bill or a receipt, the Documents tab's Just store it now reads Store it, not as a cost.

  • 23 Oct — Say it, or take a photo, on every document form. Each form that records a document now has Choose a file, and on a phone or tablet Take a photo, which opens the camera and reads the photo the same as a file. On the forms people describe aloud (a receipt, a bill, a credit, a levy, a deposit, a delivery or daywork docket, hours, a subcontractor's claim, a payment schedule or payment, a variation, an inspection, an incident, defects and minutes) Say it records you, and Base fills in what you said, marked heard, for you to check before saving. The form shows an example of what to say and what it heard. On an incident or a defects list, the photo can be of the thing itself — the damage, the crack — and Base describes what it shows. The Documents tab has Take a photo beside Upload on a phone. Job Costs has one Add cost button (bill, receipt, credit note, levy or fee, or another cost with no paperwork) where it had five. Securities has one Add security, which now takes a cash security and whether it stands in place of retention. The handover checklist's documents and certificates are under one Add document. On an order's receive form, the docket button reads Read the docket.

  • 23 Oct — Every kind of document has a form, and Base fills it from the file. Receipts, credit notes, levy and permit fees, deposit invoices, delivery and daywork dockets, timesheets, payment schedules, remittances, bank guarantees, approvals, certificates, inspections, compliance documents, incidents, defects lists, meeting minutes and handover documents are now each recognised for what they are, with their own type in the library. Upload one and the next step is Record the …: its form opens beside the file with what Base read filled in, marked read, for you to check and save. A photo of a receipt or a docket is recognised as that once Base has read it, not filed as a site photo. A document nobody records becomes one item for the job's people, which opens its form. Each form is also a button where that document lives, to type it in with no file: Add cost on Job Costs (a bill, a receipt, a credit note or a levy); Enter claim on the claims; Receive delivery and the deposit invoice on an order; Enter hours and Add daywork docket on Timesheets; Check a statement on Money; Record payment schedule and Record payment on a claim; Add security; Record approval on a variation's row, for the client's signed or emailed approval of one already raised (it never raises a second), and Read it from the file in Raise Variation for an instruction; the signed quote or PO in Mark won; certificates and inspections on Hold points (a certificate can pass the hold point); compliance documents on a subcontractor; Report incident on Safety; a defects list on Defects; meeting minutes, whose actions become tasks; handover documents; and a new Approvals page, whose conditions become tasks. On the phone, Capture records a receipt, a bill or a docket from a photo. Files arriving by email, text message, Xero or the business's own documents email address are saved and read the same way.

  • 23 Oct — A forgotten sign-out is a regular day, not midnight. When someone forgets to sign out, Base now records a regular day from when they signed in (7.4 paid hours, set under Sign-out cut-off on Timesheets) instead of keeping them on the clock until 23:59. The sign-out cut-off is now on for every business at 4:30 pm until you change or turn it off. The text before it says the finish that will be recorded if they don't reply, and replying LEFT 5:10 afterwards changes the finish, until the shift is approved. Someone who signs in in the evening is no longer signed out straight away at the cut-off.

  • 23 Oct — New rates are checked to be found before they're saved. When the assistant adds a rate, it first tests it against the estimate line it came from, and a few other ways estimators write the same item, through the same matching your estimates use. If your book already holds the item under other words, you're offered that rate instead of a duplicate. A name the next estimate wouldn't find is saved under a clearer name that is found ("Towel rail 600mm chrome — supply & install", not "Bathroom accessory, chrome 600"), and you're told the name it used.

  • 23 Oct — Estimates from plans use about half the AI credits. Each trade is still taken off and priced on the premium model; the conversation around it (the questions, the fees and preliminaries, and the check-over once the trades are in) now runs on the standard one. When the estimate's final check still lists something open (who supplies the equipment, say), the assistant asks whether the estimate is done anyway; saying yes marks it finished, which starts everything that follows a finished estimate (its first saved revision, and any task or automation waiting on it, like building the programme) with the open items noted. Only someone who can edit estimates can mark one finished.

  • 23 Oct — Quotes, branding and specs are set once. Document Studio → Quote wording and branding now chooses how every quote reads: itemised or with group totals, and grouped by trade section or by room or area (the "elemental" quote). Asking the assistant for an itemised or by-room quote does the same and is remembered for the next job; it no longer moves your estimate lines into room sections to do it, and the estimate never changes. Your accent colour and logo now go on every document Base produces (quote, progress claim, site instruction, scope, BOQ, SWMS and the rest) instead of only the template you branded; Base's stock colours give way, a colour you chose for one template stays. The standard quote prints each line's sizes, materials and finishes under it; a line's notes stay internal and never print.

  • 23 Oct — Ask the assistant whether your rate book is fit to price from. "Is my rate book any good?" gets a score and the problems that make estimates wrong, worst first: a door priced per m², a price no real rate reaches, a fee scale stored as a rate, a rate with labour inside that isn't marked (so labour went on twice), duplicates, impossible hours. "Let's clean it up" takes a snapshot, then goes through them one kind at a time, changing nothing without your yes, and suggests clearer names ("LED downlight 10W — supply & install", not "Supply & install 4x downlights to Level 2"). Imports now also hold a price no real rate reaches (over $5,000 per m², $25,000 for one tree, under $1 per m²) until you approve that row itself.

  • 23 Oct — Estimates price from your rate book more carefully. A rate that includes its labour is no longer priced again with labour hours on top: using it from a line's rate panel (labour included) splits it into material and hours at the line's $/hr. The assistant links a line only to a rate for the same thing and the same kind of work, and prices your own crew's hours at your Labour rates. A line it writes with hours priced twice is refused, and one that looks wrong (hours beyond what a small fitting takes, the same item in two sections) is flagged for you to answer. When you give it an hourly rate you haven't saved, it asks whether to save it as your rate for that work, so the next estimate uses it too. Asking it to re-do a section in other words ("section 9, Electrical Services" when the estimate has "9 Electrical") now replaces that section instead of adding a second one beside it.

  • 23 Oct — Asking the assistant to make a new project and estimate, from a chat that doesn't belong to a job, now makes the new project, even with another job's page open. It used to put the estimate into the job on screen. A chat that belongs to a job still won't write another job's estimate.

  • 23 Oct — Rate Book imports: approve-all leaves the rows with a warning, and an all-in rate keeps its split. On Rate Book → Imports, approving a whole trade (or asking the assistant to approve everything) now takes only the rows with no warning; the rest stay for you to check one by one, and a line under the table says how many and why. A fee scale, a counted thing priced per m² and a row with no price go in only when you approve that row itself. When a sheet splits a rate into labour and material, the rate is kept as all-in with its split (shown under the row), so pricing no longer adds labour hours on top of it; a Sub-Contractor column that just repeats the Total no longer makes a material price look all-in. Each new rate passes the same check as one typed on Rates, and a row it refuses stays on Imports with the reason. A row that matches a rate already in your book is added to that rate instead of making a copy. A big import carries on in the background (Committing…) and picks up again by itself if it is interrupted, without adding anything twice.

  • 23 Oct — On the Scope page's Gaps tab, the list now opens on the gaps still to decide. Undecided and All sit above the list with their counts, and a gap you decide stays on screen, green, until you switch or leave the tab.

  • 23 Oct — The assistant no longer drops what it was asked to do mid-step. In a step where it did several things at once, the last of them sometimes went through with nothing filled in, so it read an estimate as empty, failed to write a trade's scope, or stopped with "kept failing the same way", and said the mistake was its own. Long chats also keep the record ids they still need when older work is condensed.

  • 23 Oct — Discuss in chat on a task now opens the chat on the task's job, so the assistant works on that job from any page, Tasks included. A task in a job's Scope area about the scope of works opens that job's scope review with the task named, rather than starting a second chat.

  • 23 Oct — A trade with nothing in it can no longer be confirmed. On the Scope page, a trade with a summary but no priced or implied item now reads Nothing to confirm instead of offering Confirm, and opening it says why. One already marked confirmed reads Nothing in scope and blocks approval. Complete scope now drafts any trade with no items, and Confirm ready leaves out a trade that misses one of its approved estimate lines. Carrying a tendered price onto the estimate now marks the confirmed trade it lands under as out of date straight away, instead of waiting for Check for changes.

  • 23 Oct — Handing one of the task review's own tasks to Base no longer stops the review keeping it up to date: it can still retitle or close a task you gave to Base. Renaming a task, changing its details, ticking a step, a comment, a new date or owner, or changing its status yourself still make it yours, and a task's history now shows renames, detail changes and ticked steps. The review's tasks in a job's Scope area close themselves when the job's scope of works is approved, with a line on each saying so.

  • 23 Oct — The estimate shows what each line costs per unit. A new unit cost column, beside the total, is what one unit comes to with its labour (the line's total ÷ its quantity), so material and labour now visibly add up: mat amt + labour = total, and qty × unit cost = total. The material rate is now headed mat/unit, and the hourly rate $/hr; hover any heading for its sum, and hover a line's total for what it sells for at the section's margin (the figure a line-by-line quote prints). Add line asks for Material $ per unit and Labour hours, whole line instead of "Rate ($)", and shows the unit cost and line total as you type. The section cards the assistant proposes in chat use the same words and show the unit cost too.

  • 23 Oct — Comms is quieter, and built for working through. One bar at the top now switches between Needs a reply, Drafts to approve, Waiting on them and All, with search and one Filter (job, type, trade, channel) beside it; each filter you set is a chip you press to remove. Group lists people by date or by job: by job, someone who has written about three jobs appears under all three, each row showing only that job's messages and its own green dot, and Only this job on a heading narrows to it. Open someone on several jobs and By job sorts their messages into a section per job; opened from a job's row, that job comes first and the reply answers its latest email. Every message now shows its job at the right of its header (a sparkle when Base filed it); press it to move the message to another job, with search, their own jobs first and Undo after, or Move all to move a whole section. Drafts the assistant writes about something that is not a job (a subscription question, a new enquiry) now show in Comms too, not only on their task. With the chat open on a smaller screen, the list and the conversation now take turns instead of squeezing the conversation to a strip. A green dot on a row means they need you, and N drafts ready says a draft is waiting. Messages are plain blocks instead of boxed rows, and a draft shows as the email will read, bold and lists included, instead of with stray asterisks. Mail from no-reply addresses (App Store, cloud billing, sign-in alerts) that nobody has filed joins the newsletters at the foot of the list. j / k move through the list, r goes to the reply box and a to the waiting draft. Also fixed: choosing a channel no longer hid the email a reply answers, which left Send with nothing to reply to.

  • 22 Oct — A site label on every joinery unit. At Pack, print a 100 × 150 site label for every unit in a crate (or Site labels on the unit's page) — one per copy, with the room, the crate and the installation notes — and stick it inside the carcass. Scanned on site it shows where the unit goes, which copy it is and how many are in, the install brief and the workshop's notes for site. The installer enters their crew PIN once for the day, then presses Arrived on site, logs each copy's install with a photo, tells the workshop or the PM what is missing, damaged, doesn't fit or is drawn wrong (with photos), and presses Ready for sign-off with photos of it finished. A problem reaches the foreman and the workshop, a question the PM, and the PM hears when sign-off is asked for; replies show on the label. The unit's page has a new Site section with all of it, and Note for site on a crate writes one line onto every unit in it. A unit of three turns Installed when its third copy is logged.

  • 22 Oct — A job's true value on Job Costs. The four cards at the top of Job Costs are now one True value panel: the revised contract, the value of the work done, what the job has cost the business, the margin to date and the margin it will finish on, after its share of overheads (or before, one click away). What's in it opens the cost into outside bills, your own labour, stock and plant, and what is incurred but not billed yet, each down to its rows. As at shows the job on any past day. One quiet Needs a look count replaces the Margin at Risk and stale-forecast banners and lists only what changes the money, each with one button that fixes it. Set when it speaks up in Settings → Finance → Job costs, or per job. The same list is in the Monday money email, under Needs a look on the jobs. The Committed, Accrued, Actual, Paid and Due strip is one click away under the panel.

  • 22 Oct — Move labour, stock or plant between trades. Your own costs now have a move button in Cost Entries in place of Edit and Delete: put one on another trade, split it, or take it off the job to overheads with the reason. The amount never changes, and the move is kept with your name. Labour and plant posted before a job had a budget now place themselves on the trade once it does. A new Internal chip shows only your own costs. Posted labour is never offered to a payment run or sent to Xero as a bill.

  • 22 Oct — Take stock to any job. Take to a job on the Stock page takes an item off the shelf onto any job and trade, not only a BOM row: screws for a site, consumables for the install crew. The job is charged the average cost ex GST, never as a bill.

  • 22 Oct — Plant and vehicles on jobs. A new Settings → Plant & vehicles register lists your utes, vans, trucks, site plant and workshop machines, who owns each and its rate. Turn tracking on per kind in Settings → Finance. A use is logged where it happens — the crew tap the vehicles and plant they used at the QR sign-out, the workshop taps its machines and hours at clock-off, the site diary shows the day's uses and adds one, and Job Costs has Log a use — and it is charged on the hourly run: the business's own at its internal rate, an employee's own vehicle as an allowance, a hired item at its hire rate until the hire company's bill arrives and is matched to it, and a contractor's recorded only.

  • 22 Oct — Full-time, part-time or casual on the Crew Roster. Each person now says whether they are full-time, part-time, casual, an apprentice or a contractor, and whether they have a company car (and which one). Full and part-timers and apprentices are paid every week whether or not there is work, so the roster shows what you are committed to in wages each week. The cashflow forecast now counts at least that much labour each month; only the part your jobs' labour and planned wage overheads don't already cover is added, so nobody is counted twice. Casuals and contractors cost only the hours they work. The roster also compares the hours you pay for with the hours logged over the last four weeks. You can search it, and filter it by employment or company car. A quiet line sits under anyone who needs a look: employment not set, no sign-in for four weeks, a casual on full-time hours, a part-timer past their hours, paid hours with nothing logged, or expired tickets. Deactivate and Reactivate are now buttons on each row and on the person's own page, and they say what they do before they do it. People added before today show Employment? until you set it.

  • 22 Oct — A steel stair's materials, ready for the stock rack. Saving a stair in the stair designer (or asking the assistant to push its materials) writes its sections in metres with your 10% waste added and the bars to order in the notes, its plate in kilograms, bought-in items and fixings. Each row is priced from your rate book where it can be, and carries its cost section, so orders and stock used land on Steel Supply, External Processing or Hardware & Fixings in Job Costs instead of all on one line. Folding, rolling, galvanising and coating stay on the estimate. Stock keeps steel by the metre and plate by the kilogram, and a stock list that counts bars with their length in the name ("75x50x3 RHS 8m") loads as metres.

  • 22 Oct — Variations on Job Costs. A job's Job Costs page has a Variations tab listing every variation on the job, whatever its status, with what the client pays, what it costs you, the margin, which trade line holds its cost and what is at risk. A band at the top totals Approved, With the client, Not sent and Absorbed; press one to show only that group. Each row opens the variation in the Variation Register, where you still raise and edit them.

  • 22 Oct — Tasks has a Plans view, and the assistant is called Base. A plan is a goal with a few steps that depend on each other ("Switchboard in before fit-off": confirm the spec, raise the order, book the electrician), each step a task with one owner. On Tasks → Plans and on the job's Tasks → Plans, each plan is a card with its steps in order: done, ready, Base working, or waiting on an earlier step; chips On me · On Base · On my team · Waiting; press a step for why it is there, what it needs first and unblocks, who does it, and Mark done / Approve / Give to Base. Marking a step done lights the next one on its owner's list by itself. The line under the Tasks title now says what is on you ("2 ready for you · 3 waiting on an earlier step"). Every task row, card and owner chip on both pages is drawn the same way, and the assistant's work is labelled Base everywhere (it was "PM Agent" on one page and "AI" on the other); where Base can't take a task — site work, an approval, a signature, a lead's outreach — the menu says why.

  • 22 Oct — Timesheets: your own sign-out cut-off. On the Timesheets masthead an admin can set the time after which anyone still signed in is signed out (4:30 pm, say) instead of the 23:59 close. Before it, each person still signed in gets one text asking whether they are staying or have already left: STAYING keeps their shift open, LEFT signs them out (at the time they give, or when the text went), and at the cut-off the rest are signed out and flagged for you to check. Also fixed: a status menu in a table (Variations, among others) no longer gets cut off at the bottom of a short table.

  • 23 Oct — Fixed: Approve Base for your organisation (under Outlook on Settings → Integrations) opened a Microsoft page that said "AADSTS9002328: Invalid request". It now opens the approval screen.

  • 22 Oct — Outlook in a Microsoft 365 business that asks for admin approval. If Microsoft answers "Need admin approval" when you connect Outlook, Settings → Integrations now says what to do, and a new Approve Base for your organisation link under the Outlook row lets your Microsoft 365 admin approve Base once for everyone. Connecting no longer forces Microsoft's consent screen every time. Also fixed: pressing Disconnect on an integration (and other confirmation boxes) showed a dark screen with no box on it.

  • 22 Oct — Base now reports to you, instead of filling an inbox. A fresh chat opens on Base's standup: a line on what it has for you and up to three cards to decide, each with its buttons; a card you act on folds to a green line with Undo. The chat's Inbox tab is gone; the ledger button in the chat's header (the scroll icon) slides over the conversation with everything Base did, one line each, with Undo while it can be taken back and Ask about this to open the conversation behind it. Home and a job's dashboard carry a strip at the top saying what Base is doing now, what it has done today and what is waiting on a person, with a red box for the one thing that cannot wait. On a job, Base's notes hang off the chat in a drawer. An amber dot on a nav item means a decision waits in that area. The chat's quick actions moved into the + menu beside the box.

  • 21 Oct — Files that stopped part-way through being read now finish. If Base was interrupted while reading a PDF or photo you uploaded (during an update, say), it picks up from the page it reached within a few minutes, and never pays to read a page twice. On Drawings, a set filed before its pages were read is read again once they are, so sheets it could not number the first time are added; and a sheet whose number names no register discipline (a project prefix like CBH-101, a civil or landscape sheet) is filed with the discipline blank for you to set, instead of being left off.

  • 21 Oct — The job’s Client page is now in clear panels: the client and their figures in one box at the top, then each section in its own panel. The quote’s version trail lists newest first, marks as current the version the client actually has, shows a signed copy as that version signed, and no longer lists deleted quotes or your trades’ quotes. Portal activity shows repeated visits as one line (“8 times today”).

  • 21 Oct — Automations can react to email. New moments to build on: an email comes in, someone replies, an email goes out (through Base or straight from your own Gmail or Outlook), an email is filed on a job, lead, contact or company, and an email’s attachments are saved to a job. Each says who it is from (their address and domain, and whether their business is a client, subcontractor or supplier), whether it has attachments and which job it is on. A new Email watch pack has four ready-made ones. Mail in your own mailbox now reaches only the automations you set up until you file it on a job the team can see; RFI answers and replies to purchase orders are no longer triaged twice.

  • 21 Oct — Meetings work with automations. When a meeting is arranged, moved, cancelled or answered, a day and an hour before it, when it finishes, and when someone is double-booked — with a ready-made Meetings pack (a task to re-book when a client declines, a note before a site meeting, a write-up nudge, a double-booking warning). Ask Base can arrange a meeting, list what’s coming up and find a time that suits everyone; it invites people outside your business only when you say so.

  • 21 Oct — Drawings: only drawings are filed now. Your own quotes, contracts, variations and claims, their signed copies, RFQs and tender packs, subcontractors’ tenders and quotes, orders, bills and site photos no longer land on the drawing register or under Sets received, even when they include plans.

  • 21 Oct — Your trade now sets where your plans go. Sign-up offers Steel fabrication / metalwork and Residential building as primary trades, and the trade you pick becomes your default estimate kind (Settings → Business Profile → "Which estimate do your plans need?") so the first plan you drop lands in the right estimator. Where no default is set, Base now also reads your business description before deciding, and gives a dropped plan set a little longer to be read before it falls back to the commercial take-off.

  • 21 Oct — AI Memory has moved out of Settings, and Settings → AI Memory is now the rules for it. The page where you keep or bin what Base noticed is AI Memory in the main nav. Under Settings → AI Memory an admin now decides whether Base may note things on its own, whether what it noticed is used straight away or waits for a person, who may review it, and which kinds of thing it keeps. Nothing changes until you change it: everything still waits for a person, and anyone on the team may review.

  • 21 Oct — AI usage is shown in your words. The breakdown on Settings → AI Usage now groups what Base was doing (Chat, Plan take-off, Reading documents, Rate book and pricing, Sorting messages, Search index, Voice, Background work) and the tier of model it used (Premium reasoning, Standard, Fast, Vision, Voice, Search index) instead of listing internal job names and model versions.

  • 21 Oct — AI usage has its own page. It was a tab inside Billing; it is now Settings → AI Usage, with the month's meter, top-ups and the breakdown.

  • 21 Oct — Settings pages now all look and work the same way. Every page under Settings has the same header, the same left-hand section names with their controls beside them, the same switches, fields and Save buttons, and uses the full width of your screen. Nothing moved and no setting changed; it is only easier to find and read.

  • 21 Oct — Your calendar on Your profile. Anyone on your team, not just admins, can connect their own Google Calendar from Your profile → Your calendar, see when it last synced, and make their private Subscribe in my calendar link there. Connecting Outlook still asks for your mail only. A client or subcontractor sees a meeting in their portal only once its invite has gone.

  • 21 Oct — Base tells you when a long reply is ready. If the assistant takes more than half a minute and you have stepped away — another tab, another app, the phone app closed — your phone or browser gets a Base finished alert with the start of the reply, and tapping it opens the chat. Nothing is sent while you are watching it. Turn on urgent alerts under Notifications to get it.

  • 21 Oct — Calendar and meetings. A Calendar in the main nav shows every meeting in the business, with site bookings, inspections, key programme dates and your team's connected calendars as layers, and flags a clash. Arrange a meeting from the Calendar, a contact, a business's Subcontractor tab, a job's Subcontractors page, a package on Tenders (Book a briefing) or the job's Client page (Schedule now): pick the time and the people, and Send invites emails each outside person a calendar invite they can accept. You get a task for it. A job's Tasks page lists its meetings and what its stage should have booked; admins set that in Settings → Meetings. Subscribe in my calendar puts your meetings in Apple Calendar, Google Calendar or Outlook.

  • 21 Oct — Meetings in your clients' and subcontractors' portals. A meeting you invite a client or a subcontractor to now shows in their Base portal — on the job's Overview for a client, on your page for a subcontractor, and on their Calendar — with when, where and who arranged it. They press Accept, Maybe or Decline, with a note if they like, and you hear in your notifications. Until they answer, it is on their Decisions and in the daily email's Waiting on you. They never see who else you invited. Their Calendar also has Subscribe in my calendar: a private link their phone, Google or Outlook calendar follows for their meetings, which they can reset or turn off at any time.

  • 21 Oct — Signature requests remind whoever hasn't signed. Your client, a subcontractor and your own team are emailed their link again 7, 14 and 30 days after it was sent, with a final notice a week before the request closes. Requests now stay open 90 days unless you choose otherwise, so the final notice goes on day 83. Reminders go on weekdays in working hours. Untick Remind anyone who hasn't signed when you send, or press Turn off in the E-signature window, to stop them for a request.

  • 21 Oct — Add to my calendar now asks where: Phone calendar (iPhone or Android), Google Calendar or Outlook (with Personal Outlook.com account? for a personal address). It is on every date in the portal calendar, on a confirmed meeting in the client's portal and on the Client page's Meetings. On an iPhone the date opens straight in the Add to Calendar sheet instead of downloading a file. Download all is now Download all (.ics), for a phone or desktop calendar app.

  • 20 Oct — Running a plan check again keeps what you have done with its questions. A question it asked before keeps its RFI and number. An RFI you have addressed, sent to the client, had answered or edited is never withdrawn or reworded, and stays on the plan check's list while it is open or answered. Only an RFI nobody has touched is withdrawn, with a note saying why, when the check stops asking it. Deleting or editing an RFI item on an inspection follows the same rule. New RFIs from the plan check are numbered like any other (RFI-004, not RFI-04).

  • 20 Oct — The plan check's questions can go to the client. Open the plan check above the estimate: each question shows the RFI it already is, or Not raised. Tick them, pick Client, Design team or Not yet, and press Raise as RFIs. Which are for the client? has the AI suggest which are theirs; it raises and sends nothing. Ask the client (also on the RFIs tab) sends them with the usual RFI email. Everyone on the client side of the job sees them in their portal under Questions and on Decisions, any of them can answer, and the answer is recorded with their name. Questions to subcontractors, suppliers or consultants never appear in a client's portal.

  • 20 Oct — Propose a meeting to your client. On a job's Client page, Meetings → Propose a meeting offers them one to three times, at the site or online. They pick one on their portal (the job's Overview and their Decisions), or tell you none suit and what would. You hear in your notifications, and a confirmed meeting goes on their portal calendar.

  • 20 Oct — Add to my calendar. Every date on the Base portal calendar can go into your client's or subcontractor's own calendar app, one at a time or Download all for the next six months.

  • 20 Oct — Maintenance access before the first sign-in. Sites & access now lists every client contact on your jobs, including those who have not signed in yet. Access you give them is theirs the first time they sign in with that email address.

  • 20 Oct — The Terms of Service have new sections on the site safety tools (7A) and electronic signatures (8B). The site tools help you keep records, but they don't make you compliant with safety law, and logging an incident doesn't notify the regulator or emergency services. Base isn't a party to documents signed through it, and you check that an electronic signature suits the document. The terms also now cover beta features, spam, what automations do for you, message delivery, closing inactive free accounts, and keeping the records the law requires. The terms and the Privacy Statement both now say what deleting your account does and what is kept, and the Privacy Statement names Google, Microsoft and Apple as the services you can sign in with. You'll be emailed the list of what changed and asked to accept in Base.

  • 20 Oct — You can delete your account on the web too: Profile → Delete your account shows what will happen, then asks you to type DELETE. It works the same as in the iPhone app.

  • 20 Oct — In the Base Management iPhone app you can delete your account: More → Delete account. The app first tells you exactly what will happen. Everything that is only yours is erased, and you are signed out everywhere. Work you did in your business stays with it, shown as from "Deleted user". If you are the last person in your business, the business closes too: its subscription is cancelled, its clients and subcontractors lose access, and its records are permanently deleted after 30 days. Email support@basemanagement.org within those 30 days if it was a mistake.

  • 20 Oct — You can sign in with Apple on the web too: Continue with Apple sits beside Google and Microsoft on the sign-in page, so an account made with Apple on the iPhone app also works at a computer.

  • 20 Oct — The iPhone app now offers Sign in with Apple. The first time you send something to Ask Base, or add a photo or file, it asks you to agree to Base's AI reading it, and says which AI providers it uses. The web pages the app opens no longer show plans, prices or Billing. The app is now for iPhone only.

  • 20 Oct — Your client's portal now shares the right documents by itself, and says why. The quote, contract or variation you made in Base shows as soon as you send it or send it to sign. The copy they sign takes its place for every contact on the job, even if they signed at an old address. The job's plans show with their earlier revisions once they are in the drawing register. A subcontractor's or supplier's quote, order, bill or claim never shows by itself, even filed as a Quote. On the job's Client → Portal → What they see → Documents, every document is listed as Shared, Not shared or Needs a decision with the reason, and Share / Don't share override it. An admin can switch on Suggest sharing with AI, which suggests the undecided ones for you to confirm.

  • 20 Oct — Your clients can follow their build. Each job's portal Overview now shows Where your job is: Quote, Won, Planning, On site, Handover and Defects period, with the stage it is in marked and the day each past stage happened. It moves on by itself as the job does and carries no money. Your Client page shows the same line on Relationship.

  • 20 Oct — Milestones on the Client page is now Programme: the main phases of the build, each with a start and finish and a line on what the client will notice. Draft with AI groups your programme into five to twelve phases in plain words, with dates taken from your tasks and no subcontractor names or prices; you check it and press Save programme. The client sees it as a timeline on Progress, and the phase under way and the next one on their Overview. When your programme moves later, the Client page tells you, and you redraft or keep the version they have.

  • 20 Oct — The Mark won window now agrees with the Quote signed banner. A quote your client signed, even one sent for signature from Documents, shows as signed by them on that day, with no follow-up task. When the signed quote says what it was for, the contract sum is filled in from it. A quote still out for signature says so.

  • 20 Oct — Your clients now choose between a design's options in their portal. When a design shared in 3D has options, its card on the job's Design page shows each version with its price ex GST and inc GST and the difference against the first, and a client contact on the job presses Choose. The shared 3D page sends a client contact there with Choose in your portal. Until someone at the client has chosen, the design is on their Decisions, under what is waiting on them on your Client page, and in their daily what's-new email. Nothing changes until you apply or decline the choice, as before.

  • 20 Oct — A finish you put to the client (Finishes and upgrades) can have a Needed by date. It shows on the client's portal Calendar on that day, and their choice is due by it on their Decisions list, your Client page and their daily email, and overdue once the day passes with nothing chosen.

  • 20 Oct — Maintenance → Sites & access now lists clients who sign in to their portal with an emailed code, so you can give them maintenance access. Before, only client logins inside your business could be picked, so a client who signs in to their portal could never be given it.

  • 20 Oct — Clients now have Calendar and Documents in their portal, beside Decisions. Calendar lists the dates on all their jobs week by week: meetings you confirmed with them, the milestones you share, when each selection is needed by, the start and planned finish, and practical completion and the end of the defects period once you share the handover. Documents lists everything you shared with them across every job, by builder and job, with anything to sign first, filters by kind and a search by name. Subcontractors' pages are unchanged.

  • 20 Oct — Your clients' daily what's-new email now ends with what is waiting on them — the same list as their portal's Decisions page, and only what they can sign off — and its button opens the job's Decisions when something is waiting. It still goes only when something is new.

  • 20 Oct — In the client portal on a phone, every button to approve, decline, accept, sign, choose, send or report is full width and easy to tap, and How to pay has a Ring to confirm the details button.

  • 20 Oct — Everything a label does while you're signed in to Base now needs Edit on Workshop or Joinery, as recording a scan does: starting or finishing a stage, ticking a check, adding a photo, opening a stage's files, marking a crate delivered and logging an install. Without it, the label asks for a crew PIN.

  • 20 Oct — At the workshop QR's sign-out, a unit with making stages is ticked as the stage it's at, so your hours land on that stage. A stage you scanned during the shift is ticked for you with its share, and still shows under From your scans today after the unit has moved on. Each tick can take a share of the job's time; leave it blank to split evenly.

  • 20 Oct — A unit released to the workshop before making stages arrived can start Machining without being released again. Its stages say its files are on the unit's Manufacturing page; releasing it again files them on the stages.

  • 20 Oct — On the Stock page, Set cost is offered only to people with Job Costs, and nobody without Job Costs sees an item's cost after one is set.

  • 20 Oct — Your clients now sign in to see their job. Links in emails you already sent still work: they ask for a code we email the client, then open the job. Every client contact on a job with an email address can sign in; there is no separate share step. Removing someone from the job, or pressing Remove access, stops them getting in. The project-wide link no longer opens the job, and a contact whose own link you had switched off or let expire cannot sign in until you press Allow again.

  • 20 Oct — A client approving a variation, accepting a quote, approving a claim or signing a document is asked for a fresh emailed code if they signed in more than 30 minutes ago or with a password.

  • 20 Oct — The client portal has a page for each part of a job, and a Decisions page. A job now opens on an Overview, with Decisions, Money, Variations, Design, Documents, Progress, Defects, Handover and Questions each its own page. Only the ones the job has, or you share, appear. Decisions lists everything waiting on your client across all their jobs and builders: quotes to accept, variations and claims to approve, claims to pay, documents to sign, drawings to approve, selections and finishes to choose, and your questions. Each item opens where they act on it. Your preview on the Client page has the same tabs.

  • 20 Oct — A shop drawing's approval link now asks your client to sign in, and they approve the drawing inside their portal. Someone the drawing was sent to who is not a client contact on the job is asked to have you add them.

  • 20 Oct — The job's Client page is redesigned. Relationship shows who the client is, with the person to call and their phone and email, and how many of their people have signed in to their portal. It also shows what is waiting on them (the same list they see in their portal), what is waiting on you, and what they asked. Portal shows who can sign in, with Invite, Copy sign-in link and Remove access, and who signs off variations and claims. It also shows what they see, with a preview. Contacts lists the people first, including everyone at the client company, with Add to job.

  • 20 Oct — A job's client company now brings its primary contact onto the job, if nobody is on it yet. They get no sign-off rights until you tick them on the Portal tab.

  • 20 Oct — Emails to your client contacts carry a button to the sign-in page with their email address filled in, landing on the right part of their job. This covers the quote, variation, claim and handover emails, answers to their questions and the daily what's-new. There is no secret in it, and someone whose access you removed gets no button.

  • 20 Oct — Approving a shop drawing in the client portal now works like approving money: only the person it was sent to, or a client contact who approves variations and the quote, can answer it, and they confirm a code emailed to them unless they signed in with one in the last 30 minutes.

  • 20 Oct — Your questions (RFIs) to a client contact on a job now arrive with their sign-in link and are answered in their portal. An older questions link asks them for a code first. Consultants and subcontractors answer from the link as before.

  • 20 Oct — A client contact on a job signs documents in their portal: the signing link can no longer be used to sign, decline or get a code for them. Other signers are unchanged.

  • 20 Oct — Google or Microsoft counts as a fresh sign-in for approvals only when it confirms the same email address, and only in the browser that signed in.

  • 20 Oct — Without Claims & Invoices, the client portal preview and the Client page no longer show the quote's amount, the claims or the contract figure; each says what it left out.

  • 19 Oct — Your signature no longer lands on top of your client's. Each signer now signs in their own place on the document: the client's block for the client, your block for your business. A copy that has been signed remembers which blocks are done, so countersigning afterwards never writes over them.

  • 19 Oct — The E-signature window shows one card for each signing spot on the document: External signer 1, 2 (emailed a link) and Internal signer 1, 2 (your team, signing in Base). Each card says who has signed it, who holds it and where they are up to, or lets you fill it in. Your own block starts on you, and you can pick a teammate or leave it unsigned. Show where each signer goes draws each spot on the page. Remind and taking someone off are on the card. Place fields by hand is still there for a document Base cannot read.

  • 19 Oct — The signing page now says who the person is signing as, such as "For the Client", and asks for their position and company when their block has those lines. Both start filled in: your own people get their job title and your business name, and others get the role and company on their contact. They can change either.

  • 19 Oct — Sending a quote with Client signs in Base now puts you on the quote's block for your business, when it has one. The quote then reads waiting on the client and waiting on you, and everyone gets the signed copy once both have signed. The client's signature still accepts the quote straight away.

  • 19 Oct — A signature now decides things as soon as everyone outside your business has signed: the quote is accepted, the variation approved, the order accepted. It no longer waits for your countersignature. Signing your own quote for your business, before the client has, no longer accepts it.

  • 19 Oct — On a job's Documents tab, each of your quotes has Request signatures and Sign as your business. Sign as goes once your business has signed. Every PDF has E-signature… in its ⋮ menu. When a document is waiting on your signature, its signing line marks you (you) and offers Sign now, on the job's tab and in the Documents library.

  • 19 Oct — Email the PDF only in Send quote now sends the PDF with no signing link. Before, the link went out anyway. Sign it as the company first now opens the E-signature window, so you sign your block and the client's stays free.

  • 19 Oct — Quotes on a job's Documents tab are now two sections: Our quotes, the ones Base made for you to send, and Quotes received, the ones that came in, such as a sub's tender reply or a supplier's quote off an email. A received quote has an incoming icon and says where it came from, on the job and in the Documents library.

  • 19 Oct — When the client has signed one of your quotes and the job is not marked won yet, every page of the job says Quote signed — it's official., with Mark job won, Open signed quote and Remind me later. When the client has signed and your business still has to, it says so and offers Sign now.

  • 19 Oct — Quote the client in the job's guide now ticks once one of your quotes has been sent, sent for signature or signed, with a note such as "quote signed 19 Oct". Before, it only ticked once the job was won.

  • 19 Oct — A job with no CRM lead can have one in a click: Create the lead for me on the guide's Track it in the CRM step, or Yes, add it where the job asks "This job isn't in your CRM yet — add it?". Base fills the lead from the job and links it.

  • 19 Oct — The ready-made document templates now say who signs each signing spot, so e-signing puts every signature in the right block. The ready-made quote's acceptance also asks the client for their company.

  • 19 Oct — A section carrying a sub's tendered price now shows it in a green panel under the section header. The panel says whose price it is and what it replaces, links back to the tender, and opens their quote. It is no longer one more line in the table that was easy to miss.

  • 19 Oct — Awarding a tender before the job is won can carry the agreed price onto the estimate in the same step. The tick is on by default. The award message no longer says to award again once the job is won, because the purchase order is raised then on its own.

  • 19 Oct — A client quote that lists every line no longer shows a "Tender adjustment" line with the subcontractor's name on it. Their price is spread across that trade's lines.

  • 19 Oct — Before money moves, Base now makes sure it says where it belongs. A purchase order needs its trade and cost code before it is issued, a bill before it is approved, and a variation needs a cost code before it goes to the client or is approved. Base fills them in from the estimate, the trade line or the trade's name wherever it can, and asks you only when it cannot, with the choices. Drafts are never stopped, and neither is a client approving in their portal.

  • 19 Oct — The variation form has a Cost code picker. Leave it on Worked out from the trade unless Base asks you for one.

  • 19 Oct — An approved variation's cost now goes onto the budget line of the trade it belongs to. Its stainless goes on Stainless Steel and its electrical on Electrical, matched by the trade, the cost code or the trade's name. Before, it sat on lines of its own while the sub's varied order and bills landed on the trade, so the forecast counted it twice. A part no trade fits shows VARIATION · NOT FILED on Job Costs: choose its trade under File under…, and its budget and anything ordered or billed against it move there. Undo puts it back. Un-approving a variation takes its cost back off the trades.

  • 19 Oct — A budget line's cost code can now be changed from the line on Job Costs.

  • 19 Oct — Approving a variation on the Variations page, or asking the assistant to, now also adds the sub's share to their purchase order in the same step, within your approval limit. Before, it waited on Money → Decide for a second click. Over your limit, or approved by the client in their portal, it still waits there.

  • 19 Oct — The assistant now checks your approval limit before it approves a variation, the same as the Variations page.

  • 19 Oct — Base no longer asks every business to close each job's month. Turn it on under Settings → Finance → Month close; a business that has closed a month before keeps getting asked until it chooses.

  • 19 Oct — The cost-type grid on Job Costs has a Budget view: what you priced plus approved variations. The labour budget on Timesheets → Jobs now includes approved variations' labour too.

  • 19 Oct — Job Costs, Invoicing, Cashflow (Money, reports and Xero), Receipts, Variations, Drawings & RFIs, Defects, Maintenance, Workshop, Automations, Productivity and Suppliers now show for admins and owners, and for any teammate an admin switches them on for under Team Modules. Some of these had stayed hidden for admins. Estimate templates and AI Adaptations are retired; what you teach the assistant now lives in its memory.

  • 19 Oct — Carry onto the estimate is back on priced packages on the Tenders page. Once a sub had priced through the tender portal, the button did not show on any package.

  • 19 Oct — Drop-down lists, such as Priced and Paid in the Award tender dialog, now open in the app's colours. On some computers they opened white with options that were almost unreadable.

  • 19 Oct — On the Scope page's Gaps tab, a decided gap now stays on the list, turns green and shows what you picked, with Change to pick again. Before, it disappeared, sometimes came back for a few seconds, and was hard to find again.

  • 19 Oct — A gap can now be answered in your own words with Other…, and any decision can carry a line of detail. Both go into the trade's scope, so the people pricing it read them.

  • 19 Oct — A drawing number on a gap, such as "refer CBH-116", now opens that sheet beside the gaps, at its page.

  • 19 Oct — Ask the assistant to invite subs to tender and it now makes a real tender, with the tender portal link, on the Tenders page. It sends the trade's scope of works as written, and waits while the scope is still being written or reviewed. When Let the AI send email without review is off, the invitations show as Ready to send, and you press Send invitations in the chat or on the Tenders page. Before, it could write an ordinary email that put nothing on the Tenders page, so the sub's price never came back to it.

  • 19 Oct — A quote a sub emails back for a tender is now filed with their price on the Tenders page, so it opens from their row.

  • 19 Oct — Send again on a tender invitation now keeps the note that went with the first one, such as site access.

  • 19 Oct — Now and then the assistant wrote one of its own steps, such as its checklist, into a reply as code in angle brackets. That code is now kept out of the reply, and the rest of the answer still shows.

  • 19 Oct — Briefs ahead of time are your choice. On Home, Mail's ⋯ menu has Brief my new mail ahead of time, off until you switch it on; Base writes briefs you did not ask for only for people who choose it.

  • 19 Oct — Switching off Base reads my mail to brief it now also deletes the summaries and drafts Base had stored of your mail.

  • 19 Oct — A next step in a mail brief now opens the assistant with the request typed in for you to read and send, and the assistant shows what it would change before doing anything.

  • 19 Oct — Always for this sender now files only mail to the person who set it (and mail to Base's own address); in a colleague's mailbox the job is suggested for them to confirm. It can no longer be set for a team member or your own email domain.

  • 19 Oct — Mail sent with a colleague on Cc, or sent to two of you, now stays in each person's own Mail and Comms instead of only the first mailbox Base read.

  • 19 Oct — A connected Outlook mailbox's Sent Items are read too, from the moment it is connected, so mail you send from Outlook itself shows in Base as sent. Nothing already in Sent Items is brought in.

  • 19 Oct — On Home, someone waiting on an email now opens Mail instead of Comms.

  • 19 Oct — On Home, the totals on Live jobs and Owed to us, and the Owed line on Out for decision, are now the money position's — the same figures as Money. Owed to us shows its total only with Cashflow and lists disputed claims apart. A live job's margin on a card you build needs Cashflow, as the WIP report does.

  • 19 Oct — Home's header says how many jobs are in delivery and in defects liability. Jobs by stage says how many are in handover & DLP. Health lists end with N more in the projects list. The owner's start includes Jobs by stage.

  • 19 Oct — With Cashflow, Needs you includes the 07:00 brief's exceptions. Incident and hold-point notices can't be snoozed.

  • 19 Oct — Work in hand now counts approved variations and only issued claims, and needs Job Costs, Cashflow or Invoices as well as the CRM.

  • 19 Oct — A go decision's estimator and a lead's owner must be people in your business.

  • 19 Oct — Finishes and upgrades. A finish shows to your client only after you press Ask the client, and each pick tells the head PM; declining reopens it. 3D option prices are now what the client pays, at your markup, and only a client contact on an emailed share can choose. Designs can be switched off on the Client page.

  • 19 Oct — Drawing approvals. The client's drawing link approves the drawing only. A price change on it goes to the client as a variation they approve in their portal. Each send carries a fresh link, and links show nothing once expired.

  • 19 Oct — Stock orders are sent, not just marked. On Stock, Send emails a draft stock order to its supplier, issues it once the email has gone and keeps its PDF on the Stock job; Mark as sent records one you sent yourself. A pack ordered from a job's BOM is drafted there and sent from Stock.

  • 19 Oct — A bill a supplier raises in Xero against a stock order now comes back onto the Stock job and is matched to its order.

  • 19 Oct — Stock charges on Job Costs can't be edited or deleted like bills — use Undo or Return… in the BOM's Stock column. They are left out of the bills register, the GST position, the TPAR and the job's Paid figure. An undone one reads Undone — back on the shelf. Stock costs show only to people with Job Costs access.

  • 19 Oct — One tick list at the workshop QR. A unit's stage button also records your time on it, and Worked on it records time without moving it on. The site QR's sign-off offers only the job's site work. Hours typed on a joinery unit are no longer overwritten, and sending a sign-off twice no longer doubles its hours.

  • 19 Oct — Recording a scan on a part, unit or equipment label while signed in to Base now needs Edit on Workshop or Joinery. The crew PIN works as before.

  • 19 Oct — Walking through a shared design on a phone or tablet, tilt lets you look around by moving the device. Dragging stays the default.

  • 19 Oct — Your own lining allowance. Settings → Framing has a Lining allowance: the percentage added for offcuts when linings and sheathing are ordered by area, net of their openings. It starts at 10%; raise it if small rooms with many openings come up short. Cut lists, the bill of materials, the assistant and option prices all use it.

  • 19 Oct — Ask for it on the plans now attaches the drawings for you: the design's issued drawings and the floor plan's set (filed when you send, ending with the added page for the design). Untick either to leave it off.

  • 19 Oct — Options on a shared design now include labour. Each option's price is its materials from your rate book plus the workshop hours counted from the design at your joinery labour rate, both at your selling price (your markups), so an option that takes more work (2-pac over melamine) shows its real difference. Hover a price to see the hours and the markups; your costs and your labour rate are never shown. Without a joinery labour rate an option shows no price instead of a materials-only one.

  • 19 Oct — Push-to-open (TIP-ON) doors now order hinges without a spring on the hardware schedule and pick list, on their own line. A soft-close hinge fights the push latch, so the door would not pop open. Doors with handles still get soft-close hinges.

  • 19 Oct — Hours by unit, corrected. On Timesheets → Shifts, the split icon on a job's shift shows its hours by unit and stage. Before approval, move shares between units. After it posts, move hours with a correction and a reason, in this week's labour.

  • 19 Oct — A stage ticked done at the workshop sign-out without its photo now moves the unit on anyway, marked photo owed. The foreman is told.

  • 19 Oct — The Crew tab warns when a stage is booked past what its stations run that day.

  • 19 Oct — A stage that can't start because its shop files aren't filed is flagged files missing.

  • 19 Oct — Care view. Turn it on under Making rules, and a unit's label shows the client how to look after it, its warranty and who to call once it's signed off.

  • 19 Oct — The AI photo check now looks only at the photos your Making rules require.

  • 19 Oct — Outsourced jobs are now a filter on Delivery & install → Crates & dispatch (In house · Outsourced), not a separate view.

  • 19 Oct — AI photo check.

    • Turn on Check stage photos with AI under Making rules, and each photo taken on a making stage is compared with the unit's approved drawing, its 3D render, its finish spec and the stage's checklist.
    • Each photo is marked Looks right, Check or Not checked on the unit's page and its label.
    • A photo with something to look at, such as a door missing or the wrong finish, tells the job's foreman in Needs you.
    • The check never stops a stage. It is off until you turn it on.
  • 19 Oct — Materials by stage.

    • Each unit's BOM is split into To source, On order and In hand.
    • There are new By order and By material views.
    • One band of materials figures appears on both the BOM and the unit page: estimate, planned, on sent orders, billed and from stock, ex GST. The estimate counts each estimate line once.
    • Ordering sheets from the whole-job nest has moved to Cut lists.
  • 19 Oct — Stock costs.

    • Taking stock that has no cost asks first (Take anyway or Set cost), and a row taken with no cost says so.
    • Set cost on the Stock page gives an item a cost, with the reason recorded in its history. It prices the next take, not ones already made.
    • Return surplus is now offered only on rows bought on a purchase order.
  • 19 Oct — Stage warnings.

    • A making stage with nothing on it for two working days is flagged Stalled. A stage past 120% of its estimated hours is flagged Over hours. Both lines can be changed under Making rules.
    • The job's foreman and the workshop managers get both warnings in Needs you.
    • A unit whose hours left won't fit before its due date is flagged Late. The Workshop page shows when each unit should finish, and the Crew tab marks the bookings that need a look.
    • The programme's Manufacture task now moves with the stages.
    • The morning workshop report adds the stages closed, photos to check, what needs a look, and who is on what today.
  • 19 Oct — Checklists from the model. A released unit's Assembly checklist now has a line per cabinet step with its part marks and hardware, Finishing lists the finish spec and finishes, and QA measures the overall sizes. Finishing skips itself when there is nothing to finish.

  • 19 Oct — Scans move the stages. Machining closes itself once every part has had its last operation. Scanning parts Assembled ticks the assembly lines that list them. QA is passed on the unit, never by a part's scan. A failed QA adds a rework line and a note.

  • 19 Oct — Skipping a stage whose checklist still has open lines needs Close stages without their proof.

  • 19 Oct — Labels for cabinets and crates. Releasing a unit now makes a label for each cabinet: scanned in the workshop it shows how that cabinet goes together. Each crate gets a label too: scanned, it lists what is inside and takes Packed, Dispatched and Delivered.

  • 19 Oct — Labels show installers what they need. Once a unit is dispatched, its labels show where it goes, the installation notes, the crate it came in and the approved drawing, and take Log install with photos. Only someone on the job's crew, or a person of a company on the job, can deliver or install from a label.

  • 19 Oct — Proof of delivery. A crate is marked delivered with the receiver's name and signature, or a photo of the signed docket.

  • 19 Oct — The Delivery tab shows the pipeline (ready to pack, packed, on their way, on site, installed), prints each crate's label and manifest, and can install a whole crate at once with exceptions. A unit's page takes its installation notes and the PM's Sign it off once installed.

  • 19 Oct — Drawing approvals in one place. A job's Drawings tab now starts with Approvals: every unit grouped by where its drawing is (to issue, to check, ready to send, with the client, changes requested, approved), with the last action, who did it, who it waits on and for how long. Open a row to pass the check, send it back, send it to the client or record their answer without opening the sheet.

  • 19 Oct — Releasing a unit now records its For construction transmittal, once per approved revision.

  • 19 Oct — People on stages. The Workshop page has a Crew tab: each person's working days, the stage hours booked on them against the hours they have, and the units waiting on a stage. Drag a unit onto a person's day (or press the unit, then the day) to put them on it. A unit's stage cards show who is on each stage, with Assign, and their hours by person. Each person sees the stages they are on under Your units on their own page.

  • 19 Oct — Labour by unit. A workshop sign-out now offers the stages you stamped that shift, with your share of the day already filled in. When the week is approved, each stage's share of the hours is costed to that unit's own joinery line instead of the line of the unit ticked most, to the cent. Waiting hours show by unit on its page.

  • 19 Oct — Timesheets marks a shift check stages when hours ticked to a making stage don't match its Start and Done times, so you can fix it before approving.

  • 19 Oct — A crew member can be marked as a subcontractor's person on their page. Their hours are never posted as wages.

  • 19 Oct — A stair's GA plan now prints at the largest scale that fits: when moving the notes under the plan lets it grow, they move, so a long dog-leg reads at 1:25 across the sheet instead of 1:50 in a corner. On a pergola's footing plan (PG-02), each footing's size and uplift now sit beside the footing, clear of its circle and the beam line.

  • 19 Oct — Making stages you can see. Every released unit now has four making stages — Machining, Assembly, Finishing and QA — each with who started and finished it, its hours, the files it builds from, a checklist from its model, and its photos. The crew work them from the unit's label on a phone with their PIN: open the cut list or assembly pack, tick the lines, take a photo, press done. The office works them from the unit's page, and can skip, block, reopen or type hours with a reason. A stage can't be marked done without its checklist and photo; Done anyway… with a reason is for someone an admin allows. Marking a stage done moves the unit on, and QA failed sends it back.

  • 19 Oct — Shop files filed at release. Releasing a unit now files its cut list, nest, CNC programs, assembly pack, finish spec, drawing and part labels onto its stages and into the job's Documents (new types Workshop Files and Workshop Photos).

  • 19 Oct — Making rules. Settings → Machines, tools & stations has a new Making rules section: which stages need a photo, lines every unit carries at a stage, the QA list, and when to warn about hours and stalled stages.

  • 19 Oct — A new permission, Close stages without their proof, is off for everyone until an admin grants it.

  • 19 Oct — A page for every unit. Each joinery unit now has its own page with its whole story in the order it travels: Design, Drawings (with the approval bar), Materials (every BOM row and where it is), Making, Delivery & install, and History. Open it from a unit's name on the Manufacturing page's Units list, Open on BOM & orders, a unit's tag on a crate or install row, or Open unit in its quick view.

  • 19 Oct — One track, one next step. On a job's Manufacturing page, Units → List now shows each unit's Track (Design to Installed, with dots for Machining, Assembly, Finishing and QA) in place of the separate drawing and production labels, its Next step, its Joiner and Due date (both set right on the row) and its Flags: Blocked, Overdue, Changed since approval, With the client, Over hours, Over materials. Show narrows the list to Blocked, Overdue, With the client or Making units. A step that cannot be taken says why under it, and Release to workshop lists every gate still to meet with a link to fix it.

  • 19 Oct — Board (was Shop floor) now shows every unit before dispatch, released or not, each card with its track, flags and the same next step as the list. The Workshop page shows the same track and flags, and now uses one set of stage colours.

  • 19 Oct — Release again without losing labels. Pressing Release to workshop on a unit that is already released no longer re-freezes its parts: every label already printed keeps scanning. It only adds what the unit is missing — part labels for a unit released before labels existed, or station steps for stations set up since.

  • 18 Oct — Send a unit back a stage. On the Manufacturing page's Shop floor, each card in Machining or later now has a back link, such as ← Machining on a unit in Assembly, for rework. From Machining it takes the unit off the floor to Materials received, and asks you to press again first.

  • 18 Oct — On Start the build model, the list of ways to start down the left now scrolls on its own, so Design a whole room, Design a pod or a small home, Design a pergola, patio or carport and the rest can be reached on a laptop screen without scrolling past the whole template library first.

  • 18 Oct — Take a row off a draft order. On the Manufacturing page's BOM, a row on a draft purchase order now has Take off: it goes back to planned, so you can order it elsewhere or take it from stock, and the draft loses its line (a draft left empty is deleted). Deleting a purchase order now puts its ordered BOM rows back to planned too.

  • 18 Oct — The Project Manager preset now includes Design and Joinery, so a job's head PM can work its Manufacturing page — issue the drawings and release units to the workshop — and open it from the notices that link there. People already on the preset keep what they had: Team → Members offers Update to the new Project Manager.

  • 18 Oct — On Home, a job in its defects liability period (practical completion declared) is left out of Portfolio health and Needs you, and Recent projects marks it Handover & DLP, as the old dashboard did.

  • 18 Oct — Always for this sender on Home now asks for the same as filing an email on a job: the Comms module and Projects → Edit.

  • 18 Oct — Issue & price. A new Issue & price button in the 3D designer, under Follow-ups on Designs and on a unit's drawing sheet issues the design's drawing as its next revision and prices it in one step: the PDF is filed in Documents, the materials go onto the estimate from your rate book waiting for approval (or, on a won job, into a draft variation), anything the book cannot price is listed, never guessed, and the job's estimate chat opens with a message ready to send. Press it again on a changed design and only its own unapproved lines are replaced.

  • 18 Oct — No PDF, no issue. Issuing a drawing now files its PDF first. If the PDF cannot be made, or the saved drawing set is older than the model or is a part set, nothing is issued and Base says why. Issuing from the chat files the PDF too.

  • 18 Oct — Only issued drawings get a letter. A saved drawing set is now labelled P1, P2 and so on, and each issue takes the next letter (A, B, C). The client approval sheet shows the issued letter. Drawings saved before today keep the letters they had.

  • 18 Oct — Re-pricing a deck, pergola, stair or house frame from the chat now replaces only the lines it wrote that nobody has approved. Approved lines, and lines you wrote yourself in the same group, are left alone.

  • 18 Oct — Drawing approvals you can prove. The client's approval link now shows the exact PDF you sent, with its fingerprint. To approve, the client types their name, draws their signature and ticks I've checked sizes, finishes and appliances; their IP address and browser are kept with the answer, and a stamped APPROVED copy (name, time, revision, fingerprint) is filed in the job's Documents.

  • 18 Oct — Approve as noted. A client can approve a drawing subject to notes. Work is not held, and the notes are listed on the next revision's Design notes sheet until they are resolved.

  • 18 Oct — Delivery, Outsourced and BOM on the Manufacturing page. Crates take a delivery address and notes, and can be edited, or deleted until they are dispatched. Outsourced jobs show their purchase order and let you set the status and the subcontractor's dispatch date. The BOM shows each row's Lead time (from the row or the supplier, never guessed) and when it is Expected by.

  • 18 Oct — An added page for a design addition. When a design is added to a job after its drawings were issued, the floor plan's whole drawing set now ends with a page for it: where it is on the plan, its outline with overall sizes, and its tag. File the set and attach it when you ask the designer for the revision.

  • 18 Oct — Transmittal recipients are kept in Contacts. Every email address a drawing transmittal is sent or recorded to is matched to the person already in Contacts with that email, or added as a new contact. Each transmittal can now start an automation (Drawings transmitted).

  • 18 Oct — A framed counter or bar (a capsule reception, say) now orders hinges for its doors and shelf pins for its shelf, and its CNC files drill the hinge cups, the mounting plates and the shelf-pin rows.

  • 18 Oct — Decks and pergolas in 3D are drawn the way they are built: joists stop at the rims and bearers, rafters sit on the beams, braces start at the post face. Quantities and drawings are unchanged.

  • 18 Oct — The whole-job nest card on the Manufacturing page says when it could not be read, instead of disappearing.

  • 18 Oct — Curved decks. In the deck designer, any edge away from the house can sweep in an arc: pick the edge and its rise under Arc edge. The frame, the boards and the fascia follow the curve, the outer bearer steps round it, and the deck plan sheet shows the radius and the rise.

  • 18 Oct — Decks round a tree or a spa. Add opening cuts a hole or a notch out of a deck zone. It is framed with doubled trimmers and headers, the boards are cut round it, its edges get fascia and, where the drop is a metre or more, a balustrade. The estimate counts the boards cut to a curve or round an opening, and the offcut they leave.

  • 18 Oct — Decks in a house corner. Under The house, Corner wrap puts the deck against a second wall at its left or right end. The bearers end on a second waling plate on that wall instead of posts, and the drawings go FOR ENGINEER'S CERTIFICATION, as they do for a deck with an opening. Five new deck templates start from each.

  • 18 Oct — Hip and Dutch-gable pergolas. The pergola designer now draws hip roofs (four slopes, hips and jack rafters to a ridge, or a pyramid on a square plan) and Dutch gables (a hip that turns into a small gable at each end of the ridge). The sheets are cut to the hips, a gutter runs round all four sides, and the estimate counts the hip cuts, the hip and ridge capping and the gablet infill. New templates: Hip pavilion, Pyramid gazebo and Dutch gable pavilion.

  • 18 Oct — Opening louvre roofs. Pick Opening louvre as the pergola's form for a level frame carrying the supplier's louvre blades, off a wall ledger or freestanding. The blades, pivots, linkage and drive are priced from your rate book by name, and the blade span comes from the supplier's table, entered once under Settings → Engineering tables (role blade). New templates: Opening louvre patio and Freestanding louvre roof.

  • 18 Oct — Engineer sign-off for every design. House frames, decks, pergolas and stairs now have a Certification panel. Send for certification makes a link for your engineer: it opens the design basis and every sheet, and takes their signed certificate (Form 15, Section 40, a UK chartered engineer's signed calculations and so on) straight back into the job's Documents. Sheets are stamped NOT FOR CONSTRUCTION, FOR ENGINEER'S CERTIFICATION, or CERTIFIED with the engineer's name, registration, certificate reference and the design revision. Change the design after it is certified and the certificate shows as stale.

  • 18 Oct — Require a certificate before you make it. An admin can tick Require an engineer's certificate before machine files are written on any Certification panel. With it on, roll-former machine files are refused for a frame that is not certified at its current revision. It is off unless you turn it on.

  • 18 Oct — Stair stringers are checked. The stair designer now checks each flight's stringers for strength and bounce, shown with the other checks. A stringer that fails holds the stair NOT FOR CONSTRUCTION; one that passes still goes to your engineer, because the figures behind the check are not verified. Deck, pergola and stair drawings follow the same rule as house frames: a check resting on figures that are not verified goes to the engineer.

  • 18 Oct — Engineering tables. A new settings page, Settings → Engineering tables, keeps the figures your structural checks are decided by (spans, bracing, connectors, wind, footings, pergola, deck and sheeting) as rows, each with the standard, edition, table and clause it was read from and its basis: licensed copy, supplier data, engineer-verified or derived. Import them from a CSV; a file with a wrong line imports nothing and lists the lines. A check decided by a derived row goes to your engineer for certification instead of claiming deemed-to-satisfy. Rows you had in Framing settings came across as derived.

  • 18 Oct — Foundation hold points as forms. On a frame's Foundation tab, the Issue button files each hold point on the job as an inspection form (founding, pre-pour, module set-down, tie-down), filled in from the design. Your own AS 2870 footing row for the site class, if you have entered one, is named beside them. Slab set-downs are now drawn on the plan sheet.

  • 18 Oct — Finishes and upgrades, with allowances. On a job's Client page, Finishes and upgrades lets you offer the client finishes on each design they have been sent (fronts, benchtop, carcass and so on), each option priced from your rate book against an allowance line in your estimate. In the portal the client sees a swatch, a name and +$X ex GST / $Y inc GST over allowance, and picks. Before the job is won the pick waits as an estimate change for you to approve; after the win it waits as a variation for you to raise.

  • 18 Oct — Give your client options to compare. A shared 3D design can now carry two or three versions, an earlier revision or another design on the job, each priced from your rate book, ex GST with inc GST beside it and the difference against the first. Your client chooses one on the page; their choice waits under the link's Options for you to Apply as next revision or Decline.

  • 18 Oct — Walk through it, or see it in the room. On a shared 3D design your client can press Walk through and walk the design at eye height, and on a phone View in your kitchen stands it in their room with the camera (Apple's and Google's own AR viewers). On a computer the same button downloads the model. The client approval sheet's cover now has a QR code that opens the design in 3D.

  • 18 Oct — The shared 3D design page follows the light theme and the rest of Base's look: the same fonts, fields and buttons as the app.

  • 18 Oct — A revision on a won job is priced. Under a unit's stored drawing set, Contract change shows what the revision does to the contract against the approved drawing ("This revision changes your contract by … ex GST (… inc GST)"), priced from the unit's materials and your rate book, and lists anything it could not price. Stage variation writes it as a draft variation for approval; the client approval sheet then prints the same line. Notes pinned on the 3D model now go on the next drawing set as a Design notes sheet, open or resolved, against each part mark.

  • 18 Oct — Step hours fill themselves in. Each night a workshop step takes its hours from what people said they worked on at sign-out, and its start and finish from the first and last scan at its station. Hours you type on a step are never replaced. A new Daily workshop report (Automations, off until you turn it on) sends the workshop managers and the job's head PM each weekday morning: who worked on what, who did not say, anything blocked, the stations finished and any problem reported at a station.

  • 18 Oct — Templates for every design. Pods and stairs can now be saved as templates too, and every template is saved through one dialog with a name, a description and a shelf. On the start screen, Your templates shows rooms, pods, stairs and curved bodies your team saved, grouped by shelf, and the pencil on a template renames it or moves it to another shelf.

  • 18 Oct — A new way round the 3D view. One toolbar along the top holds every tool, with the rest under ⋯. A view cube in the corner turns the model to any face, and the view menu switches between perspective, flat (ortho) and true iso and keeps your saved views, including what you had hidden and where the section was. Undo says what it will undo (Undo move Bay 2 120 right). One chip tells you when anything is hidden, with Show all beside it.

  • 18 Oct — Measure and cut in 3D. Measuring shows a snap marker and the live distance before you click, then the X, Y and Z parts of it, with pin, copy and an axis lock. Parts turned at an angle snap to their own edges. A section has a handle you drag along the cut, axis chips and Flip. The Outline tab lists every assembly and part with an eye and an isolate on each row, right-click a part for its actions, and ? shows every key.

  • 18 Oct — Re-sweep a curved run from its Build tab: change its radius, sweep or number of facets and each facet keeps the changes you made to it. One Undo puts it back.

  • 18 Oct — On the floor plan, a wall end dropped near a free corner snaps to it, and a wall that runs a little past a corner offers Trim to corner.

  • 18 Oct — Pods: the skillion roof is now built to its 2° fall with tapered packers, and the roof sheet is taken off at its real area. A home can be built as two transportable modules: the drawing shows the mate line, the quantities list the mate flashings, seal and bolts, transport and crane are counted per module, and panel marks start M1- or M2-.

  • 18 Oct — A spiral stair's handrail is now one rolled rail round the full turn, taken off and weighed at its true length. Iso views and drawings show shaped, round and angled parts at their real shape instead of as boxes.

  • 18 Oct — House frames: an upstairs wall that does not sit over a wall below now gets a sized beam to carry it, listed on the beam schedule, with its load taken down to the footings.

  • 18 Oct — Shop drawings you can build from. The setting-out plan no longer runs figures together: each layer has its own dimension chain, wall units are dashed and marked OVER, and runs are set out from the walls. Each cabinet sheet dimensions its drawer fronts, reveals, kick, top and handle positions, shows the benchtop it carries, labels the section FRONT and WALL with the drawer runners, cites each detail's sheet, and gives fixings on the details and a wall-fixing detail for wall units. The panel schedule has a Grain column, and sink and cooktop cut-outs, tap holes, wastes and appliance clearances are scheduled.

  • 18 Oct — Workshop reports in the drawing set: an edge-band report (every tape, metres to order and the parts it goes on), a hardware schedule per cabinet and a pick list. The nesting sheets are drawn bigger and never shrink a part mark below readable size. Workshop copies print in black and white with "print at 100%" on every sheet and a bookmark per sheet in the PDF.

  • 18 Oct — A workshop pack of one assembly sheet per cabinet (its parts, hardware and the order to build it), install sheets for each room on a floor plan (setting out from the walls, heights, fixings, services, install order and crates), and a DXF download of the drawings with layers for architects. Part labels now show the part's shape with its banded edges, its cabinet, the drawing number and the next station.

  • 18 Oct — The client approval sheet opens on the design's newest render. Shared 3D designs open in the Showroom look with their renders beside them, and the client portal has a Designs section: each design sent to the client, its render, where its drawing stands and Open in 3D.

  • 18 Oct — Drawings for every design. A curved run gets a setting-out with its radius, sweep and arc length, a developed elevation and one typical facet sheet instead of the same facet drawn six times. A stair gets a plan with the walking line, an elevation along each flight with its risers and goings, stringer set-out, a member schedule and a connections sheet (weld and anchor details marked TBC for the engineer). A pod gets a plan of the whole with its rooms, its four elevations, room plans, one panel schedule, the floor and roof cassettes and a lifting sheet, so a two-bed pod is 11 sheets instead of 34.

  • 18 Oct — Shop drawings now tag every front with its finish code (such as MEL-01 or LAM-02, or your own code when you give one), with a finish schedule on each sheet. Detail bubbles say which zone of the sheet the detail sits in. Panels set at an angle are drawn in their real shape on the exploded page, an L-corner sheet shows both legs, and wall panelling is dimensioned to its sheet joints and battens.

  • 18 Oct — The assistant can now render a house frame: ask for a render of a saved frame and it captures the frame designer's 3D view from several angles.

  • 18 Oct — Big drawing sets are issued, not refused. A set past 40 sheets now comes out with its most useful sheets, a drawing register as sheet 00 that lists every sheet, and PART SET on each issued sheet; the unit's row says why. Deck, pergola and house-frame units now keep their own drawing sets in the register.

  • 18 Oct — One mark per part. Every part now has one mark, like B03-07 (cabinet B03, part 7), printed the same on the panel schedule, the exploded drawing, the nesting sheets, the machining list and the part label. The schedule gains Mark and Cabinet columns.

  • 18 Oct — File a deck, pergola or frame drawing set. File PDF beside the download on a deck or pergola card, and in the house-frame designer, saves the whole set as one PDF in the job's Documents. Filing it again keeps the older one and marks the new one as its replacement.

  • 18 Oct — Shop drawings read right. A long panel schedule runs on to continuation sheets instead of losing rows off the page. The title block has room for the client, the site address, who checked and approved it and the issue date, says AS SHOWN when the views use different scales, and each view has a scale bar. The "indicative model-generated drawing" line no longer prints beside the sign-off (an admin can turn it back on). A scribe filler is cut from full-thickness board instead of ordering a 1 mm sheet.

  • 18 Oct — The client approval sheet speaks plainly. It reads Design for your approval, says sizes marked TBC are confirmed by site measure, gives the bench height in millimetres, shows a swatch for every finish including the benchtop, and drops the cut-list and drawing-number codes.

  • 18 Oct — 3D viewer keys. F fits the model (or what you have selected) from where you are looking, and Shift+F opens the finish picker. Esc steps back one thing at a time (the search box, a picker, the tool you are using, your selection) before it closes the design. The scroll wheel zooms towards the pointer, the middle mouse button pans, and isolating a part shows only that part.

  • 18 Oct — Test panel for your CNC. Settings → Machines and tools downloads a test panel for any post profile: one row for every kind of cut it writes, with what to measure. Signing a profile off now needs a note of what you checked, and files written with a profile that has not passed say so at the top.

  • 18 Oct — Tool wear from real cuts, and tool import. Settings → Machines and tools now shows the metres each tool has cut since it was sharpened, counted from the parts scanned Cut or Machined, and flags a tool past its interval; Sharpened sets it back to 0. A unit's CNC report names any tool due for sharpening. Import tools reads a Vectric tool database (.vtdb) or a Fusion 360 tool library (.json) — diameter, flutes, type and feeds — and can load the tools straight into a machine.

  • 18 Oct — Pod and frame wall linings with a window over a door, or two openings that touch, are now cut and weighed correctly instead of one opening being left out.

  • 18 Oct — Tracing a plan from a PDF page that is rotated or cropped now gets the scale right, and refuses a scale it cannot trust.

  • 18 Oct — A joinery crate that sits packed for three days, or past the day its delivery was due to start, now reminds the head PM until it goes out.

  • 18 Oct — Pergola lights and fans now reach the estimate. Applying an assembly to a won job is refused, like any other estimate change after the win.

  • 18 Oct — Manufacturing: one next step per unit, and two approvals before anything is cut. Every unit on a job's Manufacturing board, and on the Workshop board, now shows the one thing it needs next — issue drawings, check them, send them to the client, release, order, receive, start making, move it on, dispatch, install — and takes you there or does it. A shop drawing now passes an internal check by someone other than the person who issued it, then goes to the client with a link where they approve it or ask for changes (Settings → Drawings can make the check enough on its own). The nine tabs are now four: Units, Drawings, Materials and Delivery & install. A unit's panel shows its track, its joiner, its hours against the estimate and the model, its materials against the estimate, what the floor has done to its parts and every move it made.

  • 18 Oct — Materials follow the orders. A unit moves to Materials ordered when its purchase order is issued — a draft no longer counts — and to Materials received when its last row arrives, with partial deliveries shown as "12 of 24 in". A BOM row on an order takes its status from the order. Pushing a cut list again no longer orders what is already ordered or taken from stock, and pushed rows take their supplier from the rate book.

  • 18 Oct — The workshop floor. Set up your stations under Settings → Machines, tools & stations; releasing a unit lays its steps out over them with the model's hours. Label scans work with a crew PIN, reach Sprayed and QA passed, mark a station's step started and done, and a reported problem pins a note on the unit. At the workshop QR, sign-out asks which units each job's time went on, so a unit's logged hours and labour cost are real. The Workshop board can move units on, give them a joiner and print their labels, and flags a unit overdue against its job's dispatch date when it has none of its own. A unit has to be released before it can be moved onto the floor, and a transmittal can say For construction only once the newest revision is approved. Drag the right end of a bar on the Workshop Gantt to move a unit's dispatch date. The workshop and the head PM are told when a problem is reported at a station, and the head PM when a unit is ready to dispatch. A row added to a BOM by hand takes its supplier and price from the rate book, and a unit's panel shows how long each station step took.

  • 18 Oct — Home replaces the Dashboard. Home, at the top of the side menu, opens with one line saying what needs attention (or All clear), then your cards — the money position, live jobs with the worst first, portfolio health, what is due today, recent projects and, with the CRM, the sales pipeline, quotes out for decision and follow-ups. Arrange the cards yourself or ask the assistant, pull in almost anything in Base (leads, jobs, the programme, tasks, RFIs, variations, defects, claims, bills, the site diary, emails and more) as a list, table, number, bars or monthly trend, and add boards of your own beside Home. Cards your Team Modules do not include are left off. CRM opens on the pipeline. Only an admin can set the team's default view.

  • 18 Oct — Needs you, at the top of Home. One list of what to do next, from everything Base already tracks — bills and decisions waiting on you, overdue claims, jobs at risk, the money position, new enquiries and follow-ups, people waiting on a reply, connections that stopped working. Most urgent first (Now, Today, This week), one button per row, and Mine or Everyone. Snooze a row for yourself until tomorrow, Monday or until something changes; it comes back saying what changed. It says what it checked, and names anything it could not.

  • 18 Oct — The pipeline says what to do, and whether the crews have work. Pipeline opens on Next up: one list across every stage, in the order to work it — respond, overdue next steps, quotes due this week, go / no-go, no next step — each lead once, with one button. Work in hand shows won work still to build and the pipeline by the month it would start, against what you can build in a month, with months secured and the biggest gap. The Board stays for the weekly meeting. A go / no-go check before estimating reads five things Base knows and suggests, never decides; No go closes the lead as Declined, counted apart from lost. Analytics is now Win & loss, with hit rate by count and value, where leads drop out, why you lose and the cost to win. Values are weighted by your own hit rate, not a typed probability.

  • 18 Oct — What moved since Monday, and can the estimators price it. Under Work in hand, Since Monday walks last Monday's open pipeline to today's — new leads, value up and down, lost, declined and won — and each row opens the leads behind it, with any decision dates pushed later named. A new Tenders view shows each estimator's week booked, this week and the next seven, with a bar for every tender to its due date. Owners get a Work in hand card on Home, and the Sales pipeline card now opens the Board.

  • 18 Oct — Say who beat you, and by how much. Marking a lead lost on Price or Went Elsewhere now asks who won and at what (type it however you like — 1.08M, 950k), and whether you know it or are guessing. Win & loss shows the median gap between your price and the winner's for the prices you know.

  • 18 Oct — A lead's follow-up date is its next step. Changing the date on a lead moves its follow-up task, and finishing, moving or adding a task on the lead moves the date, so the follow-up rail, Next up and Needs you agree on what is next.

  • 18 Oct — Always for this sender. In Mail on Home, Not this job can now file everything from that sender on the job from now on. Replies you send from Home also stay in the same conversation in your own Gmail or Outlook, not only in theirs.

  • 18 Oct — Mail keeps itself up to date, and goes where you want it. New mail and finished summaries appear on Home without a refresh. Customise can move Mail below the cards or hide it. How long someone has waited now counts from when they sent the email, so older mail brought in late shows its real age.

  • 18 Oct — Days in stage on the pipeline, the Leads list and a lead's panel now count from when the lead moved into its stage, never from its last edit, so a lead edited overnight no longer reads 0 days.

  • 18 Oct — Home starts where your day does. Someone new to Home starts from the layout for their role — owner, project manager, estimator or site — unless the business has set a team default, and Reset to the … start under Customise goes back to it. On a phone, each card is its title and headline figure until you tap it open.

  • 18 Oct — Mail on Home. Your inbox, sorted by job into Needs a reply or decision, On your jobs and Everything else. Open a conversation and Base summarises what is being asked, checks it against your programme, claims, RFIs and variations (saying what matched, what did not and what it couldn't check), and drafts a reply with every date, amount and yes marked. Review and send sends it from your own mailbox. When the facts disagree, Base says what to check instead of drafting. Summaries and drafts are yours alone, and you can switch Base's reading of your mail off.

  • 18 Oct — The exploded view in the 3D designer now comes apart cleanly on kitchens and pods. Each cabinet opens about its own middle, overheads lift clear of the run beneath them, a tall unit steps along its run instead of behind it, a pod's walls slide off the floor and the roof lifts above them, and an appliance or a basin moves as one piece and stays with what it sits in. Nothing passes through anything else at the full explode.

  • 18 Oct — No more lost or doubled email in Comms. When more than 50 emails reach a connected Gmail at once, the rest now come in over the next few minutes instead of being missed. Spam and drafts are no longer logged. Newsletters and social notifications (Gmail's Promotions and Social tabs) are still logged, but they no longer wake the assistant or save their attachments to a job. Asking the assistant to file an email on a job now files the copy already in Comms rather than adding a second one.

  • 17 Oct — Files from email no longer need a job. Ask the assistant to pull an attachment off an email and it saves the file on the job you name, on a supplier's or client's company card, on a lead, or in the company-wide Documents library when the email is not about any one job. Before, an email with no job was refused and the file stayed in your mailbox.

  • 17 Oct — Big designs draw faster in 3D: every board of the same finish is drawn in one go once a model passes 150 parts. Batched drawing in ⌘K turns it on or off.

  • 17 Oct — When you receive equipment that has a spot on the plan, the company named in Installed by… is emailed a link for each item, showing where it goes. CNC files can now be written for SCM Xilog (.xxl) machines. The whole-job nest fits curved and L-shaped parts by their real shape when that saves sheets, and can place small parts inside a ring's opening.

  • 17 Oct — The Whole job box on the Cut lists tab now lists the offcuts worth keeping (300 × 300 or bigger) and their total area. The sizes are also in the sheet DXFs' report. The curved-body drawing set gains an Exploded assembly page as well.

  • 17 Oct — The 3D viewer:

    • Pin a note to a part in ⌘K leaves a numbered note on the part. Everyone on the job sees it, and it can be resolved.
    • While you edit a design, a part you placed has a drag handle. Moves snap to 1 mm, or 10 mm with Shift, and Undo works as usual.
    • The section cut now draws the cut faces solid.
    • Typing in the design form no longer waits for the 3D view to redraw, and changing one part no longer redraws the outline of every other part.
  • 17 Oct — The exploded assembly page puts its numbered balloons around the outside of the drawing, so no leader crosses another. L-shaped and other shaped panels are drawn in their real shape, and an L corner's plan view shows the L.

  • 17 Oct — Email drawings from Base. A transmittal can now be emailed: fill in Email to and press Email & record, and the shop drawing PDF goes with it. In Client view on a unit's sheet, File PDF saves the client approval sheet in Documents, and File & send also emails it for approval.

  • 17 Oct — Box labels that show where equipment goes. When you receive an order, a line can be sent to a spot on the floor plan (Goes to…). Each item received then gets a label. Its QR opens a crop of the plan with the spot in red, plus the room, the mounting height and the services the item needs. Installed on that page records the install in the site diary.

  • 17 Oct — Wall panelling. Design wall panelling on the start screen sets out flat, V-groove, fluted or slat panelling, or a wainscot. Sheets are cut to equal widths across the wall and sit on battens at 600 centres or closer, and every joint lands on a batten. The take-off counts the battens in stock lengths, nests the sheets and orders adhesive and brads.

  • 17 Oct — L corner cabinets. Design an L corner cabinet on the start screen makes one cabinet across the corner where two runs meet. It has L-shaped shelves and a bifold door pair that opens the whole corner, so there is no blind panel and no filler. Its take-off orders the bifold hinges.

  • 17 Oct — Every cabinet drawing set now has an Exploded assembly page. Each part has a numbered balloon that matches its row in the cut list. Each board has a finish code (F1, F2 …) keyed to a legend on the same page.

  • 17 Oct — Buy for stock, charge the job only for what it uses. A stock order is now a real purchase order on the company's Stock job — issued, sent and received like any order, its bill paid like any bill, but never part of a job's costs and booked in Xero to your cost-of-goods account. On a job's BOM & POs tab, tick a row and press Order for stock to buy a whole pack: when it is delivered, all of it goes on the shelf and the row takes its share at the pack's price — the job pays for its 3 boards, the other 27 wait for the next job. The company P&L counts stock when it is bought and does not count a job's share again.

  • 17 Oct — The 3D viewer:

    • Measure now snaps to corners, edge midpoints and face centres. Hold Shift to keep the second point straight along an axis. Measurements stay on the unit when you come back.
    • Download saves a PNG at twice the screen resolution, with the dimensions and labels included.
    • ⌘K can save camera views and go back to them, and can Compare with the previous revision, which colours added, changed and removed parts.
    • Glass doors show what is behind them, and LED strips glow.
    • Esc clears the measure, pickers and selection.
    • The viewer's single-key shortcuts only work while you are using the viewer, so typing on the estimate page no longer moves it. In the estimate's viewer the mouse wheel scrolls the page; hold Ctrl or ⌘ to zoom.
    • On a tablet, a long press selects the whole assembly. Selected parts are outlined as well as coloured.
  • 17 Oct — The Shop floor tab now shows the job's released units by stage, each with its latest label scan. Move a unit on from the board, or scan its parts at a station and the unit moves forward by itself.

  • 17 Oct — Design a curved body on the start screen makes a capsule counter, capsule bar, rounded island or round display drum without the chat. For one that is already designed, Re-plan curved body in ⌘K changes its size or plinth and rebuilds it, telling you first how many hand-edited parts will be replaced.

  • 17 Oct — Issuing a shop drawing for approval now saves its PDF in Documents and links it to the revision. Every cabinet drawing set now includes a Nesting page and a Machining page. Large sets are no longer refused at 16 pages.

  • 17 Oct — The Cut lists tab shows a Whole job box when the job has two or more units. It shows how many sheets every unit takes when nested together, and offers the sheet DXFs.

  • 17 Oct — Say what you worked on at sign-out. The end-of-day sign-off now lists your tasks and the joinery units in production on the job, with your own first. Tick what you worked on and mark each one done, part done or blocked. The site diary lists it by person. The Workshop page has a new What the team worked on panel showing hours per item and anyone who didn't say. Link a crew member to their Base login on their worker page so their own tasks appear first.

  • 17 Oct — Part labels with QR codes. Releasing a unit to the workshop now freezes its parts and gives each one a QR code. Labels, beside In workshop, prints them on a 100 × 50 roll or A4 sheets of 14. Scanning a label on a phone shows the part, its size, edges and machining, and which unit and room it belongs to. Signed-in staff can record it as cut, edged, assembled or packed, or report a problem.

  • 17 Oct — CNC files for your machine. On the Cut lists tab, CNC files downloads one program per panel in your machine's own format, plus a part list and a report of any missing tools. Set up your machines, tools and file format under Settings → Machines & tools. Base learns the format from a file your machine has already cut. The cut list also shows the workshop hours counted from the model.

  • 17 Oct — More of a real kitchen in the 3D designer:

    • Drawer heights: type each drawer front's height, such as 150, 250 and the rest.
    • Applied end panels: each end panel runs to the floor, and the benchtop moves out with it.
    • Benchtop cut-outs: set out a sink or cooktop cut-out. Placing a cooktop on a benchtop cuts its own.
    • Blind corners: choose a LeMans, magic corner or carousel fitting and the door is sized to suit.
    • Construction: choose cam, dowel, confirmat or screw joints, a captured, grooved or screwed back, and a hanging rail for wall units.
    • Each of these reaches the cut list, the fixings ordered and the drawing notes. The assistant can set them all.
  • 17 Oct — Door styles and pulls in the 3D designer. Under Finishes choose a front style (slab, routed shaker, 5-piece shaker, V-groove, fluted, finger-pull, or glass in an aluminium or timber frame) and a pull (bar of any length, knob, finger pull, J-profile, channel, push-to-open or none), and override either on a single bay. The doors show it in 3D and on the drawing, the cut list cuts a 5-piece door as stiles, rails and a panel, the routing goes on the docket, and the pulls you chose are what get ordered. Push-to-open opens every gap to 2.5mm, which the latches need.

  • 17 Oct — A unit whose 3D model is changed after its drawing was approved now shows Changed since approval, and it can't be released to the workshop until the drawing is approved again.

  • 17 Oct — Pushing a cut list to the BOM now prices each row from your rate book when a line names the same material, thickness and unit. Rows it can't match exactly are left unpriced, and their note names the closest rate-book line.

  • 17 Oct — A 3D model that has a mistake in it now lists what is wrong in its warnings, instead of showing no warnings at all.

  • 17 Oct — Build your own workspace. Press the BASE lockup at the top of the nav and choose Build your own… to make a workspace of just the pages and job tabs you use. It starts from the ones you open most, and You use these most ranks the rest by how often you open them on this device. Add or remove tabs, group them under your own headings, drag them into order, and give the workspace a name and a colour. The nav shows it as you build. A page your workspace leaves out still shows under Open now while you are on it, with Add to pull it in. Your workspaces follow your account to any device, and you can keep up to five.

  • 17 Oct — Stock, under Build in the side menu: every sheet, roll of edging, hinge and length you keep, with what is on hand, on order, what it cost and what it is worth. Load the spreadsheet you keep your stock in, count the shelves, receive deliveries and raise stock orders to suppliers — New stock order fills itself with whatever is low or out. On a job's BOM & POs tab a new Stock column says what is in stock for each row: Use takes it off the shelf and charges the job its cost (ex GST, never in a payment run), the rest stays to order, and a unit whose materials are all on hand moves to Materials received by itself. Return surplus puts spare material back on the shelf and credits the job.

  • 17 Oct — The Leads tab now opens on a To work queue showing who has not been answered, overdue follow-ups, leads imported from your inbox and possible duplicates. Each can be cleared in one press (called them, qualify, assign, confirm, mark lost, merge), and the list below can keep saved filters.

  • 17 Oct — The exploded view in the 3D designer now comes apart the way an assembly drawing does: each stage of the build lifts off the one below it in build order, a cabinet slides out of the frame it sits in, doors and backs pull out their own sides, panels separate along their faces, and curved skins peel off whole. It moves smoothly, the view zooms out to fit, and dashed lines trace each piece back to where it belongs. Press E to pull it fully apart and again to close it. Play on the assembly bar now flies each step into place, with the step's name where the design has one.

  • 17 Oct — Ask the assistant for a curved or rounded joinery body, such as a capsule reception counter, a capsule bar, a rounded-corner island or a round display drum, and it is built the way the workshop builds it: a frame of plates, webs and ribs, bendy ply wrapped over the ribs, the tile layer over that, a cabinet standing inside and the top on its overhang. The drawings for it gain four pages: the frame set-out with every rib numbered, a section with the edge build-up, the part schedule with each bendy-ply sheet drawn flat and where it joins, and the assembly order with the checks to make before cutting. Bendy ply on any curved job is now ordered by the length it unrolls to, and tile by the area it covers.

  • 17 Oct — In the CRM, Pipeline and Leads gain choices for what cards and columns show, Just mine filters every tab to your leads, and Import leads from inbox asks the assistant to find new enquiries in your mailbox.

  • 17 Oct — A subcontractor's payment claim written in the email itself, with nothing attached, is now read too when Read subcontractor claims that arrive by email is on. Base files the email on the job's Documents as a PDF and puts the claim on Job Costs → Subcontractor claims to record in one press. It counts from the day the email arrived, and a PDF copy of the same claim is marked re-sent rather than recorded twice. A subcontractor on the job can word it any way that says claim, such as "Claim 4: $12,000" or "our October claim: $12,000". The assistant that handles your email never records such a claim as a supplier bill as well, and does not add a task just to assess it.

  • 17 Oct — The 7am brief and the Owner view now include subcontractor claims that came by email and are still waiting to be recorded, counted from the day the email arrived, in the subcontractor claims line under Needs you today. On the Owner view they show only for people with Job Costs.

  • 17 Oct — A job's head PM can now turn that job's task review and PM Agent on or off, and press Review now, without Automations → Install. It only works on their own job. The PM Agent needs setting up once for the business by someone with Install. A head PM's switch never changes the business's PM Agent settings. Your plan's limit on automated jobs and your business's AI allowance still apply, and everyone else still needs Install.

  • 17 Oct — When Base changes a role preset, nobody's access changes on its own. Team → Members now shows Update to the new … on anyone still on the older version, with what it adds and takes away before you confirm. Admins get one notice listing them.

  • 17 Oct — Turning on two-step verification for payments, or two-step sign-in for admins, now tells each admin and the owner who hasn't set up an authenticator app. They get a notice and an email to their own address.

  • 17 Oct — Base's own staff accounts now always sign in with a code from an authenticator app, whatever your business's two-step setting, because they can reach every business's data.

  • 17 Oct — Marking a payment run paid no longer waits on your approval limit. The limit applies when the run is approved; marking it paid records what the bank has already paid.

  • 17 Oct — If you reject a payee's new bank details on Money → Decide and their details change again, a new confirmation arrives within the hour instead of after a fortnight. The quiet after a rejection now covers only the details you rejected.

  • 17 Oct — A subcontractor's retention can follow their subcontract: set the share given back at practical completion and the defects period when you engage them or edit the engagement. The retention release, their Base portal and the cash forecast follow those terms. Without them it is half at practical completion and the rest at the end of the job's defects period, and their portal now says it is the usual split.

  • 17 Oct — The cash forecast now releases subcontractor retention on the subcontract's terms, or half at practical completion, instead of your client retention share.

  • 17 Oct — Record Project Outcome on Job Costs now records the quoted margin as a margin on the price, the same as the Handover page. Outcomes recorded there before today kept the quote's mark-up and were left as they were.

  • 17 Oct — Release retention on the Handover page now needs only Claims & Invoices edit, the same as asking the assistant.

  • 17 Oct — Give an Open defect to your own crew and it now moves to Assigned by itself. The site supervisor hears about it, and the worker gets their text if you switched that on. A subcontractor's defect still waits for you to assign it.

  • 17 Oct — Ask the assistant to log a defect as Assigned and it now sends the same notices as assigning it on the Defects page, whoever is fixing it. Before, a defect logged that way told nobody.

  • 17 Oct — Your crew can ask, from their own page, to add a day they worked but never signed in to. It waits on Timesheets → Shifts until you add it, and the added shift still needs approving before the hours cost anything.

  • 17 Oct — A worker's leave note is now kept apart from the request. Only people who approve hours can read it, and the worker sees their own note on their page.

  • 17 Oct — When a signed-off ITP is submitted on a job, the site supervisor gets a suggestion to record its hold point passed, with the ITP already picked. Nothing is passed until someone presses Record it passed.

  • 17 Oct — A notice of delay drafted from a site report now says only that a site incident occurred on that day. You write what happened, and the report's details, injuries and names stay out of the letter.

  • 17 Oct — On your client's portal, the number beside your head PM's name is now your business phone, marked Office. The head PM's own number shows only when you switch on Their own phone for the job on the Client page, because it is their personal number. The welcome email when you win a job follows the same rule.

  • 17 Oct — Once you verify a defect fix, a client who can see that defect sees its after photos next to the before photos in their portal. Until you verify it, the after photos stay with you.

  • 17 Oct — Declining a signing request from the emailed link now needs the emailed code first, the same as signing. A forwarded link can no longer decline your client's quote or reject a variation.

  • 17 Oct — A copy your client signed always stays in their portal. Hide from client is no longer offered on it, and Base explains why if you try. You can still hide the unsigned version it replaced.

  • 17 Oct — When your client signs at an address you typed in when sending it, the signed copy now shows in their portal, even if that address isn't on the job. That covers their quote, a variation, the contract you send from Client → Send for signature, and anything you also sent to an address recorded on the job as theirs.

  • 17 Oct — Send for signature on the Client page now has Another address, for sending the contract to your client somewhere their contact doesn't have, such as their work email. Once they sign, the signed copy shows in their portal.

  • 17 Oct — Only a client contact on the job can make a choice on a selection, the same as approving. Someone signed in with an email that isn't one of the job's contacts can see the selections and is asked to have you add them as a contact.

  • 17 Oct — A trade still not booked a week before its work starts is now flagged to the head PM once more, a week out.

  • 17 Oct — A hold point more than two weeks late is now told to the site supervisor and head PM once a week until someone records it passed or waives it, instead of going quiet.

  • 17 Oct — Putting one of your crew on a job, or posting a site notice, after 9 pm now texts them at 7 am instead of not at all. Nothing goes if you took them off the job, or cleared or replaced the notice, overnight.

  • 17 Oct — Your quiet hours (Notifications → Urgent alerts) now hold the texts Base sends you too, such as the site supervisor texts and the cash alert text, until they end. A text that is one step of a multi-step (Composite) automation is not held. Mute still covers alerts only.

  • 17 Oct — Tasks the assistant hands you while working on its own now come as one notice a day. A task it hands you in someone's chat is still told at once.

  • 17 Oct — The site supervisor now hears every time a defect is marked fixed, including a second fix after a send-back. Nobody is told about a fix they marked themselves, including by marking a maintenance request done.

  • 17 Oct — A subcontractor claim that came by email and is still waiting to be recorded is now on the Security of Payment clock. The two-day warning and the daily overdue notice include it, counted from the day the email arrived. The overdue banner on Job Costs → Subcontractor claims counts it and says it is still waiting to be recorded. Once you record it, the claim carries the warnings and nobody is warned twice. If the same claim was lodged in the portal or entered by hand after the email arrived, the emailed copy is still counted from the email until you press Link, and the notice tells you to link it. Both notices now name the claim, the company and the job, and say what to do next.

  • 17 Oct — Portfolio marks a job in its defects liability period with a Handover & DLP pill, on its lane and on the phone list. The Projects list in the Base phone app does the same.

  • 17 Oct — You can ask the client how the job went whenever you choose. After practical completion, Ask for a review on the job's Client page drafts the "How did we go?" email onto a task with you, to check and send. A new automation, Draft a second "How did we go?" email when the defects period ends, is off until you turn it on; when on, it drafts a second request for the head PM when the defects liability period ends. A request that was sent and never answered does not stop either one: its task closes as done and the new request takes its place. A client contact who has already reviewed the job is never asked again, and their review closes every request still open.

  • 17 Oct — Mark won now offers anyone on your staff as head PM, not only people already in a team. Picking someone in no team adds them to the job's team, or the one you choose, when the win is saved. This needs Teams → Edit.

  • 17 Oct — With Require two-step sign-in for admins on, the Base app asks an admin for their authenticator code as soon as it opens, before it shows anything. To get past it you enter the code or sign out. An admin without an app is offered Base on the web to set one up, then I've set it up brings them back to the code.

  • 17 Oct — With Require two-step sign-in for admins on, an admin's password alone now opens nothing anywhere. Base's database refuses their session until the code is entered, as well as Base on the web and the app. Update the Base app before you turn the switch on.

  • 17 Oct — Every time an authenticator app is removed from your account, Base sends you a notice and an email and tells your admins. The only removals not announced a second time are ones Base support made in a reset, because that reset already told you.

  • 17 Oct — A payment run's Approve, Mark paid and Cancel are now recorded on Money → Decide as decisions you made, and Cancel is recorded beside the approval it reverses. Approving a run follows your payment-run approval limit; over it, the run waits on Decide for someone whose limit covers it.

  • 17 Oct — Marking a payment run paid checks every bill and claim on it first. If one is no longer on your jobs, nothing is marked paid and no remittance goes out, and the page says why. If marking it paid fails partway, every bill and claim it had already marked paid is opened again, so cancelling the run puts them all back in the pool. If one could not be opened again, the page tells you how many.

  • 17 Oct — Once the final retention release is raised, the practical-completion share is never offered again, even if the final was edited down or a later claim held more. Whatever is still held beyond the final shows on the Handover page as The rest still held and is drafted as a second final release claim. This works even when the client has already paid the first final or it is in Xero. The closeout reminder and Money → Decide offer it too.

  • 17 Oct — Subcontractor claims: retention still held beyond a subcontractor's final release can now be released with Release the rest. The engagement shows its retention as released only once every final release is paid and nothing is still held.

  • 17 Oct — A job whose last progress claim was voided or queried no longer counts that claim's retention as held when you close it.

  • 17 Oct — The client portal's statement shows how much retention was held, how much has been released and how much is still held, all ex GST.

  • 17 Oct — The business's bank account, the payment details printed on quotes and claims, and a trading name's payment details can now only be changed in Base, by someone allowed to. Before, they could also be changed from outside Base.

  • 17 Oct — With two-step verification on, changing the bank account payment runs leave from, the payment details clients pay into, or a trading name's payment details asks for your authenticator code first. The bank balance never does, and the assistant can't make these changes while it is on.

  • 17 Oct — Every admin is now told when a trading name's payment details are added, changed or removed.

  • 16 Oct — Urgent alerts on your computer or in your phone's browser: an incident reported on site, a worker refused at the gate, someone who says they are not fit for work, a critical-path task running late and a forecast finish past the handover date now reach the job's site supervisor or head PM straight away. They go to anyone who turns alerts on under Notifications → Urgent alerts (on an iPhone, add Base to the Home Screen first). Alerts in the Base phone app itself come with a later update of the app. You can mute all alerts or set quiet hours. The two programme alerts come from the 6:15am weekday check, so if that falls in your quiet hours they arrive when your quiet hours end. A browser you turn off or remove stays off until you turn it on there again. The usual notifications are unchanged.

  • 16 Oct — The Site supervisor add-on has two new texts, off until you switch them on: one to the site supervisor when an incident is reported and one when a worker is refused at the gate.

  • 16 Oct — In the Base Management phone app, pages that open on the web (the programme, safety, job costs, handover, Money, settings and the rest) now open already signed in as you, instead of asking you to sign in again. If the app's browser is already signed in to Base as someone else, the page asks Continue as you first and changes nothing until you press it.

  • 16 Oct — The phone app has an RFIs screen on each job: raise one from site with photos and an addressee from Contacts, record the answer that came back, close it with what the answer means, or withdraw or reopen it. Sending RFIs out for an answer stays on the web, one tap away and signed in. See Drawings and RFIs.

  • 16 Oct — The phone app's Purchase orders on a job lists the supplier orders still waiting on goods. Open one to record what arrived, line by line, with the docket number and a photo of the docket. Every line, including a price adjustment line, starts at what is still outstanding, so a full delivery completes the order just as Receive… does on the web. It needs Subcontractors → Edit. See Purchase orders.

  • 16 Oct — Pressing Record receipt again after the signal drops, on the phone or in Receive… on the web, no longer counts the goods twice: the app says Already recorded instead. See Purchase orders.

  • 16 Oct — Turn a delay or instruction in the site diary into a notice of delay or a variation in one tap. Variations now record the working days they claim and the days granted; approving grants the time, the client sees it in their portal, and Move practical completion opens that date on the programme for you to move.

  • 16 Oct — An incident reported at the site sign-in can now say what kind it was, how bad, who was involved and what was done straight away. On Safety, any report becomes a defect or a notice of delay in one tap.

  • 16 Oct — Hold points: each job has a Hold points page listing the inspections its work waits for. Add one to a programme task with the ITP to fill, record it passed with the signed ITP (or with no form when the result came another way), or waive it. Nothing clears a hold point by itself.

  • 16 Oct — The site supervisor and head PM hear the working day before a hold point is due and not cleared, once per due date, in their inbox.

  • 16 Oct — Site home lists deliveries due (and late), inspections, hold points not cleared and RFIs holding up work, for today and the next working day. Each part shows only to people with its module.

  • 16 Oct — The afternoon look-ahead notice now adds deliveries, inspections, hold points not cleared and RFIs holding up work, up to three of each per job. Inspections and hold points up to two weeks late are included and marked late, even on a job with no other work coming up. A late delivery or a waiting RFI never sends a notice on its own.

  • 16 Oct — Programme: tick Inspection (hold point gate) on a milestone, and add a task's hold points from its panel. The list view marks a task with a hold point not cleared.

  • 16 Oct — The assistant records a hold point passed only when you tell it the inspection passed, never in a background run, and never changes one already passed or waived. It refuses an ITP with a failed item or an unsigned hold point.

  • 16 Oct — Two-step verification: add an authenticator app on your Profile (with a backup on a second device), and admins can switch on Settings → Finance → Require two-step verification to approve payments. Approving a payment run, downloading its bank file, confirming a payee's new bank details and making someone an admin (inviting one, changing a role to Admin or resending an admin's invite) then each need a 6-digit code from your app, entered in the last 15 minutes. It is off until an admin turns it on, and turning it on or off needs that admin's own code.

  • 16 Oct — With two-step verification on, the assistant and the phone app can't approve payment runs or bank-detail changes; what they were asked for waits on Money → Decide for you to approve with your code. A lost phone with no backup app is reset by Base support after a phone call to a number already on file, not by your admins.

  • 16 Oct — The Download .aba button now shows an error if the file can't be downloaded, instead of saving an empty file, and neither payment run lists nor the record of an approved or paid run on Money → Decide carry the bank file itself any more.

  • 16 Oct — Handover: Generate PC certificate, Release retention and Record outcome now open forms on the page instead of the assistant. The certificate lists the open defects, takes any other outstanding items and offers the client's signature. The release shows what is releasable, asks why when releasing the final balance past open defects, drafts the claim and records it on Money → Decide as your decision, approving the release of that share already waiting there; you still send it from Invoicing. Once the final balance is raised, the practical-completion share can no longer be released on its own, because the final release claims it. A practical-completion release still waiting on Decide is closed at the same time. Recording the outcome here never closes the job; Close project does. Each form has "or ask Base", and anyone without the needed access gets the assistant as before.

  • 16 Oct — Subcontractor claims: when a sub's final retention release is cut first, it now includes the practical-completion share, and Release PC is no longer offered next to it.

  • 16 Oct — A new Owner workspace and Owner view for admins and anyone with the Cashflow module. It shows the money position, what needs you today (the 7am brief's list, live, with each line linking to where you settle it), the decisions waiting, and every job in delivery with its health beside its margin and how the margin moved. A job in its defects liability period that is losing money, thin or had its margin drop is listed with its margin; the rest are named. Inside a job, the Owner workspace shows Job Costs, Variations and Invoicing beside the Programme, Site Diary and Defects.

  • 16 Oct — Admins can see how each project manager is going on the Owner view: their jobs in delivery, how many are at risk, losing or thin, how many had their margin drop (jobs in defects liability included), how far their programmes have slipped against the baseline, and their overdue tasks.

  • 16 Oct — On a phone, the dashboard's money band shows one figure per row instead of five cut-off columns, and Decide's buttons wrap onto a second line instead of running off the screen. The band now says when it is showing the last stored position.

  • 16 Oct — Your crew have a page of their own. At a site or workshop QR, My hours, tickets & defects asks for their PIN and opens the jobs they are on and what is coming up, their hours and whether each shift is approved, their recorded leave, their tickets and their defects. No login, and no pay rates. It always asks for the PIN, even straight after a sign-in, and a QR screen that still shows someone's sign-in goes back to the PIN box after two minutes untouched, so the next person on a shared phone or tablet cannot act as them. See A worker's own page.

  • 16 Oct — Your crew can ask for time off from their own page too: the same request as at the QR, answered on Timesheets → Leave. At a QR, Ask for time off now asks for the PIN again wherever it is pressed, so on a shared phone or tablet nobody can read or ask for someone else's time off.

  • 16 Oct — A worker can ask, from their own page, for a shift's start or finish to be fixed. The shift waits under Needs attention on Timesheets → Shifts for you to Apply, Edit or Decline, and the site supervisor is told. Nothing changes until you act; applying is an audited edit and withdraws any approval. See Timesheets.

  • 16 Oct — Your crew can add a photo or PDF of a ticket or licence from their own page. It lands on Tickets not verified until someone sights it, and your admins are told. A ticket that came with a photo or scan, one a subcontractor's office uploaded included, now has View beside it, so you can check the card before you press Verify.

  • 16 Oct — Defects can be given to your own crew: on the form, Fixed by → Our crew, then a person or whoever does the defect's trade on the job. It shows on their list when they sign in at the gate and on their own page, where they mark it fixed with a photo. Moving it to Assigned tells the site supervisor; a new automation, off until you turn it on, texts the worker. See Defects.

  • 16 Oct — The "still signed in?" text now opens your own crew's end-of-day sign-off at a job without their PIN, for that one shift, for six hours. If they have already signed out, or the link has run out, the page asks for the PIN as before. At a workshop or office the text's link still asks for the PIN.

  • 16 Oct — The texts that tell your crew where they are tomorrow, or that you put them on a job, now end with a link to their own page (good for three days). Resetting a worker's PIN ends every link already sent.

  • 16 Oct — If you keep tickets for your crew, the site gate now checks them. Every white card on a crew member's record expired stops them until the new expiry is entered on Tickets. A missing card lets them in, and the supervisor is told.

  • 16 Oct — Your crew sign on to your SWMS for the job at the site QR: each Final or Sent SWMS, once per person, and again when a new one is filed. Their sign-ons go on the SWMS register.

  • 16 Oct — Moving between a job and the workshop no longer loses or re-files hours. The site QR asks what the workshop time was for. The workshop QR ends the job's shift as it is, or sends you to that job's sign-off first.

  • 16 Oct — While signed in, crew can add a photo with their own caption, and sign on to today's toolbox talk, from the site QR.

  • 16 Oct — Gate forms have a new 'While on site' timing, and there is a new Toolbox Talk Sign-on starter form, so each worker signs on to the talk from their own phone. A 'not fit for work' answer on a While on site form is handled as it is at the gate: it goes on the shift and the supervisor is told.

  • 16 Oct — 'Refused at the gate' notices now say what to do when it is one of your own crew. Warnings for different crew members on the same job no longer fold into one notice.

  • 16 Oct — Signed in at the workshop or office QR, your crew can report a hazard or incident with photos. Admins and anyone who manages sign-in locations hear straight away, and it is marked dealt with on Sign-in Locations, not on any job's Safety page.

  • 16 Oct — A workshop QR offers the Plant Pre-start Check, once you've added it from the form library, to anyone signed in there. Responses show in Forms with the workshop's name and no job.

  • 16 Oct — The 'still signed in after their usual finish' text, when turned on for the whole business, now covers workshop and office sign-ins too. It names the workshop or office and links straight to its sign-out.

  • 16 Oct — A leading hand can name the crew who worked with them when they sign off. The diary shows those people as 'Leading hand reported' and the work line lists who was there. Nobody is signed out for them and their hours don't change.

  • 16 Oct — Your crew can ask for time off at any sign-in QR with their PIN, without signing in or out. You answer on Timesheets → Leave: approve, or decline with a reason they read. Record leave puts in leave someone phoned in. They see your answer the next time they sign in, and by text if you switch that on. Approved leave records no hours and pays nothing. It keeps them off tomorrow's site list and shows them as on leave on Expected and Site home.

  • 16 Oct — Post a notice to a job's crew from Site home, for example "Gate 2 is shut tomorrow". Your crew read it when they sign in at the gate. Text your crew a site notice also texts it to them, between 7 am and 9 pm, if you switch it on.

  • 16 Oct — When your crew sign in at the gate, they now see the job's notice to the crew, today's goal from the week plan, and the drawings issued for construction. Each drawing opens at its page, read-only.

  • 16 Oct — Clients sign the documents you send them, and answer your RFIs, inside their client portal — signed in or on their own link — under a new 'Waiting on you' card on the job. A client already signed in who opens a signing or RFI email is taken there.

  • 16 Oct — After handover, a job's client can see and log maintenance requests from the job's own page (their emailed link or their portal), with your replies and visit dates under each, once you link a maintenance site to the job. They are not emailed about them unless you give them maintenance access: the request shows how to reach them, and Maintenance tells you when nobody can approve a quote in the portal.

  • 16 Oct — The client portal shows a statement above the claims (billed, received, owing, overdue, under query — GST inclusive) and How to pay with your payment details from Document Lab → Quote settings. Claim emails and payment reminders now carry the same details as Pay to.

  • 16 Oct — Clients now see only the defects they reported in their portal and the ones you choose to show them. Show or hide a defect with the eye on its row on the Defects page, or tick "Show on the client's portal" when you log it. Every defect logged before today is hidden from clients until you show it; defects clients reported in their portal stay on their list.

  • 16 Oct — Clients can add up to five photos when they report a defect in their portal. The photos are filed with the defect and show beside it on both sides.

  • 16 Oct — Walk the defects: a phone-friendly mode on the Defects page. Go room by room, add what you find with a photo, and verify or send back what a trade marked fixed.

  • 16 Oct — Ask your trades for their warranties, O&M manuals, compliance certificates and as-builts on the Handover page, before practical completion too. A trade that has your Base portal uploads them in its new Handover tab, and the head PM is told when something arrives, again if you send one back and they resend it. Each trade on the Handover page shows whether anyone there has your portal, with Share it where nobody does. Emailing the trade is a separate automation, off until you turn it on; for a trade with nobody in your portal, it shares the portal with their main contact. A trade's warranty goes on your warranty register only when you add it.

  • 16 Oct — A purchase order your subcontractor or supplier e-signs in Base is now accepted. It moves to Accepted ("by e-signature", at the time they signed), and a subcontractor's Contract Signed tick on the job turns on. An order keeps the first acceptance recorded on it, so a later email reply saying they accept does not replace the signature. A signed draft is not accepted; whoever sent it for signature is told to issue it. See Signing a document.

  • 16 Oct — In their Base portal, a subcontractor's purchase orders now show the approved variations (number, title, amount and the day approved, not the detail you wrote for your approver) and the original value they add to, when the work is needed, and where it sits on the programme. An order they e-signed says "signed".

  • 16 Oct — Subcontractors can now ask you for a variation on an order they have accepted, sign or query the daywork dockets you approve, and ask you a question (an RFI) from their Base portal. A variation request lands on the order's Variations panel as Pending and on Money → Decide, marked as theirs; nothing on the order moves until you approve it. Their requests show under the order with your answer, below the variations you approved. An RFI goes into the job's register, and every response you record is shown to them. Needs migration 20261238.

  • 16 Oct — Each job in a subcontractor's Base portal has a site page to read before their first day: the address, their days on your programme, working hours, access and parking, their site contact, their SWMS and your site induction. It is there while they are still working on the job.

  • 16 Oct — Your answer to a subcontractor's variation request or RFI now counts in their portal until they read it. Three new emails under Automations → Library, off until you turn them on, also send it to them: their variation request approved, their variation request rejected (with your reason), and the answer to their RFI.

  • 16 Oct — The tender link of the company you award a package to now says Awarded to you, with Open in my portal, instead of "This tender round is closed". In the portal the tender shows the purchase order the award made, with Accept the order. Everyone else in the round still sees it closed. See The tender portal.

  • 16 Oct — A worker stopped at your site sign-in because their company's insurance or WorkCover, or their white card, has expired is now told their office can upload it in the Base portal (under Compliance or Workers), with a button to sign in, when someone at that business already holds your portal. Otherwise they are still told to have the office send it to you. See Site sign-in.

  • 16 Oct — With the Compliance Chaser on, a subcontractor's expiring insurance or ticket is now chased by emailing each person who holds your Base portal for that business their own sign-in link, so the renewal goes up where it does not expire. See Tickets and Licences.

  • 16 Oct — Client portal: clients can ask you a question, suggest two or three times for a site meeting, an inspection or the defects walk, and read your answers under Your questions. You answer, or confirm a time, from What the client sent on the job's Client page, and the head PM is told when they ask.

  • 16 Oct — Three new automations under Automations, off until you turn them on: email the client your answer to their question; tell clients what is new on their job once a day (5pm weekdays, only when something is new); and draft a "How did we go?" email at handover for the head PM to approve and send.

  • 16 Oct — After handover, clients can rate the job out of five from the review link. Reviews stay private and show on the job's Client page.

  • 16 Oct — Comms: a client's portal messages and your answers now show in their conversation as Portal messages; you answer them on the job's Client page.

  • 16 Oct — Share any one document on a job with your client, or keep one back. On the job's Documents tab, More → Share with client puts a programme, a certificate or an O&M manual in their portal, and Hide from client keeps a document out of it everywhere, including a claim's PDF and the handover pack. A CLIENT SEES tag on the row shows what is in their portal right now.

  • 16 Oct — Put selections to your client. On a job's Client page under What they see, add what they need to choose (a tile, a benchtop, tapware), the programme task it holds up, the date you need it by and the options. They choose in their portal: they pick an option, say it in their own words or attach a photo. You confirm their choice or ask them to choose again. Nothing changes on the programme until you confirm, and the price never changes. Once they have chosen, the selection is no longer counted late against them while it waits for you.

  • 16 Oct — Subcontractors can claim line by line in the Base portal. They claim against each line of their purchase orders and the variations you approved, with anything else as other work not on an order, or still as one total. A claim cannot take a line, or an order, past what it is worth after its credits, and a claim you certified for less counts only at what you certified. You see the lines under Certify on the job's Subcontractor claims, with a note of any earlier claims made as one total, and you still certify the total. See The Base portal and Subcontractor claims.

  • 16 Oct — Subcontractors can see the retention you hold. Their portal shows what is held on each job, what has come back, and what comes back at practical completion and at the end of the defects period, with the dates. Retention releases are now labelled as releases, and they no longer count as claimed or certified work on the portal or the claim link. The claim-certified email states retention held to date.

  • 16 Oct — The Project Manager and Site Supervisor presets now include Comms: reading and sending the business's texts and the job's email, including texting crew and subcontractors from Timesheets. People who already have either preset keep what they had until an admin applies it again on Team Modules.

  • 16 Oct — Access presets: Project Manager now also opens Timesheets (Site home, inductions, the site QR poster and approving hours), the Crew roster without pay rates, Forms, Portfolio and Automations (to see, not to install). Builder can raise variations, but not send them to the client or approve them. A new Site Supervisor preset runs the site with no money: it sees subcontractors, orders and daywork without changing them, and cannot approve hours or a subcontractor's daywork, see pay rates, send or approve variations, issue orders or award work. People who already have a preset keep exactly what they have; apply the preset again on Team Modules to give them the new set.

  • 16 Oct — The people on a job's Team page now see that job's money decisions under Decide on the job's Dashboard, and on the job in the phone app. They can approve the ones their own access allows, within their approval limit, without Cashflow. Until now only people with Cashflow could open Decide. Money → Decide and the company figures still need Cashflow. The "finished work unbilled" notice now opens the job's Decide.

  • 16 Oct — Variations has a new Send to client action on Team Modules. Marking a variation Submitted, sending it for signing and e-signing its PDF from Documents now need it, because the client's yes approves the variation. Raising a variation already approved now needs Approve variations and your approval limit, as approving one always has. Anyone whose Variations was on its defaults already has Send to client; anyone narrowed to View and Edit does not, so tick it for them if they should send.

  • 16 Oct — Three more emails to your clients and subcontractors, each off until you turn it on under Automations → Library: a receipt when a subcontractor's payment claim comes in (what they claimed, the day it arrived and when your payment schedule is due by), a "we have your query" to a client who queried a claim (their words back, nothing promised about payment), and a practical-completion email to your client with the PC date and when the defects period ends. The two client emails never share a job with anyone: the button is a way in the client already has (the job in their Base portal, or their own link), so someone you took off the job hears nothing. See The Base portal.

  • 16 Oct — With the practical-completion email on, declaring PC also switches on Handover pack & warranties on that job's client portal — unless someone on your team has switched it off for the job, which is kept. With the email off, declaring PC shares nothing: switch the section on yourself on the job's Client page. See Handover.

  • 16 Oct — New or changed bank details on a supplier or subcontractor — typed by you, by the assistant, or by the business in their portal — now hold payments to them until an admin rings them on a number you already had and confirms it: I've confirmed them by phone under their Bank details, or the new Confirm a payee's new bank details row on Money → Decide. Payment runs list them as held back with the reason. See Payment runs.

  • 16 Oct — The Weekly Client Report now leads with the photo updates you published to the client that week, in your words, and emails each client contact their own portal link. Updates you hid from the client are left out. See Site diary.

  • 16 Oct — Two new texts in the Site supervisor pack, each off until you turn it on: one to someone whose site access request was declined, and one to the person who reported an incident once it is marked dealt with (your note is not in it). See Site home and Safety.

  • 16 Oct — A subcontractor's payment claim that arrives by email can be read for you. Switch on Read subcontractor claims that arrive by email under Automations. The claim then waits on Job Costs → Subcontractor claims with the amount before GST, the period and the PDF filled in. Check it against the PDF and press Record claim. Nothing is recorded until you do, and the head PM and admins are told when one arrives, with the date the answer is due.

  • 16 Oct — A subcontractor claim recorded with a PDF that came by email now counts its response date from the day the email arrived, not the day someone records it.

  • 16 Oct — An emailed claim that looks like one already on the job (the same claim number or period as a claim lodged in the portal or entered by hand) now says Looks like claim #4 on the strip. Press Link to #4 to put the PDF on that claim instead of recording it twice, or Record anyway if it is a different claim. If the emailed copy came first and the claim is not answered yet, linking dates the claim from the email.

  • 16 Oct — A claim a subcontractor emails again is marked re-sent on the strip. Its answer is due from the day the first copy arrived, and nobody is told about it a second time.

  • 16 Oct — One morning brief: the Daily Morning Briefing add-on now adds a Today section to the 7am brief (programme tasks starting, lead follow-ups due, claims with clients, defects past their fix-by date) instead of sending a second, AI-written message.

  • 16 Oct — Head PMs who are not admins now get their own 7am brief: the health of the jobs they head.

  • 16 Oct — The 7am brief's Needs you today now lists what went to each job's head PM since the last brief: margins that dropped, trades that went well over their estimate (at least 10% and $1,000 over, ex GST, at that morning's figure), retention ready to release, and decisions over someone's approval limit that are still waiting, with where each one waits. Its count of decisions waiting on Money → Decide now shows; it never did before.

  • 16 Oct — The account owner (the person who pays for Base) now gets the admins' notices and the 7am brief, even without the admin role.

  • 16 Oct — Fewer assignment notices: when a job's task review or a bulk add gives you several tasks at once, one notice lists them, and programme work handed to you in a batch comes once per job per day. A single task given to you, by a person or by the assistant when someone asks it to, is still told every time.

  • 16 Oct — The retention notice names the job and the amounts (ex GST), says the release claim is waiting for approval on Money → Decide, and opens the job's Handover page.

  • 16 Oct — Jobs in their defects liability period no longer count as active: they are out of Active Projects, Active Contract and the health panel on the dashboard and Projects, and carry a Handover & DLP pill.

  • 16 Oct — Sign-in posters give the right instructions: on site, crew enter their PIN and everyone else taps the button that fits; at the workshop or office, enter your PIN and say which jobs your hours went to when you sign out.

  • 16 Oct — Workshop and office sign-out starts the hours split from your last one there (or from the jobs you ticked done today), so the usual day is one press.

  • 16 Oct — Mark won asks who runs the job. Pick the Head PM from your teams and their team is linked to the job for you. If nobody is in a team yet, it tells you to put people in one on Teams first. The window that follows lists the draft purchase orders Base prepared from the estimate. Winning issues none of them, but if your purchasing policy issues orders by itself, the ones within it are marked and go to the supplier within the hour. It also lists the kick-off tasks it added and any subcontractors already on the job who are not on the site sign-in yet, and offers to switch on the PM agent for the job.

  • 16 Oct — A job gets its kick-off tasks the first time it is won, however it was won (Mark won, the client accepting in the portal, an e-signature or the CRM). Name the head PM is added when nobody runs the job, and ticks itself off when you name one. Book the pre-start meeting is added before the job starts, but not for a job won straight to In progress. Each comes once per job, and a job coming back from hold gets none. The job's guide, Where this job is up to, has a new Name the head PM step.

  • 16 Oct — Engaging a subcontractor on a won job can now ask them for their SWMS, insurance and WorkCover and put them on the site sign-in in the same step. It is ticked in the Engage form; untick it to do it later. Each subcontractor's card shows their subcontract (their purchase order) or drafts one for you, and a draft commits nothing until you issue it.

  • 16 Oct — Your client's portal shows Your contact: the job's head PM, with a phone number and email they can tap. With no head PM it shows your office phone. The welcome email sent when a job is won (if you have switched it on) now gives the planned start date, their contact and what happens next. Turn the contact off for a job with Your contact on the Client page.

  • 16 Oct — Every business now gets a programme check at 6:15am on weekdays, in its own time zone, whether or not the PM Agent is on. The head PM hears when a programme task runs late (and so does the person it is assigned to), when a subcontracted trade comes inside its booking window with nobody booked, when a job's handover buffer goes amber or red, and when a client selection is past its need-by date. Late items are told in their first few days and once more a week on, not every morning, and each notice can be paused on Automations. Installing a Programme watch recipe takes that alert over on the jobs it covers; on a day the recipe would stay quiet, the built-in notice still speaks.

  • 16 Oct — More things now reach a person: your task going overdue (once, the first morning, unless your business's chase already asks you), a high or urgent task of yours due today, a defect marked fixed (to the site supervisor, to check and verify), being added to a job's team (with your role), and a handover pack ready to send (to the head PM, unless they made it).

  • 16 Oct — Create someone from a job's Crew & Timesheets and their PIN text now names the job, its address and your site start time.

  • 16 Oct — Two new texts for your own crew, each off until you switch it on under Timesheets → Automations: Text your crew where they are tomorrow (each working afternoon: the job, address, start time and their tasks, one text even if they are on two jobs) and Text a worker when you put them on a job (the job, address and start time; never between 9 pm and 7 am).

  • 16 Oct — When everyone has signed a document, Base emails the signed PDF to every signer, and a copy your client signed appears in their portal under Your documents, marked Signed, in place of the unsigned one. When you countersign a document your client already signed, the copy with both signatures goes to them and takes the place of theirs on the portal. If the signed copy cannot be emailed, your inbox tells you why. A building contract your client signs fills in the job's contract signed date if none is recorded.

  • 16 Oct — Subcontractors can price your tenders inside the Base portal. Price this tender under each builder's Tenders opens the tender there. Their company details come from Your business and reach you in one press, and certificates attach from Documents without uploading again. The tender page your invitation links to now has Open in my portal, which shares the portal with the address the tender went to. A tender priced either way is the same submission on your Tenders page.

  • 16 Oct — Subcontractors have three new pages in the Base portal, under Yours. Your business keeps their details once (ABN, trades, licences, contact and bank details) and sends them to any builder they work for, showing what each builder's record has that differs. Documents holds their insurance, WorkCover, licences and tickets: they upload a certificate once and share it with each builder, and it lands on that builder's compliance register. Calendar shows their bookings with every builder in one place, and they can add jobs that don't come through Base. When a subcontractor sends you new bank details, the change is recorded and your admins are told; call them to confirm before paying into a new account.

  • 16 Oct — The Base portal has a new look, in line with the rest of Base: each builder a subcontractor works for is listed down the side with what needs them, and a builder's page has tabs, starting with an overview of what needs doing. A new Tenders tab lists every tender that builder sent them, with Price this tender straight into the tender page. The pages your emailed links open (tenders, compliance and claims, RFIs, signing, forms, booking confirmations) share the look, with a Your Base portal button.

  • 16 Oct — Your clients and subcontractors can sign in to the Base portal with Google or Microsoft in one click, or with a password they set on the portal's new Account page, as well as with an emailed code. All three reach the same portal for the same email address. The builder sign-in page now links to the portal sign-in for them.

  • 16 Oct — In the Base Management phone app, Capture puts a site photo where it belongs in one go. Take the photo, choose Progress (it goes on today's site diary, with your note as its caption) or Defect (it is logged on the job's defects with the photo as the before shot), and save. Open it from Site photo or Log a defect on Today, or from Capture on a won job. On a won job the app now opens with Capture, the diary (and whether today's is started) and open defects at the top, then the programme: how far through it is, what is on now, what is next and what has run late. Today also lists what is waiting on you beside Decide: bills and shifts to approve, overdue claims, tickets and subcontractor certificates to renew, and drafts to approve. Ask Base has moved to the middle of the tab bar, between Projects and Inbox, where either thumb reaches it.

  • 16 Oct — The Base portal. Your clients and subcontractors sign in once, with their email address and a code Base emails them, and see everything every builder on Base shares with them, each builder kept separate. Share a job with a client from Client → What they see → Base portal. Give a subcontractor their portal from their page under Contacts, on the Subcontractor tab. See The Base portal.

  • 16 Oct — In the Base portal a subcontractor sees, for each builder, their jobs, purchase orders to accept, payment claims (they can lodge one and see the date you must answer by), payments, defects to mark fixed with a photo, bookings to confirm, their workers and tickets, and their insurance, WorkCover and SWMS to upload. A defect they mark fixed comes back to you to check; Base never closes it for you.

  • 16 Oct — Awarding a trade, and issuing a purchase order to a subcontractor, now share the Base portal with the address the email goes to. The purchase order email has Accept in your Base portal; replying to the email to accept still works.

  • 16 Oct — Inviting someone as a Client from the Teams page now shares the jobs in their Base portal. They no longer join your business or take a seat, and a client another builder already invited is no longer refused.

  • 16 Oct — Six new emails to your subcontractors and clients, each off until you turn it on under Automations → Library: a defect put on them, insurance running out, insurance expired, a claim certified, a booking to confirm, and a welcome to the portal when a job is won.

  • 16 Oct — A client signing in to the portal could be sent to the subscription page. The portal never asks your clients or subcontractors to subscribe.

  • 16 Oct — A won job now moves to In progress by itself: on the first day someone signs in on its site, or on the day its first site work starts on the programme. Until now it stayed at Pre-construction until someone changed it. The daily programme checks, the site look-ahead, the PM's check-ins and the morning brief also cover Pre-construction jobs now; before, a job was invisible to them until it was In progress.

  • 16 Oct — The job's header shows where the job is up to in delivery, beside its status: Setting up once it is won, Ready for site, On site, and Handover & DLP once practical completion is declared.

  • 16 Oct — Pre-construction jobs count as active on the dashboard (the Active Projects count, Active Contract and the health panel) and on Projects. Pre-construction has its own pipeline cell and filter.

  • 16 Oct — When a job's practical completion milestone passes, or all its site work is ticked done, the head PM and admins are told that practical completion is due, with a link to Handover. When it is declared, the head PM and admins are told.

  • 16 Oct — New notifications, on for every business: a subcontractor claim has come in; a subcontractor claim needs your answer within two working days (after its response date the full amount claimed becomes payable); a client has queried a claim; a client has reported a defect; a subcontractor has uploaded compliance documents; someone has asked for access to a site; an RFI is 1, 7 or 14 days overdue; an RFI has been answered; a defect has been given to you; the office has approved a variation (this one goes to the site supervisor); and a site photo where the safety check saw missing protective equipment.

  • 16 Oct — Each notification now opens the page it is about, for example the job's costs, defects, variations, handover or programme, not just the notifications list. Notices that used to arrive many times a day now arrive once: a sign-in warning once per company per job per day, and a recorded cost once per job per day.

  • 16 Oct — The "job in progress with no head PM" notice now names the job, goes to the admins and does not arrive when the job already has a head PM. Before, it arrived every time with the job's id and no name. A blocked or delayed task on a job with no head PM now goes to the admins.

  • 16 Oct — The 7am brief admins get now ends with Needs you today: client claims overdue and how much is owed, subcontractor claims waiting on your answer, live jobs with no head PM, and decisions waiting on Money → Decide.

  • 16 Oct — New automation, off until you turn it on: Draft the programme when a job is won. When a job is won and has no programme, the assistant drafts one from the estimate for the PM to check. A job that already has a programme is left alone.

  • 16 Oct — Connecting Gmail no longer turns on the automations that use the assistant. It adds the standard notifications every business gets; anything that runs the assistant stays off until you turn it on.

  • 16 Oct — Keep Xero purchase orders in step is now in the Automations Library, off until you turn it on. With it on, an approved variation updates the purchase order in Xero, and you are told when Xero has already billed the order.

  • 16 Oct — When the Terms of Service or the Privacy Statement change, everyone is now emailed a list of the sections that changed. The next time you open Base it asks you to read what changed and accept. You can choose Remind me later for 14 days. After that, Base asks you to accept before you carry on. If you don't agree, Billing stays open so you can cancel.

  • 16 Oct — The Terms of Service now say that each subscription is for one business (section 3.4). If you estimate, quote or manage projects for other businesses, for example as a freelance estimator, each business you work for needs its own subscription, with its work kept in its own organisation. That keeps one business's prices and rates out of another's estimates. A business's own team, clients, subcontractors and consultants still join through invites and portals as before.

  • 16 Oct — When the assistant moves a chat to another mode, for example from general chat to the takeoff estimator, it now carries straight on with your request in the new mode. Before, it stopped after the switch and you had to send the request again. If it ends by asking you something, your answer is what carries it on.

  • 16 Oct — The workshop QR now shows each joiner the work in the workshop: units released and in production, their own first, and the manufacture on the programme for their trade. When they sign out they tap what got done (Machining done, Assembly done, QA passed…), and the unit moves to its next stage straight away. The hours split then starts on those jobs. A unit still needs an approved drawing before machining, as on the Manufacturing page.

  • 15 Oct — The CRM now keeps time. Every card says how many days the lead has been in its stage, counted from the move rather than the last edit; past the stage's limit (two days at Enquiry, ten at Quote Submitted) the chip turns red and the card rises to the top of its column, and the Leads list gains an In stage column. Enquiries nobody has answered sit in a red rail above the board with how long they have waited and a Called them button; the first call, email, text, visit or quote recorded on a lead answers it. The strip's Avg deal gives way to First response, the median time to answer over the last 30 days. Leads can now be marked as coming from the website, a phone call or social media.

  • 15 Oct — A job's contract sum now follows its estimate until the job is won. Once the estimate has approved lines, the job's value on the project page becomes their sell (ex GST) and keeps up with every line, margin and approval change, with each move kept in the contract sum history. A won job's figure stays the price the client agreed.

  • 15 Oct — A lead linked to a job now follows the job's price. Linking sets the lead's value to the approved estimate's sell, and every quote sent updates it to the price quoted, with a line on the lead's timeline each time. Won and lost leads keep their figures.

  • 15 Oct — The CRM pipeline fits six columns on a wide screen and, on a narrower one, says how many columns are off to the right and scrolls to them. Moving a card offers Undo for a few seconds; dropping one on Won asks whether to create the project. The Won column shows the last 90 days, with every win on Leads. A new business sees a short start panel instead of six empty columns, and the figures above the board show a dash rather than $0 and a 0% win rate until there is something to count. Leads on hold are no longer counted in the open pipeline, and follow-ups are due on your organisation's day.

  • 15 Oct — Subcontractors can confirm a booking with one tap. Remind on Expected now sends a link to a confirmation page listing their work that week. Yes books them as confirmed. We can't make it marks the booking declined and tells the job's head PM straight away. A new Site supervisor automation, off until you switch it on, texts the link to every company due on site within two working days that has not confirmed. Turn it on from Automations → Recommended here on Timesheets.

  • 15 Oct — Base now looks ahead on site. Every working afternoon it checks each live job's programme for the next working day and the two weeks after. The job's head PM gets one notice: who is on site tomorrow, who has not confirmed, and what nobody is down to do. Work with nobody to do it goes on one task per job, Assign people to the site work coming up, which ticks itself off as trades get someone. On Timesheets → Expected, that work shows in red with Assign, to pick the subcontractor or your own crew in one go.

  • 15 Oct — Awarding a tender or engaging a subcontractor now puts the company on the programme tasks of their trade that nobody holds yet. Before, the programme never knew which company did a task, so the booking follow-up and the site sign-in had nobody to ask. Work you planned to do yourself, milestones and tasks already given to someone are left alone. With two companies of one trade on a job, you choose.

  • 15 Oct — Base now tells site work apart from everything else on the programme. The site sign-in, Expected on Timesheets, the diary's On the programme today and the Assign subcontractors and crew step now leave out orders, deliveries, shop drawings, workshop manufacture, milestones and the council's or client's tasks.

  • 15 Oct — A new end-of-day sign-off on the site sign-in page, for your crew and now for subcontractors' workers too. It lists each person's work on the job for their trade (programme tasks and their company's purchase orders). They tap Done or Part done, add a photo, and say anything else with Say it instead, which turns a voice note into text. With nothing to add they answer Nothing to report today or My leading hand is reporting for us, and the answer is kept. It never stops anyone signing out. After signing in, each person also sees Your work on this job: what is left, what is due and what is overdue. Request access now asks for the new worker's trade.

  • 15 Oct — The site diary shows who reported at sign-off and who did not. A short AI write-up of each sign-off becomes that person's work line, and their own words are kept. Under Progress reported on site, Mark on programme sets a ticked task complete (or in progress) and Not right takes it off the list. Nothing on the programme moves until someone does.

  • 15 Oct — Certifying a subcontractor claim shows the Site evidence for the claim period: the days their workers were on site, person-days and hours, what they ticked done at sign-off, their words and their photos.

  • 15 Oct — New automation in the Site supervisor pack, off until you switch it on: Text people still signed in after their usual finish. One text, 45 minutes after their usual finish and never after 9 pm, with a link straight to their sign-off. Turn it on from Automations → Recommended here on Timesheets for every job, or on a job's Site Diary for that job alone. It switches on just that text, not the rest of the pack.

  • 15 Oct — Crew members and subcontractors now need a trade when you add them, picked from one list (with Other… for anything else). On Crew the old Role is now Job title. Timesheets shows who is still missing a trade, with Set them now to fill them all in at once, and Crew marks them No trade. The site sign-in uses the trade to show each person their work.

  • 15 Oct — After a job is won, the project guide has a new step, Assign subcontractors and crew. It checks that every trade with programme work in the next three weeks has someone engaged or assigned, and that everyone on the job has a trade. The Mark won summary's Next list starts with the same link. The old Engage the trades step is now called Issue the purchase orders.

  • 15 Oct — The site diary has a new look and uses the whole screen: the week at a glance at the top, a photo strip on every day with a full-screen viewer, and each person's sign-in and sign-out times with a bar across the day. Summarise day and Summarise week write an AI summary beside the record (never in it, and never on the PDF), marked out of date when the day changes. PDF now opens the document on the page instead of a blank tab, and printing a day that has not changed shows the copy already in Documents rather than filing another. Days get their weather even when the job has no map location set.

  • 15 Oct — New Comms module on Team Modules: the business's texts, the emails filed to jobs, the Comms hub, and texting or emailing from the business number and address. It is off for every teammate until an admin switches it on, so after this update only admins and the owner see them. Everyone's own connected mailbox stays theirs. A text or email that comes in about a job is handled for someone with Comms: the job's head PM if they have it, otherwise the owner or an admin, and the summary and suggested reply go to them.

  • 15 Oct — Every module is now enforced everywhere: pages, the actions behind them, and the assistant. A teammate without a module sees a plain "not switched on" note instead of its page, tab or figures. The project page shows claims, purchase orders and costs only to people with those modules. Changing an estimate, a project or a contact needs that area's Edit. Automations a teammate set up on money events stop when they lose the money module. The account owner counts as an admin everywhere.

  • 15 Oct — A teammate who is not an admin can only invite someone with access they have themselves, on the Teams page and through the assistant. Admins' invites are unchanged.

  • 15 Oct — Approving a work-order variation on Money → Decide needs Job Costs → Approve, and giving a Xero document a job needs Job Costs → Edit as well as Xero sync. Before, someone with only the purchase-order or Xero switch could decide them.

  • 15 Oct — The company's overheads from Xero and the list of Xero jobs need the Cashflow module, like the rest of Xero. Without it, the New Project form says so and the job is added to Xero on its first claim, bill or order.

  • 15 Oct — Questions and warnings now open in Base's own dialog, everywhere, in place of the browser's grey "localhost says" box. Deleting or removing something shows a red button that names what it does, and Cancel is selected first, so a stray Enter keeps your work. Esc or a click outside cancels.

  • 15 Oct — Team Modules is easier to work through: one tab per area of Base (with how many modules are on in each), and the assistant on its own tab. Every module now says what it is, its actions show once it is on, and All on / All off set a whole tab. Presets show what they give and ask before replacing someone's ticks. How this works at the top opens a full explanation, and the assistant gives the same explanation when you ask it how access works.

  • 15 Oct — Every task now belongs to an area of the job: Estimate, Scope, Tenders, Drawings & RFIs, Contracts & documents, Variations, Programme, Subcontractors, Purchase orders, Site, Defects & handover, Money and Comms. On Tasks, Group by → Area of the job sorts the list that way; on a job's Tasks page the board columns can group by area too, and each area's name opens that page of the job.

  • 15 Oct — The job's task review now reads the whole job before it plans: where the job is up to, and for every area what should be done by now and what is missing or late — tenders waiting on replies, trades starting soon with nobody engaged, an unlocked schedule of values, RFIs past their answer date, claims due. Every task it adds has a due date and its area. It plans nothing for an area the job is not ready for.

  • 15 Oct — My submissions, under Pay in the side menu: everything you handed in for an admin to approve and where each one stands — waiting, approved and done, rejected (with the reason) or expired. You also get a notification when an admin decides one, and the assistant can tell you ("has my invoice been approved?").

  • 15 Oct — Teammates without Claims & Invoices can ask the assistant to draft a progress claim. It goes to an admin on Money → Decide; approving drafts it on the job's Invoicing tab for someone who can send it.

  • 14 Oct — Admins can now make each team's tasks private to that team, under Settings → Tasks → Who sees what. A task in a team is then seen by the team, the person it is given to, whoever made or follows it, and admins; a task with no team is still seen by everyone. Files attached to a task are not made private. Off unless you turn it on.

  • 14 Oct — Portfolio has its own switch in Team Modules. Everyone who could see the programme keeps it.

  • 14 Oct — The assistant can now build and save task templates with you ("save our new-starter steps as a template"), list them and delete them. Only an admin, or the lead or backup of the template's team, can save or delete one.

  • 14 Oct — Handing over your work, or starting a template, now tells each person once, with how many tasks are theirs, instead of once per task.

  • 14 Oct — Needs you on Tasks also counts subbies' insurance and workcover certificates that have expired or expire within 30 days, for subbies working on a live job.

  • 14 Oct — A task someone else changes now updates on Tasks where it is, without the page reloading.

  • 14 Oct — Tasks is now one screen for everything you have to do: work on a job, follow-ups on a lead, and the business's own work that belongs to no job, such as renewals, the BAS or onboarding a new starter. Chips switch between All, Operations (anything not on a job) and Projects. It opens on your work, with My teams and Everyone a press away. Work nobody owns yet in your teams and on your jobs is under Up for grabs: press Claim to take it. Add a task in one line (#team @person !priority, a date, every month), start a set of tasks from a template, plan your week by dragging tasks onto days, and hand your work over when you are away. Me now means tasks assigned to you; a task nobody owns is no longer counted as yours.

  • 14 Oct — Every task opens the same panel, on Tasks and on a job's Tasks page. Give a task a team, the day it is planned for, a repeat, a checklist, sub-tasks, files it needs before it can close, and followers, and comment with @name to bring someone in (they are told).

  • 14 Oct — Needs you, at the top of Tasks, counts what is waiting on you elsewhere: bills and money decisions to approve, timesheets, overdue claims, tickets expiring soon and drafts to approve. Each links to its page, and you only see the ones you can act on.

  • 14 Oct — The cross-job programme timeline moved from Tasks to its own page, Portfolio, in the Delivery workspace.

  • 14 Oct — New Settings → Tasks for admins: turn on chasing for overdue tasks (off unless you turn it on), choose who leads and backs up each team, and add the suggested teams and the starter templates (onboarding, offboarding, a new vehicle, a new subcontractor).

  • 14 Oct — Each team has its own page: its open and overdue work and what is up for grabs, and for its lead, backup and admins, everyone's load and the weekly scorecard.

  • 14 Oct — In the phone app, Tasks has the same All, Operations and Projects chips, and Mine means tasks assigned to you.

  • 14 Oct — Handing a task to someone on Tasks now tells them in their notifications, as it already did from the chat. When someone else finishes or dismisses a task you made or are watching, you are told too.

  • 14 Oct — Maintenance: a back-charge notice is now emailed to the subcontractor and recorded only once it has gone. Before, it was recorded as sent when nothing was. A notice you served yourself is recorded with the day you served it. On the shops map, pinch with two fingers to zoom, and press 1 for street level.

  • 14 Oct — Maintenance: moving a shop to another client now takes its open requests with it, so the previous client's logins stop seeing them. A client reopening a request no longer takes back "ready to invoice". Clients see your team by name, never by email address. Changing a shop's pre-approved limit is recorded with who changed it and when. A call-out without a quote can only be confirmed on an emergency.

  • 14 Oct — Automatic runs on a job now report to the job's head PM, when it has one, instead of whoever turned the automation on, so each job's briefs reach the person running it. In chat you can also hand a company task (one with no job) to the assistant, as you could a job's task. A lead follow-up still goes to a person.

  • 14 Oct — You are now told in your notifications when someone creates a task for you, and when the assistant hands you a task or mentions you in a note on one.

  • 14 Oct — The task review never changes or closes a task you made or have worked on. It leaves its suggestion as a note on the task instead. A task it added that you dismissed is not added again for a month, and it posts to the job's inbox only when it changed something.

  • 14 Oct — The PM Agent now turns on for one job at a time. Turn on on a job's Tasks page switches it on for that job only, together with its task review. Before, it switched on for every active job in your business. A job's task review is its automation switch: off stops the PM Agent and the event-driven reviews on that job too. Your plan sets how many jobs can have automation on at once: Trade and Estimator 3, Builder 5, Automater 10. The task review runs at most once a day, so one set to run every few hours now runs daily.

  • 14 Oct — The PM Agent's plan for the week now puts the job's existing tasks on the days they will be done instead of adding a copy of each one, and their due dates stay as they were. Rebuilding the week no longer leaves the old week's tasks behind to go overdue. A task the old week added that nobody touched is dismissed, and any other task stays on the list without a day.

  • 14 Oct — A task Base raises about a claim, RFI, defect, variation, drawing revision or lead is now the one task about it. If the same thing comes up again, that task is updated instead of a second one appearing. It also closes itself when the thing is settled: the claim is paid, the RFI is answered, the defect is closed, the variation is approved or rejected, or the revision is reviewed. Before, a chase about a paid claim stayed open until someone ticked it.

  • 14 Oct — Every open maintenance request is now a task in Tasks, for the crew member assigned to it (on the job when the shop is linked to one). It moves along with the request and closes itself when the request is done, rejected or turned into a job. When a request has less than a day left to respond or to fix, the crew member and the job's head PM (or your admins) are told, and again if the deadline passes.

  • 14 Oct — Teammates without a money module can still hand in money work. A supplier invoice, a cost or a receipt they give the assistant, record from Documents or add from Receipts, and receipts they send to Xero, go to Money → Decide for an admin to approve instead of being refused, and admins are told straight away. Approving records the bill and approves it as you, and it goes to Xero with the next sync. A bill recorded by someone who can't approve bills now also lands on Decide, instead of waiting on Job Costs where nobody was told.

  • 14 Oct — New on Settings → Integrations: File email to jobs automatically (on by default). Turn it off and Base only suggests the job for an email in someone's connected mailbox; the person whose mailbox it is confirms it on Comms.

  • 14 Oct — The assistant can read and file your receipts in chat. Its receipt tools could not see anyone's receipts, so it said none were there.

  • 14 Oct — The assistant now follows Team Modules for money. A teammate without Cashflow can no longer ask it for your Xero figures (profit and loss, balance sheet, bank balances, who owes you and who you owe) or have it push to Xero, and the same goes for Job Costs and Invoices. Before, it would do these for anyone on the team. Admins are not affected. Tick the module under Settings → Team Modules for anyone who needs it.

  • 14 Oct — Moving a document off the Xero holding job, exporting receipts to Xero and setting a new job up in Xero now need Cashflow → Xero sync, like every other push to Xero. Without it, a new job is added to Xero the first time someone who has it pushes.

  • 14 Oct — A project's cost summary, its schedule of values, the margin panel on Cashflow, the Lessons learned panel and the bank lines now need the matching money module, as the rest of those pages already did.

  • 14 Oct — Each person's connected Gmail, Outlook and Google Calendar is now theirs alone. Automations that nobody in particular set up, and replies to messages from outside the company, no longer search, read or send from anyone's personal mailbox or calendar; automatic replies go from Base. The Automations activity list no longer shows the sender or subject of a teammate's email.

  • 14 Oct — Through the assistant, only the person who set up an automation, or an admin, can change what it does or who it tells. Anyone can still pause one.

  • 14 Oct — When your Scope of Works, BOQ, purchase order, progress claim or SWMS template has a field the job's records cannot fill, such as the project overview, the assistant can now fill it in and produce the document. Before, it was asked for those details and then refused them, and could try several times without producing anything.

  • 14 Oct — The assistant's replies no longer show stray lines of code like string="true"> or a block of raw data after it starts a task. That text was part of how the assistant calls its tools and was never meant to be seen.

  • 14 Oct — An estimate built from your plans now always goes to the assistant's take-off workers, even when you ask for a single trade such as electrical only. Before, a job with three trades or fewer could be read in the chat itself, which gave a less careful count.

  • 14 Oct — An estimate can now carry a discount: money off the price you agreed with the client. Add one from Add line → Discount, or tick discount on a line. It comes off the quote and the contract sum, carries no cost and no margin, and never becomes a budget line, so the job's margin shows what the discount really cost you. A spreadsheet import tags each negative row as a discount or a cost saving for you to confirm.

  • 14 Oct — Estimates the assistant builds from your plans now arrive with their boxes on the drawings. The symbols it reads on a sheet are put on the matching lines, any line still without a box is found on the drawing automatically, and a line that has nothing to box says why. Before, a whole estimate could arrive with every line on a drawing and none boxed, so there was nothing to check a count against.

  • 14 Oct — On Drawings & RFIs, Accept all records every answer read from a reply in one go, after you have checked them. And when your business sends email from your own Gmail or Outlook, a reply to RFIs you sent that comes back to your mailbox is now read for answers too; before, it only appeared in Comms.

  • 13 Oct — Team Modules has a Tasks area of its own. Editing tasks used to come with editing projects; now it is its own tick, so you can let someone work their tasks without editing the project. Everyone keeps exactly what they could do before: whoever could edit projects can edit tasks, and whoever was limited to viewing projects is limited to viewing tasks.

  • 13 Oct — Creating a project from the New Project form no longer switches on the AI task review by itself. Base offers it once the job's estimate is finished, as it already did when you created a project from the chat, or you can turn it on from the job's Tasks page.

  • 13 Oct — A note added to a task from My Tasks now saves. It failed with an error every time before.

  • 13 Oct — A job's dashboard lists its most urgent tasks first. They used to come last, and on a busy job an urgent task could drop off the list.

  • 13 Oct — An address with New South Wales written out in full is now read as NSW, not as Wales, for security-of-payment response dates, statutory levies and compliance checks. An address in another country, such as New Zealand, is no longer read as an Australian state.

  • 13 Oct — The offer to turn on the PM Agent now says plainly that it switches on for every active job in your business, not only the job you are looking at.

  • 13 Oct — New Maintenance page under Build, and a Maintenance tab on the client portal. Your clients log maintenance, defects, warranty claims, small works and emergencies against their shops, approve your quotes and confirm when the work is fixed. You get one queue across every client with response and fix-by clocks (paused while a quote waits on the client), coverage (chargeable, DLP defect, warranty or call-out), quotes, visits, back-charge notices to subbies, a map of every shop, and a reminder to walk a shop before its defects period ends. A quote under a shop's pre-approved limit goes ahead without waiting.

  • 13 Oct — Send RFIs for an answer. On Drawings & RFIs, tick the RFIs and press Send for answers: each person gets one email (and a text, if you like) with a link to a page listing their questions, where they type each answer and attach marked-up drawings. Answers land on the RFIs as responses and you are notified. If they reply to the email or text instead, the reply (and any PDF on it) is read and each answer waits on the RFIs tab for you to accept. Remind chases what is still open under the original email. Sending a single RFI from the plan check now uses the same page; before, replies to it were not recorded anywhere.

  • 13 Oct — When your jobs are tagged in Xero under a category Base did not take for jobs, such as Location, the From Xero, not yet on a job card on the Money page now says so and lets you choose it in one click. Base then files everything Xero tags to those jobs by itself. A document on the holding job also moves to its job on its own once someone codes it in Xero.

  • 13 Oct — A labour rate you give the assistant ("our carpenters are $80 an hour") is now saved to your Labour rates. Since late July it could not save one from the chat, and could say it had. If a rate cannot be saved, the assistant now says so.

  • 13 Oct — The assistant no longer counts a section of your estimate more than once. A section proposed again, or added in parts, could appear several times in its running total, so it could tell you a job was worth several times its lines and then add the section again to fix it.

  • 13 Oct — Quotes, purchase orders and other documents the assistant makes now always produce their PDF. Some came back saved as a draft with no PDF and a message about a token.

  • 13 Oct — When your organisation has the assistant's direct email sending off, an email it was about to send now appears as a draft for you to check and Approve & send, instead of an error.

  • 13 Oct — Lines the assistant adds for a built item with labour in its bill of materials now save. Some were refused with a message about a missing column, and a whole batch was lost with them.

  • 13 Oct — Describing a job's type in words ("dental clinic fit-out") no longer stops the assistant creating or updating the project. It stores the type that fits and tells you which.

  • 13 Oct — The assistant can read a spreadsheet tab whose name ends in a space, such as a tender's "WORKSHEET " tab.

  • 13 Oct — Drawings & RFIs now opens on Revisions, with RFIs next and the Sheets register last, in the same style of tabs as the inspection page. A tab's count turns amber when something there is waiting on you. Every set received on the job is listed on Revisions instead of folded away. A drawing set uploaded while another scan of the same job was running could be filed twice, so each sheet showed two rows; new uploads no longer do.

  • 13 Oct — On the Scope page, a trade's redraft box no longer shows a copy of the conversation. Ask for a redraft there as before; Base's reply is in the chat, with its tables and formatting, behind Open thread. The box says when Base is working on that trade and when it last replied. The page also shows its layout while it loads instead of a line of text.

  • 13 Oct — Orders that ended up on no budget line, for example sent straight from the Issue screen or raised before the budget existed, are now placed on their line within the hour when Base can tell which it is, and the bills on them follow. Anything Base cannot place is named on the Money page. A job whose estimate gains a variation or contingency line before its budget is built now still gets its budget, and a line priced through its total no longer seeds at $0.

  • 13 Oct — An order whose trade is named differently from the budget now finds its budget line: "Mechanical / HVAC" goes on Mechanical Services, "Plumbing" on Hydraulic Services, "Ceilings" on Plasterboard. Base links it only when exactly one line fits, and leaves anything less clear for you to place.

  • 13 Oct — A job won with an estimate that has quantities but no prices now shows No budget yet on the Money page, WIP and the job's profit and loss, even once orders are placed against it, instead of a margin worked out from the orders alone. The head PM, or an admin, is told once to enter the budget.

  • 13 Oct — Hours worked on a job and not yet approved now show on Job Costs as Provisional labour, priced at each person's rate. They count in the job's forecast and margin, never in its actual cost, until a person approves them. Everyone who can approve timesheets also gets a reminder every Monday morning while hours wait, and the Money page lists the waiting timesheets.

  • 13 Oct — Bringing your Xero history in no longer gets stuck if it is interrupted part-way. It starts again on its own, and after three stops the Xero page says which step it stopped at. An import stuck since 7 October restarts by itself.

  • 12 Oct — Overhead recovery can now come from your overhead budget. On Settings → Finance, enter the direct cost you expect next year and Use the budget figure divides your planned overheads by it. Build it with Base opens the chat in the new Overhead budget mode, which takes you through each category, saves the lines on Cashflow → Business Overheads and works out the rate with you.

  • 12 Oct — On Settings → Finance, Pull from Xero works out your overhead recovery from your profit and loss in Xero for the last twelve months. It lists every account and how it counts, lets you correct any that are counted wrongly (such as subcontractors coded to an expense account), and Use Xero's figure makes it the rate that every estimate's net margin uses.

  • 9 Oct — When the assistant needs a quick answer from you (yes or no, which job, which option, a date), it now asks with buttons you click instead of a question you have to type a reply to. You can still type your own answer.

  • 9 Oct — Receipts now uses the full width of the page: the scan history, the totals, the excluded companies and the receipts table no longer stop short on a wide screen.

  • 9 Oct — Ask the assistant how to do something and it now answers from this guide, with its steps and a link to the page, then offers to take you there. It used to describe the screens from memory and could name a button that does not exist.

  • 9 Oct — The audit panel has an Ask Base about this figure button that takes the figure, its working and what is in it into the chat, so you can work through it with the assistant. Under Questions about this it suggests questions that fit the figure, such as how to change the contract sum, create a variation, log a bill or add a receipt. Click one to ask it; where this guide has the steps, the answer gives them and links the page.

  • 9 Oct — In a takeoff mode the chat has a Fast button beside the mode pill. It reads that chat's plans on a faster lane at about 1.8 times the cost per plan read, and asks you to accept the cost before it turns on. Needs the Builder or Automater plan.

  • 9 Oct — A job's contract sum now locks when the job is won, like the estimate. Raise a variation for a price change. If the figure was entered wrongly, correct it on Job Costs with a reason, which needs the Unlock a won estimate permission. Every change is recorded, and Alt+click on the Contract Sum shows where it came from.

  • 9 Oct — Money screens now date things by your own day, not the UTC one. Before 10 am a new claim's issue date, today's bills and overdue claims, the Cashflow forecast and the reports were a day behind. On the 1st, Draft last month reached back two months. The audit working paper shows when a figure was worked out in your own time.

  • 9 Oct — Ask the assistant how any money figure is worked out — a job's margin, a Job Costs line, a claim, a month of the forecast, a report total — and it answers from the same working the audit panel shows, with a link that opens it.

  • 9 Oct — On Reports, Alt+click any summary tile (or press Audit) to see the rows of the report behind it — every claim, bill, GST transaction or payee — or the tiles it is built from, for all ten reports.

  • 9 Oct — On the Cashflow Forecast, Alt+click any amount in a month, or a tile, to see every claim, bill, order, engagement, overhead and retention release that lands in it, each with the date that put it there, and how the net and the balance are built.

  • 9 Oct — Alt+click a figure on the schedule of values to see each claim that billed against a line, and on Handover to see how retention held, released and outstanding are worked out, claim by claim.

  • 9 Oct — On a job's Invoicing tab and on Claims & Invoices, Alt+click any amount (or press Audit) to see how it is worked out: each total claim by claim, a claim's total from its work value, retention and GST, its line items, what is still owed and when it fell due, and what is left to claim against the contract.

  • 9 Oct — On WIP & Margin, Alt+click any figure (or press Audit) to see how it is worked out: each job's % done line by line, its over or under billing claim by claim against the work earned, its margin and its margin at the last month close, the totals job by job, and each month-end journal's lines as posted.

  • 9 Oct — On Job Costs, Alt+click any figure (or press Audit) to see how it is worked out: a line's budget and every transfer that moved it, the orders and bills behind Committed and Actual, what each order has left to bill, the estimate lines not yet ordered, how the forecast and variance are built, and the totals, margin, accrued, paid and due figures line by line or bill by bill.

  • 9 Oct — The audit panel now covers the Money page's headline figures (free after obligations, owed to you, you owe, GST to set aside, runway, profit to date) and each job's cost, and links the documents behind a number: the claim or variation PDF and its signed copy, a bill or receipt filed with it, a subcontractor's claim, or the bill in Xero. The working paper pastes as numbers you can add up, includes every breakdown, and checks each total.

  • 9 Oct — See how a figure is worked out. On the Money page, Alt+click (Option+click on a Mac) a job's margin to open the audit panel: the formula with your numbers in it, every input with a link to where it came from, the accounting basis, and a working paper you can copy into a spreadsheet. Press Audit (or Alt+A) to make figures clickable without Alt. More figures across the money pages follow.

  • 9 Oct — Jobs you have won but not started (pre-construction) now count on the WIP report, the month-end WIP journal, month close and the weekly margin snapshots, as they already did on the Money page. A job with a deposit or claim sent before work starts was missing from WIP. A job with nothing on it shows at nothing and asks for no month close until money moves on it.

  • 8 Oct — A lead started from a job (from the project guide) now takes the estimate's price as its value when no contract sum is set. It used to take the estimate's cost, including excluded lines, so the pipeline showed the job below what you quoted.

  • 8 Oct — Base Connect, for clients planning a fit-out. If Base can't finish reading your drawings, the job now says what to do next in plain words instead of showing a technical error. Each quote shows where it stands (waiting for your answer, accepted, declined, or replaced by a newer quote), and only an open quote offers Review and accept. Once you accept a quote, the job lists only the builder you chose. While Base is choosing your builders, the page says that during the pilot a person does this by hand. An answer to one of the brief's decisions can't be sent twice while it is still saving. A new guide page, Planning a fit-out, walks through every step.

  • 8 Oct — The assistant now works across every Timesheets tab: ask who still needs approving, who is expected on a job tomorrow, whether a subcontractor is on site, which jobs are over their labour hours, or what daywork is waiting, and it answers from the same figures the page shows. It can move the week or calendar, open a person or job, draft a reminder or "are you on site?" text for you to send, and approve hours or daywork when you tell it to.

  • 8 Oct — Retention release fixes. A voided retention-release claim no longer stops you raising the release again (it used to block it, and the job's close, for good). Retention held is read from claims you have sent, never a voided or disputed one. A claim that does not list every schedule line now still holds retention on everything claimed to date, so the release is not short.

  • 8 Oct — Progress claims with cents on many schedule lines now reach Xero. Base works out GST once on the claim and Xero works it out line by line, so a claim could be a cent or two apart and be refused; Base now sends each line's GST so Xero's invoice equals the claim you sent to the cent. A discounted invoice line is sent with its discount.

  • 8 Oct — A credit note now reduces what the client owes on the claim as soon as you issue it, with or without Xero. Before, only Xero could record a credit against a claim, so without Xero the credited amount was still chased as overdue and the client's correct payment could not mark the claim paid.

  • 8 Oct — The schedule of values now follows the contract sum. If you change a job's contract sum after its schedule was built, Base rebuilds the schedule within the hour, as long as it is unlocked, unclaimed and unedited; otherwise Money shows that the schedule no longer adds up to the contract. A schedule that does not add up can no longer be locked, because claims can only ever reach the schedule.

  • 8 Oct — Fewer money emails. An open alert (cash, GST, a job's margin, decisions waiting) now emails or texts at most once a day, one copy per address, and a reminder's subject starts Still open (day N) instead of looking like a new drop. Margin and decisions-waiting emails wait until someone in your business has used the money side (a claim sent, an order committed, a bill approved or typed, a decision made, or Xero connected); until then they show in your inbox and on the Money page only.

  • 8 Oct — A budget line below zero (a cost-saving credit from the estimate, or an omission variation) now lowers the job's forecast by its amount. It used to forecast $0, so the credit dropped out of the forecast and the job's margin read lower than it was, sometimes as a loss. Job Costs, the Money page, the WIP report and the margin alerts all show the corrected figure. % complete is now measured against the work budget, so a credit no longer inflates it.

  • 8 Oct — Subcontractors on a lump sum or on day rates. When you award a tender, choose how they are Priced; on the order's new Pricing panel, add their hourly, overtime, weekend or day rate. Timesheets → Daywork prices their site sign-ins on those rates each week: on day rates you approve a docket and their bills then go through only up to the hours approved; on a lump sum only shifts you tag as daywork are priced, and approving proposes a variation for Money → Decide.

  • 8 Oct — Moving a draft purchase order to Issued or Accepted from the status menu now counts as committing it, as the Issue button does: it is recorded on Money → Decide, the issued date is set, and an order over your approval limit waits for someone who can approve it. Nothing is emailed: the menu is for orders you sent yourself.

  • 8 Oct — Labour costs closer to what you pay. Settings → Finance can break your on-cost percentage into its parts (super, workers comp, payroll tax, leave, allowances) and cost overtime past a daily or weekly threshold. In Timesheets → Shifts, Cost to puts a shift's hours on a chosen line of the job's budget; otherwise they go to the line matching the person's trade, which you set on their page. Editing an approved shift now takes the approval off until the corrected hours are approved again.

  • 8 Oct — Fridges, ovens, sofas and beds in your 3D designs. Press Add an item on a design's 3D viewer to place an appliance or a piece of furniture, at any size. It is drawn to the size you give it, and the handles and legs stay the right size. Kitchens, laundries, pods and floor plans now show their appliances and furniture this way instead of as plain boxes. The whole set is on the new Item library page.

  • 8 Oct — Timesheets is now a labour hub. Week shows everyone's hours and cost day by day with one button to approve a person's week. Expected shows who the programme, week plans and mobilisation dates have on each job, by week or month, ticked when they sign in — and a message button on each name to remind them before the day, ask "are you on site?" once the site has started, or follow up a day they missed. On site now shows everyone signed in across every job, with who is expected and not here yet. Jobs shows labour hours and cost against each job's budget. Shifts is the old list, now with what each shift cost. A person's rate and cost show only to people allowed to see pay.

  • 8 Oct — Every crew member now has their own page: hours by week and job, recent shifts, tickets and expiry, and their rate history. Change rate takes a date, so a raise from 1 July never touches June's hours.

  • 8 Oct — The job Site home opens with a summary of who is on site, who is booked and what needs tidying, and lists who the plan expects today with the same message button. A job's Crew tab now shows who is on site and recent shifts beside the QR code and the job's crew.

  • 8 Oct — The Crew Roster opens with a summary: active crew by site, workshop and office (amber when anyone's hours aren't costed because they have no rate), how many are on site now, and the crew's weekly hours. People needing a PIN are grouped at the top, and the PIN is now optional when you add someone: leave it blank and Base texts them one. Sign-in Locations are now cards with their QR, edit and delete buttons always showing, plus who is clocked in at a workshop or office now. The Site job list shows each job as a large card with how many are signed in.

  • 8 Oct — Mark won now fills in the contract sum with the estimate's price (what the client pays). It used to fill in the estimate's cost, so a job won without changing it had a contract sum, and a schedule of values, short by your margin. If you won a job this way, check its contract sum against the quote the client accepted.

  • 8 Oct — Share a design with your client in 3D. On the Designs page, Share with client makes a link (with an emailed code, a password, or open) and a QR code for your plans. Your client views the design read-only, clicks a part and leaves a comment, and you are notified with the part they meant.

  • 8 Oct — Unlocking a won estimate works again. Since it was added, anyone with the Unlock a won estimate permission was refused with a security error when they tried; the unlock now opens and relocks as described.

  • 8 Oct — A variation raised from a spreadsheet or a supplier's quote now keeps every line, with its trade and cost code, and the variation document prints those same lines. Base asks whether the amounts include your margin before saving, and an approved variation adds its cost to the budget under each trade's cost code instead of as one line.

  • 8 Oct — The 3D viewer now shows just your units on a plain backdrop, without the timber floor and wall behind them (pick Room under Look if you want them back). Drawers open with their boxes attached to the front, the scale figure menu opens over the model instead of behind it, and the assistant can open one drawer or door, point at a single part such as the bin pull-out, and turn to face it.

  • 8 Oct — A section heading in a schedule (Joinery, Stone, Preliminaries…) now moves to the next page with its first item, instead of being left alone at the bottom of a page.

  • 8 Oct — Editing a long RFQ, quote or scope after it is generated no longer breaks its PDF. The pages you see in the editor are only a preview, and saving keeps the schedule as one table, so the download no longer leaves a single line alone on a page with a repeated header under it.

  • 8 Oct — A job's Tasks page is simpler at the top. One panel counts what is on the board and shows the two automations in plain words, each with an on/off light: Keeps this list up to date and Plans the week ahead. Missed tasks and Who was booked on site now only appear when there is something in them.

  • 7 Oct — Base Connect: clients planning a fit-out can ask Base to introduce them to up to three licensed builders. Say which jobs you want and keep your licence and insurance current under Settings → Base Connect; matching jobs arrive in CRM → Connect jobs as an outline, with 48 hours to accept or decline. Accepting sets up the lead and a project at quoting with the drawings and brief; you run your own takeoff.

  • 7 Oct — The PM Agent's week plan has moved out of the programme. Each job's plan, review misses and site bookings now sit at the top of the job's Tasks page, and My Tasks has a new Week view that shows every job's plan day by day, with your own next tasks first. The programme's This week button takes you there.

  • 7 Oct — Requests a button sends to the chat for you (Render image, Estimate this design, Stage the frame, the 3D ask bar…) show as a Sent for you card: what was asked in plain words, its settings, and Open to go back to the page or unit it came from. The full request is one click away.

  • 7 Oct — When the assistant walks you through the app, the chat keeps that walkthrough as a card. Press Replay to run it again on your own screen, without asking the assistant.

  • 7 Oct — Render image on a 3D model now picks a setting to suit what it is: a vanity or kitchen in a room, a pergola, deck or outdoor kitchen outside. The style choice is just the light: Daylight, Evening or Studio.

  • 6 Oct — New Estimate opens a start page: drop the plans, pick the job type, and the chat beside you builds the estimate. The old shortcut lands there too.

  • 6 Oct — A business's Track record tab now opens with one line on how they have performed in what they are to you, the ratings that matter for those roles first, and six cards of counts: tenders, work with you, on site, communication, money, and identity and public. Reply times, incidents and registration checks now count, and the record refreshes within ten minutes of anything happening with them. Press Refresh now to rescore.

  • 6 Oct — The estimate has an Undo button (and Ctrl+Z). It takes back your last change on the page: an edit, a deleted line, a cleared section, a margin. The arrow beside it lists every change you have made since you opened the page.

  • 6 Oct — Base saves automatic revisions of an estimate: one when the assistant finishes building it, then one about ten minutes after you stop editing whenever it has changed. They are marked automatic in Revision history.

  • 6 Oct — The project selector at the top of the nav shows the open project's name again. On accounts with a lot of projects it sometimes just said "Project".

  • 6 Oct — The side nav is organised by workspace: Estimating, Delivery, Money, Workshop, or Everything. Click the BASE lockup at the top of the nav to switch. Owners follow the job: a job being quoted opens in Estimating, a won job in Delivery.

  • 6 Oct — Settings moved behind the account menu at the bottom of the nav, with a hub page and a rail to move between them.

  • 6 Oct — Estimate Templates, Productivity and Track Record left the nav.