In this guide
Stock
The shop's shelves: load, count, receive and reorder stock, and use it on a job.
What it is
Stock is the shop's shelves on one screen: every item you keep — sheets of board, rolls of edging, hinges and runners, lengths of steel or timber, glue and other consumables — with how many are on hand, how many are on order, what they cost and what they are worth. It is for whoever keeps the shelves full and whoever works out what a job will need.
Every change to what is on a shelf is recorded as a movement: stock loaded, a delivery received, a stocktake difference, a correction, stock used on a job, stock put back. The figure on hand is always the sum of those, so it can always be explained.
You use stock on a job from the job's Manufacturing page, on the BOM & POs tab. This screen is where stock is loaded, counted, received and reordered.
The pane at the top leads with the Stock value: what the shelves are worth, ex GST, at average cost, and how many items have no cost yet. Beside it: how many Items, how many are Low and Out (press either to show only those), and the Orders on the way (press to open the Stock orders tab). The strip along the foot says how many items are low or out with nothing on order; press it to start a stock order for them. The actions (Load stock list, Add item, Receive delivery, Stocktake, New stock order) sit beside the title.
Before you start
- The Workshop module must be on for you (Settings → Team modules). Seeing stock needs Workshop view; changing it needs Workshop edit.
- Using stock on a job's BOM needs permission to edit joinery, the same as adding a row to the BOM.
- If you keep your stock in a spreadsheet, have it to hand as .xlsx (up to 2 MB) or .csv (up to 5 MB), one row per item, up to 2,000 rows. Base reads columns called things like Item, Qty, Unit, Cost, Location, Code, Thickness, Size, Category and Reorder.
How to
Load your stock list
- Press Load stock list.
- Press Choose the stock list and pick your .xlsx or .csv file.
- Read the preview. Each row shows what was read, and whether it will be added to an item you already have or create a new one. Rows Base could not read are listed with the reason; columns it did not use are named.
- Untick any row you do not want.
- Press Load.
Loading adds the quantities as stock that arrived. Load the same list twice and it counts twice — to set the shelves to what is actually there, use a stocktake. If a load is interrupted, pressing Load again from the same preview finishes it without adding the rows that already went in.
Keep steel by the metre and the kilogram
Steel sections are kept in metres and plate in kilograms, the units your pricing sheet and a stair's take-off use. A 3 m cut off an 8 m bar leaves 5 m on the shelf instead of charging the job the whole bar.
- In your stock list, name each section the way a drawing does: "75x50x3 RHS", "200PFC", "42.4 x 3.2 CHS", "50x6 flat bar". Your pricing sheet's own spelling ("75X50X3.0-RHS-p") is read too.
- Count sections in m. If you count bars, put the bar length in the name ("75x50x3 RHS 8m", unit "lengths"): the preview shows them converted to metres, with the cost per metre.
- Name plate by thickness and grade ("10mm G250 plate", "6mm checker plate", "3mm 316 plate") and count it in kg. Every sheet size of one thickness and grade is the same shelf.
- Load the list as above. A section or plate Base recognises matches a stair's materials list exactly.
Add an item by hand
- Press Add item.
- Give it a Name (for example "Raw MDF 16mm 2400 × 1200"), a Category, a Unit, and if it helps, a Code, Thickness, Size and Location.
- Set Reorder at to the quantity that should prompt a reorder, and Reorder qty to how many you normally buy.
- Optionally pick a Usual supplier, and enter Opening stock with its Cost each, ex GST.
- Press Add.
Count the shelves (stocktake)
- Press Stocktake.
- Type what is on the shelf against each item you counted. Leave an item blank to skip it — a blank is never read as zero. The Difference column shows what will change.
- Add a note (for example "October count").
- Press Save count. Only the differences are written, each noting what the books said.
Receive a delivery
- Press Receive delivery (or open an item and press Receive).
- Pick the Item, enter the Quantity received and the Cost each, ex GST.
- Press Receive. The item's average cost moves to take in the new stock.
Set an item's cost
Use this when an item has no cost, or its cost is wrong.
- Open the item from the list and press Set cost. An item with no cost shows No cost · Set in the Avg cost column; press that instead.
- Enter the cost each, ex GST, and why it is changing: the invoice, the price list, a correction.
- Press Set cost.
The next take from the shelf charges this cost. Takes already made keep what they were charged. The item's history shows the change: Cost set, the old cost and the new one, and why.
Correct an item
- Open the item from the list and press Adjust.
- Enter the change — negative takes stock away — and the Reason.
- Press Adjust.
Order stock from a supplier
A stock order is a purchase order like any other, raised on the company's Stock job instead of a client's job. It goes through the same steps as a job's order and is never charged to a job.
- Press New stock order (or the reorder strip at the foot of the pane at the top). It fills itself with every item that is low or out and not already on order, at its reorder quantity.
- Pick the Supplier and the Delivery by date, and change the lines and prices as you need.
- Press Raise draft. With Send it to the supplier next ticked, the order's send opens straight away; otherwise press Send on the Stock orders tab when it is ready.
- Send shows who it goes to — the supplier's primary contact, which you can change — and the lines and prices. Press Send and issue: the supplier is emailed the order, it is issued once the email has gone, and its PDF is kept on the Stock job. If the email fails, the order stays a draft and Base says why.
- If you sent it yourself (phone, the supplier's portal), press Mark as sent instead. Nothing is emailed; it is recorded as issued and your approval limit applies.
- When it arrives, open Stock orders, press Receive, and enter what arrived against each line. It goes on the shelf at the order's price. A part delivery can be finished later.
Order a pack for a job (buy more than the job needs)
When a supplier sells by the pack — 30 boards when the job needs 3 — order the pack for stock from the job's BOM, and the job only pays for its 3.
- On the job's BOM & POs tab, tick the row (or rows of the same material) the pack is for.
- Press Order for stock.
- Pick the Supplier, enter the Pack quantity (at least what the rows need) and the Price each, ex GST.
- Press Draft the stock order. Nothing goes to the supplier yet — press Send it from Stock and Send it from the Stock orders tab.
The rows show Coming · PO-STK-… until the delivery. When the order is received, all 30 go on the shelf and the rows take their 3 at the pack's price — that is all the job is charged. The other 27 stay on the shelf for the next job.
Use stock on a job
- Open the job's Manufacturing page and press the BOM & POs tab.
- The Stock column says what the shelf can do for each row:
- 8 in stock · Use 3 — the shelf holds exactly this material. Press Use.
- Maybe … — something with a similar name is on the shelf. Press Use…, check it is the same material, and pick it.
- From stock… — nothing matched. Press it to pick an item from the shelf.
- To take everything the shelf matches exactly for a unit, press Use stock on the unit's band.
- If the item has no cost, the row asks first: No cost — charges $0.
- Take anyway takes it and charges the job nothing.
- Set cost opens the item on the Stock page, so you can give it a cost and then take it.
- Use stock on a band leaves these rows and says how many, so you can take them one by one.
What the shelf cannot cover stays on the row to order. When every material on a unit is on hand, the unit moves to Materials received by itself.
Take stock to a job
For stock that isn't on a BOM, such as screws for a site or consumables for the install crew:
- On the Stock page, press Take to a job.
- Pick the Item, the Job and the Trade it is for, and how much. Leave the trade as No trade yet if you don't know; the job's Needs a look raises it after a few days.
- Press Take it.
It comes off the shelf now and the job is charged its average cost, ex GST, on that trade. The charge is never a bill: nobody pays it again, and it never goes to Xero. To put it on another trade later, use the move button on its row in the job's Cost entries.
Put stock back
- Undo on a row taken from stock puts it all back on the shelf, reverses the job's charge, and puts the row back to order. If the unit had moved to Materials received because of it, it moves back.
- Return… on a row taken from stock puts some or all of it back; the job's charge shrinks with it. Returning all of it cancels the row — the job needed none of it.
- Return surplus… on a row bought for the job on a purchase order and received puts the spare on the shelf at what the job paid, and credits the job.
- Return surplus… is offered only on rows that came in on a purchase order. For a row marked received without one, receive the spare on this page with its cost, and add the credit on Job Costs if the job paid for it.
What happens on its own
- Using stock takes it off the shelf straight away and charges the job its average cost, ex GST, on the job's budget line. The charge shows on Job Costs as From stock. No GST is added — it was claimed when the stock was bought — and it never appears in a payment run.
- The charge is approved by the person who used the stock. Stock used on a job is not a bill: it is left out of the bills register, the GST position, the TPAR and the job's Paid figure — the stock order's bill counts there, once.
- Each item keeps a moving-average cost: stock arriving at a known cost moves the average; stock leaving never does.
- An item used on a row it did not match exactly learns that material, so the next job's take-off matches it exactly.
- Rows pushed to the BOM from a 3D model carry the exact material, thickness and sheet size, which is what lets the shelf answer them exactly.
- A steel stair's materials list carries each section's designation and each plate's grade and thickness, so it matches your steel by the metre and the kilogram.
- Stock used on a row that names its own cost section (a stair's fixings are Hardware & Fixings) is charged to that budget line, not the one the unit is filed under.
- The assistant can list stock, load a list you paste into chat, receive or count stock, and take stock onto a BOM row when you ask it. It does none of these from a background run.
Things that surprise people
- Stock with no cost can still be used, but only after you say Take anyway. The job carries nothing for it, and the row says no cost. Someone with Job Costs can give the item a cost later with Set cost; that prices the next take, not that one. The Stock value figure says how many items have no cost.
- In the list, In stock is a plain grey word; only Low and Out are coloured. Filter with Low & out only and Archived in the toolbar above the list.
- A stock order and its bill live on the Stock job (number STK), which never appears as a live job. The bill is paid like any bill, but it is a stock purchase — it is in no job's costs. In Xero it is tracked to the Stock job — so a bill the supplier raises in Xero comes back onto the Stock job and is matched to its order — and booked to the account on the STK cost code: set that to your cost-of-goods account under Settings → Cost codes.
- The company P&L counts stock when it is bought (the Stock job's bills). What a job takes from the shelf is shown on the job, and is not counted again in the company P&L.
- A job's share of a pack bought for it is charged at that pack's price. Stock taken later from the shelf is charged at the shelf's average cost.
- Receiving a stock order needs the permission to receive orders, the same as for a job's order.
- Undoing a stock order's receipt takes the stock back off the shelf, puts the job rows back to waiting and reverses their charge.
- On order counts only orders marked sent or part received; a draft is not on order.
- A row already on a purchase order cannot be taken from stock. Cancel the order line first, or use stock for what the order does not cover.
- A row taken from stock cannot have its quantity, cost or status changed, or be deleted, from the BOM. Use Undo or Return… in the Stock column — they keep the shelf and the job's charge in step.
- An item kept in a different unit (square metres against a row in sheets) cannot answer a row. Pick an item kept in the same unit.
- Steel counted in bars with no bar length in the name loads as bars, and a stair row in metres cannot draw on it. Put the length in the name ("8m") or count in metres. Plate counted in sheets has the same problem: count it in kg.
- If two people take the last of an item at the same moment, the second is told it has gone and nothing is taken.
- Archived items stay in the history of the jobs they went to; they just stop matching new rows.
- Costs on this screen — average cost, value, what each movement cost and what a job was charged — show only to people with Job Costs access; everyone else sees the quantities, with — where a cost would be.
- A stock charge on Job Costs (From stock / Back to stock) cannot be approved, unapproved, moved to another line or order, re-priced or deleted there; use Undo or Return… in the BOM's Stock column. An undone one reads Undone — back on the shelf.
Related
- Manufacturing, where stock is used on a job's BOM.
- Workshop, the company-wide production board.