Every joinery unit has its own page. It tells the unit's whole story in the order the unit travels: Design, Drawings, Materials, Making, Delivery & install, then History, every move with who made it and from where. The top of the page shows where the unit is on the track, what needs attention and its one next step — the same as its row on the job's Manufacturing page and on the Workshop page.
It is for anyone who needs the full picture of one unit: the project manager answering a client, the foreman checking what is left, the buyer checking its materials.
Before you start
- The Manufacturing module must be on for you (Settings → Team modules).
- Open it from the job's Manufacturing page: press a unit's name on Units → List, Open beside a unit on BOM & orders, a unit's tag on a crate or an install row, or Open unit in a unit's quick view.
How to
Read where a unit is and take its next step
- The top shows the unit's Track (Design → Drawings → Approved → Released → Materials → Making → Dispatch → Installed, with dots for Machining, Assembly, Finishing and QA) and its flags, such as Overdue or Changed since approval.
- Next is the one thing the unit needs. Press it. A step that cannot be taken yet says why under it.
- Set its Joiner (the crew member making it, from the dropdown) and its Due to dispatch date (press it for the calendar) at the top. Each saves as soon as you pick.
Work through its sections
- Design says whether it has a 3D model, how it is priced and the hours counted from the model. Open the 3D design takes you to it.
- Drawings is the same approval bar as on the unit's drawing sheet: issue, check, send to the client or record their answer here. Open the sheet opens the drawing itself.
- Materials shows the unit’s materials figures, ex GST: the estimate, planned on the BOM, on sent orders, billed and from stock. These are the same figures as the unit’s band on BOM & orders, and you need Job Costs to see them. Under them are the BOM rows grouped To source, On order and In hand, each with its count and value. A row taken from stock while the item had no cost is called out, because the job carries nothing for it.
- Making has a card for each making stage — Machining, Assembly, Finishing and QA — with who started and finished it, its hours, the files it builds from, its checklist and its photos. Below them: parts cut, edged and machined from their label scans, sheets cut, its station steps and its hours.
- Delivery & install shows the crate it went in, with when it was packed, dispatched and delivered, and its install records.
- History lists every move with who made it and from where.
Work a making stage from the office
The crew work the stages from the unit's label. From this page you can do the same, and a few things a label cannot.
- Under Making, find the stage's card.
- Start it, tick its Checklist lines, and Add a photo.
- Press Done (or QA passed on QA). It stays greyed out while a line or photo is missing, and the card lists what.
- Skip a stage the unit doesn't need, such as Finishing on prefinished board, with a reason. A stage whose checklist still has open lines can only be skipped by someone with Close stages without their proof.
- Block a stage that is waiting on something, with a reason, and Unblock it after.
- Reopen a stage that was done or skipped, with a reason.
- Type hours for work on a stage that nobody recorded, with a reason. They count for the stage and for estimating, not for cost.
- Done anyway… closes a stage without its checklist or photos, with a reason that stays on the stage. Only someone an admin has given Close stages without their proof sees it work.
- If your company has turned on the AI photo check, each photo carries a tag:
- Looks right — nothing it could see disagrees with the drawing, render, finish spec or checklist.
- Check — something to look at. Hover over the photo to see what.
- Checking… — the check has not run yet.
- Not checked — the check could not run. The check never stops a stage. It is a second pair of eyes for the foreman. A stage ticked done at the workshop sign-out without its photo says Done — photo owed. Add stays on it until the photo is taken.
- If the card says its shop files are not filed, press File the shop files.
Write the installation notes, print its labels, sign it off
- Under Delivery & install, type the Installation notes: how it fixes, what to connect, what to check. Press Save notes. The installer sees them on the unit's label once it is dispatched, and they print on the crate's manifest and on the site labels.
- Press Unit label, Cabinet labels or Site labels to print them once the unit is released. Site labels are 100 × 150, one per copy of the unit, stuck inside the carcass at Pack.
- When it is installed, type a note if you want and press Sign it off. A unit with an open defect can't be signed off. When site has pressed Ready for sign-off on the label, the Site section below says so, with the photos they sent.
Read what site did, and talk to the installer
- Under Delivery & install, the Site section shows when the unit arrived and who scanned it, how many copies are in (2 / 3 installed · to go: 3), each install with its photos, and the completion photos once site asks for sign-off.
- Notes with site is the thread: the workshop's notes at Pack, what site reported (Missing, Damaged, Doesn't fit, Drawing wrong, Finish, Question) with their photos, and your replies.
- To write to the installer, type the note, leave Show on the label ticked and press Add note; anyone who scans the label reads it. Untick it for a note only the office sees.
- Press Reply under a site note to answer it on the label, and Resolve when it is dealt with.
Change its details
- Press Edit details. The unit's details open beside the page: name, quantity, dates, estimate line, duplicate, delete.
- Change them and press Save.
What happens on its own
- The page re-reads the unit after every step you take on it, so its track, flags and sections stay current.
- Label scans at the stations and moves made on other pages show up the next time the page is opened or a step is taken here.
- Marking a stage done moves the unit on when it is at that stage. QA failed sends it back to the stage you pick, and that stage and the ones after it open again.
Things that surprise people
- The drawing sheet is still its own page: Open the sheet in Drawings. The unit's page shows its approvals, not the drawing.
- A unit's tag on the Units list opens its quick view beside the list; its name opens this page.
- Making is empty until the unit is released: its stages, checklists and part labels are made at release, and its shop files filed straight after.
- A stage closed when someone moved the unit on, rather than ticked, says Closed when the unit was moved on — nobody ticked it.
- The checklists come from the unit's model at release: Assembly has a line for each cabinet step (carcass, back, shelves, drawers, fronts, handles) with its part marks and hardware; Finishing has the finish spec and the finishes; QA measures the overall sizes, to within 2 mm. Your own standing lines and the QA list are added after them.
- Finishing skips itself at release when the model has no finishing work and there is no finish spec.
- A failed QA adds a rework line to the stage it goes back to, and a note for the foreman.