In this guide
Scanning a label
What a part, cabinet, unit, crate or equipment label opens on a phone — how to make it in the workshop, how to install it on site, a crate's contents and delivery — and who can record work from it.
What it is
Every label Base prints carries a QR code: the part and cabinet labels a unit gets when it is released to the workshop, unit and crate labels, and the equipment labels for boxes received on a supply order. Scanning one with a phone camera opens a page that says what the piece is and where it belongs. Nobody needs a login to read it.
On a part or unit label, the page also shows the unit's making stages: Machining, Assembly, Finishing and QA. Each stage has the files the crew build from, a checklist, its photos, and buttons to start it and mark it done. This is how the floor records its work without a computer.
What the page shows follows the unit. In the workshop it shows how to make it. Once the unit has been dispatched, the same label shows how to install it: where it goes, the installation notes, the drawing and Log install.
There are five labels:
- Part — on each part: its size, material, edges and machining, the unit and the room it goes in.
- Cabinet — on each carcass: how that cabinet goes together, step by step, with the parts and hardware for each step.
- Unit — on the finished unit or its wrapping: its making stages in the workshop, how to install it on site.
- Crate — on the crate: what is inside and where each unit goes, and Packed, Dispatched and Delivered.
- Equipment — on a box received on a supply order: a crop of the floor plan with its spot in red, the room, its plan tag, the mounting height, the services it needs, any install notes and the order it came on.
Below that are buttons for what was just done to it, the ones that suit the label, such as Cut, Edged, Machined, Assembled, Sprayed, QA passed, Packed, Delivered or Installed, under Record a station. On a unit with making stages the stages come first and these buttons follow them, under Other stations. Then a Something wrong with it? box with Report, and the Recent scans.
It is for the people making and fitting the unit: the CNC operator, the cabinetmaker at the bench, the sprayer, whoever does QA, the driver and the installer.
Before you start
- The label has to be live. A label that has been switched off, such as the part labels of a unit pulled back from the workshop, shows "This label isn't active."
- The unit must be released to the workshop. Its labels are printed from Labels on a unit on the job's Manufacturing page or the Workshop board; equipment labels from Print equipment labels when you receive a supply order on Purchase orders.
- Reading a label needs nothing. Doing anything from it — recording a scan, starting or finishing a stage, ticking a line, adding a photo, opening a stage's files, a crate's Packed, Dispatched or Delivered, or Log install — needs one of two things: your 4-digit crew PIN (the one you sign in on site with), or being signed in to Base in your business with Edit on Workshop or Joinery (Settings → Team modules).
- The office sets what each stage needs before it can be done under Settings → Machines, tools and stations → Making rules.
How to
Record a station scan
- Scan the label. The page opens on the item.
- If the phone is not signed in to Base, type your 4-digit PIN in Your crew PIN, the one box above everything you can do on the label. Every button on the page uses it, and that browser tab keeps it for your shift, so the next label you open in it does not ask again.
- Press the button for what you just did, such as Cut, Edged, Machined, Assembled or Sprayed. The page says Recorded and, when it applies, where the unit moved ("The unit is now at Assembly"), that the station is finished for the unit, or why the unit stayed where it was.
Put a cabinet together
- Scan the cabinet's label (B01, B02 and so on).
- Putting B01 together lists each step in order — carcass, back, shelves, drawers, fronts, handles — with the part marks and hardware for it.
Start a stage
- Pick the stage along the top, such as Assembly. A tick beside a stage means it is done, a dot that it is under way, a warning sign that it is held up.
- With your PIN in Your crew PIN (if the page asks for it), press Start Assembly. Your name and the time are recorded against it.
A stage that cannot start yet says why. For example, Machining waits until the cut list and nest are filed. A unit released before making stages arrived is not held for files: its stages say its files are on the unit's Manufacturing page.
Open the files you build from
- Under Build from, press Open beside a file: the cut list, the nest, the CNC programs, the assembly pack, the drawing or the finish spec.
- It opens on the phone. Files only open after your PIN, or for someone signed in with Edit on Workshop or Joinery.
Tick off the checklist
- Under Checklist, tick each line as you finish it. The lines come from the unit's model (its carcasses, doors and drawers) and from the lines the office adds for every unit.
- A line that needs a measurement asks what it measured. Type the number.
Add a photo
- Press Take a photo. The phone's camera opens.
- Take the photo. It is filed on the stage, in the job's Documents.
Assembly, Finishing and QA each need a photo before they can be done, unless the office has changed that.
If your company has turned on the AI photo check, a line under the stage says how its photos read, for example AI check: 2 look right · 1 to look at. It is a second pair of eyes. It never stops you finishing the stage.
A stage ticked done at sign-out without its photo says Done — the photo is still owed. Take a photo stays on it until the photo is taken.
Mark a stage done
- Press the stage's done button, such as Assembly done. It stays greyed out while anything is missing, such as a line not ticked or no photo, and the page lists what.
- When it is done, the unit moves on to the next stage on its own.
Pass or fail QA
- Tick the QA list and add the QA photo.
- Press QA passed. The unit is ready to dispatch.
- Or pick the stage it goes back to (Back to assembly, for example), type what failed and press QA failed. That stage and the ones after it open again.
Say a stage is held up
- Press Held up…, type what it is waiting on, such as "no hinges", and press Mark held up.
- The office sees it on the unit. Press Unblock when you can carry on.
Report a problem with it
- Type what is wrong in Something wrong with it? and press Report (with your PIN if the phone is not signed in).
- The page says the foreman sees it on the unit.
Pack, dispatch and deliver a crate
- Scan the crate's label. It lists what is inside and where each unit goes.
- Press Packed when it is packed, then Dispatched when it leaves. Dispatching moves its finished units to Dispatched.
- On site, press Delivered…. Type who received it and have them sign on the screen, or take a photo of the signed docket. Press Delivered.
Enter your PIN once for the day on site
- Scan a unit's site label (the 100 × 150 one stuck inside the carcass) or any of its labels once the unit has been dispatched. The page shows On site: where it goes, which copy this is when the unit has more than one, how many are in, the Install brief and the workshop's notes for site.
- Type your crew PIN and press Use my PIN today. The phone keeps a pass for the day, so no other label asks again.
- Press Sign out beside your name when you hand the phone to someone else, or when you can't submit — it clears your pass, a visitor name and the PIN the workshop panels keep, so the next person starts clean.
- If the page says your PIN is not on this job's crew, you can leave notes but not log installs: the install buttons are hidden. Ask the site manager to put you on the crew, or Sign out so someone on the crew can use their PIN.
Report on a unit without a crew PIN
- Anyone who scans a unit's label — the builder's site manager, the client's representative, a subcontractor not on the crew — can report on it. Under No crew PIN?, type your name (and a phone number or company if you like) and press Report as a visitor. The phone remembers you for the next label.
- Pick what it is, write it, add photos and press Send note. It reaches the workshop or the PM like any site note, marked as from a visitor with your name.
- A visitor can only leave notes. Saying a unit has arrived, logging an install and asking for sign-off still need a crew PIN.
Say it has arrived
- With the unit unloaded, press Arrived on site. It is recorded once, with your name and the time, and shows on the unit's page in the office.
Install it on site
- Press Open the drawing to see the approved drawing.
- On a unit with more than one copy, pick Which copy? The label you scanned picks its own; copies already in are ticked and greyed out.
- Pick Installed, Needs rework or Report a defect. Take a photo; installed needs at least one. Say what is wrong for rework or a defect.
- Press Log install. A unit of three turns Installed when its third copy is logged, not on the first.
Tell the workshop or the PM
- Under Tell the workshop or the PM, pick what it is — Missing, Damaged, Doesn't fit, Drawing wrong, Finish, Question or a plain Note — write it and add up to four photos. Press Send note.
- A problem goes to the foreman and the workshop; a question to the job's PM. Their reply shows under The thread on the label, so scan it again later.
Ask for sign-off
- Once every copy is in, Finished? Ask for sign-off appears. Take photos of it adjusted, cleaned and protected, and press Ready for sign-off.
- The PM is told, checks the photos and signs it off from the unit's page. The label then says Signed off.
Mark equipment delivered or installed
- Scan the box's label. The plan crop shows where it goes. If its spot has since been taken off the plan, the page says so and to ask the site manager where it goes.
- Press Delivered or Installed, with your PIN if the phone is not signed in.
After handover
If your company has turned on the care view, scanning a unit's label after it's signed off shows the client:
- how to look after it;
- what it's made of;
- the job's joinery warranty;
- who to call.
Crew and installers press Open the install view at the foot to get the installer's view.
What happens on its own
- Done on the stage a unit is at moves the unit on: Machining done moves it to Assembly, and so on. Its track on the Manufacturing and Workshop pages follows.
- On a unit without making stages, a scan moves it forward to the stage it names: Cut, Edged or Machined to Machining, Assembled to Assembly, Sprayed to Finishing, QA passed to QA, Packed to Ready to dispatch. It goes through the same checks as the board.
- The first part scanned Cut, Edged or Machined starts the Machining stage, in your name, if nobody has.
- Once every part has had its last operation — cut for a plain panel, edged for a banded one, machined for one with machining — Machining closes itself, as long as its lines and photos are done. If they are not, the scan says what is left.
- Scanning a part Assembled ticks the assembly lines that list its mark, once every part on the line has been scanned. Scanning a cabinet's label Assembled ticks that cabinet's lines.
- A part's scans never move the unit into Finishing or QA. QA is passed on the unit: its label's QA passed, or the QA stage's button. Scanning the unit's label Assembled or Sprayed marks that stage done, its proof permitting.
- The scan marks that station's step for the unit started, and done once every part is through.
- Cut and Machined count towards the wear on the tools that cut the part (Settings → Machines and tools).
- A reported problem is pinned as a note on the unit, and the workshop and the job's head PM are told straight away.
- Installed on an equipment label shows in that day's site diary.
- Every scan, start, tick, photo and done is kept with who did it and when — the crew member whose PIN it was, or the person signed in — on the unit's page under History.
- If your company has turned on the AI photo check, each photo is compared with the unit's drawing, render, finish spec and the stage's checklist within a few minutes of being taken. One with something to look at tells the foreman.
- On poor signal, a tap that did not get through is sent again once. A tap that already landed is not counted twice.
Things that surprise people
- Anyone holding the label can read it, so nothing on it is private. Prices and costs never show on a label.
- Signed in to Base without Edit on Workshop or Joinery, the label asks for a crew PIN, on every button, as if you were not signed in. Ask an admin for the permission, or use your crew PIN.
- A scan never moves a unit back. Scanning Cut on a unit already at Assembly records the cut and leaves the unit where it is.
- Skipping a stage, reopening one and typing hours nobody ticked are done from the office, on the unit's page, not from a label.
- Closing a stage without its photo or checklist is only for someone the admin has allowed, with a reason, on the unit's page. A label never can.
- A label from an earlier release says so at the top. Check the new label before cutting or fitting.
- Delivering a crate, saying a unit arrived, logging an install and asking for sign-off need someone on the job: a crew member put on the job's crew, or a person of a company engaged on it. Anyone else is turned away — ask the site manager to put you on the crew. Anyone with a crew PIN may still leave a note; it is kept and marked as from someone off the job. Anyone with no PIN at all may leave a note with their name; it is marked as from a visitor, and one phone can send only so many in ten minutes.
- What the office and the workshop write for site shows to anyone who scans the label. What site writes back never does — it needs a PIN or a Base sign-in.
- A unit's site label survives a re-release in the workshop; only its part labels change.
- Only the PM signs a unit off, from its page. Ready for sign-off asks; it never closes the unit.
- A crate can't be marked delivered without its proof: a name and a signature, or a photo of the signed docket.
- Cabinet labels are made when a unit is released, one per cabinet, and a second release keeps the ones already printed.
- Scanning a label signs nobody in or out. That is the site or workshop QR on the wall (Site sign-in).
- The PIN is asked once, in one box near the top, not on each part of the page. It is always four digits.
- The page follows the phone's light or dark setting, so it reads the same on a bright site as in the workshop.
Related
- Manufacturing, where units are released and their labels printed.
- Workshop, the board the scans move.
- A unit's page, where the office does what a label cannot.
- Purchase orders, where equipment labels come from.
- Site sign-in, where the crew PIN is used.