Subcontractors on a job
The trades on a job: quotes, orders, compliance, claims.
What it is
The trades engaged on a job, one card each across the page: on the left who, for what trade and scope, at what quoted and contract amount and the retention held; on the right whether their contract, insurance and licence are current, their SWMS, insurance and WorkCover documents, retention held, and the certifications you have filed against them. The project manager keeps it; the gate, the purchase orders and the payment claims read from it.
Before you start
- The Subcontractors module is on (Settings → Team Modules). Without it the tab is hidden, and opening its address says Subcontractors is not switched on for you.
- Engaging, changing and removing a subcontractor needs Subcontractors → Edit. Award & request docs needs Subcontractors → Award tenders.
- The subcontractor is in Contacts with the subcontractor role, or you add them in place from the engage form.
- To email them a compliance link, the business has an email on its primary contact, or you type one.
How to
Engage a subcontractor
- Press Engage subcontractor.
- Pick the Company from Contacts (search; a business not there yet is added in place and given the subcontractor role — Base first asks what trade they are, since the site sign-in uses it to show their people their work). Their usual trade fills Trade unless you have typed one.
- Add a Scope Description, the Engagement Type (Subcontract, Supply & Install, Labour Only, Materials Only), the Quoted Amount and Contract Amount (ex GST) and the Mobilisation Date. If their subcontract sets its own retention terms, put the share given back at practical completion in Retention back at PC (%) and its defects period in Defects period (months). Leave both blank for the usual: half back at practical completion, the rest when the job's defects period ends. A share must be 0 to 100 and a defects period whole months; the form says so if not.
- On a won job the form also shows Ask them for their SWMS, insurance and WorkCover now, ticked. Leave it ticked to award them as you engage them: they go on the site sign-in and their primary contact is emailed the documents link. Untick it to do that later with Award & request docs.
- Save. A card appears with its compliance checklist. A line at the top of the page says who the documents request went to, or the link to pass on if the email did not go. The pencil edits the engagement; the bin removes it after a confirmation.
Raise their subcontract
In Base the subcontract is the purchase order: the scope, the price and the terms they work to.
- Each card has a Subcontract line. It names their purchase order and its status when one is issued, or says their order is still a draft.
- When there is none, press Draft their purchase order. Base drafts one to them for their trade, with the scope, the contract amount (else the quoted amount) and their retention. A draft commits no money.
- Open Purchase Orders to check the draft and issue it. They accept it in their Base portal.
- If the line says a draft order for their trade is already on Purchase Orders, put them on that draft there rather than drafting a second.
Award the trade and request their documents
- On the card, under Compliance, press Award & request docs. Enter or confirm the email and press Send.
- Base emails the business a no-login link to upload their SWMS, public liability insurance and WorkCover, stamps the award date and puts the company on the site sign-in gate. The three document chips go green as each arrives, with its expiry.
- Later, Resend compliance link sends a fresh link. Earlier links expire; the award date does not move.
Keep compliance current
- Each card lists Contract Signed, Insurance, Licence and, where the business has them, ABN, ACN and QBCC checks from the weekly identity check. Red means an unsigned contract, expired insurance with nothing new on file, no insurance on file and none verified, an expired licence or a failed registration check; amber means insurance expiring inside 30 days or a licence not yet verified. A certificate the sub has uploaded (or you recorded) that nobody has checked yet shows amber: On file — check it and verify. A Workcover line appears once their WorkCover certificate is on file.
- A sub mobilising inside seven days without a signed contract, an expired licence or a failed registration check puts one notice at the top of the page naming who needs attention (Compliance needs you on …). Press a name to go to their card; what is wrong is on the card's checklist.
- Under Certifications, Attach files a PDF or image against the engagement; the bin removes it.
Verify a certificate on file
- On a line that says On file — check it and verify, press Verify.
- The dialog names the certificate. Press Open to read it, and check it is theirs and current.
- Confirm the Expiry date printed on it. It is filled in when the sub gave one at upload; change it if the certificate says otherwise.
- Press Verify. Insurance and licence lines go green, "Verified, expires" with the date. For WorkCover the line goes green once its expiry is confirmed. Base reminds you 30 and 7 days before the date.
Verifying needs Subcontractors → Edit.
Record a compliance document a sub sent you
- Press Add compliance document at the top of the page (or on the subcontractor's page in Contacts, under Compliance documents).
- Drop the certificate of currency, licence or SWMS on the form, or click to choose it. Base reads whose it is, what it is, the insurer, the policy or licence number, the cover and the expiry date, and shows them beside the file.
- Check the values and press Confirm and save. A subcontractor not yet in Contacts is added there. Public liability, contract works and workers compensation need the Expires date; the form says so if it is blank.
- It is on the subcontractor in Contacts under Compliance documents with its expiry. A SWMS is kept for this job; insurance, workers compensation and licences count for every job.
Prepare a notice of backcharge
The document icon on a card opens the backcharge notice for that engagement to fill in, review and save as a PDF filed against the job.
Arrange a meeting with the trades
- Press Arrange a meeting at the top of the page (it shows once a subcontractor is engaged).
- The New meeting dialog opens on this job as a trade coordination meeting, with the main contact of each subcontractor you have engaged ticked and the site as the place. Change any of it, then press Send invites. Each gets a calendar invite of their own; see Calendar.
What happens on its own
- Awarding a tender on the Tenders page, or marking the job won, runs the same compliance request as Award & request docs, so a sub awarded there reaches the gate too.
- Engaging a sub on a won job with the tick left on runs that same request too. Saving the same engagement again does not send a second one.
- Engaging a subcontractor puts them on the programme tasks of their trade that nobody holds yet, when they are the only company of that trade on the job. With two companies of one trade, Base leaves it to you to say who does which task.
- Documents a sub uploads through their link land on the card and on the job's Safety page. Expiring cover is chased automatically when an order is issued inside its window.
- The upload link and the Base portal ask the sub for the expiry date of their insurance and WorkCover and will not take either without one, so Base can remind you before it runs out.
- The assistant sees the same documents as the card: the job's SWMS and the company's insurance, WorkCover and licences, with the date each arrived and its expiry, or that none was given.
- A compliance document recorded from the office is chased like one the sub uploaded: Base reminds you 30 and 7 days before it expires, and on the day. One that is emailed in or uploaded to Documents and not recorded gets one agent item asking someone to record it.
- ABN, ACN and QBCC are re-checked weekly and the result shows beside the expiry dates.
- Contract Signed goes green by itself when the sub e-signs their purchase order (or a document of type Contract filed against them) in Base, dated the day of the last signature. A date you already entered is kept. Accepting the order in their portal, without signing, does not tick it.
- The retention line on each card is kept from certified claims: the percentage, what is held and whether it has been released. Where their subcontract sets its own terms, the line adds them, such as "60% back at PC · 6-month defects".
- The retention release on Job Costs, their Base portal and the cash forecast all follow those terms, or the usual half at practical completion and the job's defects period when none are set.
Things that surprise people
- A long scope shows its first four lines, as written, with Show all to read the rest.
- A failed check shows once, on the card. The notice at the top only names the businesses, however many checks failed.
- An upload does not verify itself. The chip goes green when the file arrives, but the Insurance line stays amber until a person checks the certificate and presses Verify.
- Insurance and WorkCover are the company's, not the job's: one certificate counts on every job they are on. Only the SWMS is per job.
- A subcontractor's cost reaches the job through certified claims, purchase orders and bills, never through timesheets. A sub signing in at the site QR is recorded for attendance and induction and deliberately not costed, or the job would pay twice.
- Engaging a sub does not commit money. Issuing a purchase order does; see Purchase orders.
- A sub engaged before the job was won is not asked for their documents when it is won, unless they won a tender. The Won summary counts them; press Award & request docs on their card.
- Asking for documents as you engage needs Subcontractors → Award tenders. Without it the sub is still engaged, and the page says someone with it has to press Award & request docs.
- A sub needs BSB and account details on their Contacts record before a payment run can pay them.
- The portal link that lets them lodge a payment claim is theirs; the claim lands on Job Costs with the statutory response clock already running. See Subcontractor claims.
- In the Base portal they can claim line by line against their orders and the variations you approved, and they see the retention you hold from them and when it comes back.
- Their portal says which terms the retention figures are on: "under your subcontract" when you recorded the terms, "the usual split" when you did not. If their subcontract says otherwise, record it on the engagement.