In this guide

Rate Book

Your rates, labour rates and supplier price lists, and how the AI uses them.

What it is

Your pricing memory. Your own rates sit in it, and each supplier's price list sits beside them as its own book. When the assistant prices an estimate line it searches all of them at once and shows you where the number came from; your own rate wins a tie with a supplier's. Every rate carries its receipts: where it came from, how many times it has been seen, how much those sightings agree, and when it was last confirmed. The estimator or director who owns the numbers uses this page.

Seven tabs. Rates is the book itself. Imports is where spreadsheets and price lists are staged for approval. Match test replays your priced jobs through the matcher to see how much the book prices on its own. Missing rates lists what you keep pricing that is not in the book. Labour rates holds the $/hr by trade. Estimating rules lists the standing rules saved from chat. Settings holds the AI rate controls.

A few words, translated. A rate is one reusable thing at one unit ("Plasterboard to walls, 13mm, supply and install" per m²), not a project line. The figure is what it costs you; sell prices are kept for the record but never averaged in, and margin is a policy set per job, never baked into a rate. An observation is every sighting of a rate: a job you priced, a quote you imported, a row you uploaded. The confidence band (tight, moderate, loose) says how many observations sit behind the rate and how much they agree. A rate with agreeing observations becomes trusted and is applied without asking again; the Trusted column says until when.

Before you start

  • The book is ex GST. Check one row against an invoice before you import a thousand.
  • Import cost, not sell. A supplier list usually has both columns; the sell one imported as cost under-prices every job by your own margin.
  • Every rate needs a real unit (m², LM, EA, hr, day, lump). "as per quote" and "allow" are not units; a row without one is skipped at commit.
  • A trade's $/hr belongs on Labour rates, not in the book. A rule ("we never supply appliances") belongs in chat. The book holds prices per unit and refuses rules on purpose.
  • The page needs the Rate Book module, and adding, importing or changing rates needs Rate Book → Edit. An admin sets both per person under Settings → Team Modules.

How to

Add a rate by hand

  1. On Rates, press Add Rate.
  2. Type the description (the thing first, then its spec; no rooms, levels, clients or drawing numbers), pick the trade section and unit, and enter the base rate, labour hours per unit and labour $/hr if you have them.
  3. Save. The book's quality gate runs on the server: a description that does not name the item, a unit that is not real, or a duplicate of a rate you already hold comes back as a refusal with the problems and a cleaned-up proposal. Open the existing rate instead, confirm a genuine per-occurrence allowance as a lump, or say how this one differs to create it anyway.

Edit, move or remove rates

  1. Click a description, unit, rate, hours or labour-rate cell to edit it in place. A renamed row passes the same gate as a new one; the server stores the tidied description and the canonical unit.
  2. Tick rows to change their trade, link supplier prices to the business they came from, or delete them. Deleting twenty or more takes a snapshot first.

Import a spreadsheet or a supplier's price list

  1. On Imports, press Import spreadsheet. A spreadsheet in any layout, a PDF price list or quote, or a photo of one all work. Upload a file or pick one already in Documents; a file you attached in chat is already there.
  2. Base reads it and shows what it found: the rows, how it read each one, and a few questions where something is unclear, such as whether the figures are your cost or a sell price, and which supplier the list is from. Lines that read as rules rather than prices are set aside, to keep as estimating rules if you want them, never as a rate.
  3. Press Stage. Rows are tidied in the background in small batches: name rewritten to one shape, unit and trade checked, duplicates grouped, anything doubtful flagged. You can leave and come back.
  4. Open the batch. Rows are grouped by trade, each showing the tidied name with the original underneath, the unit, the price, a confidence and flags. The ⚠ number beside a trade is how many of its rows carry a warning. Approve N with no warning approves the rows that need nothing; the warned rows stay for you to look at and approve one by one (tick needs attention to see only them), and the line under the table says how many were left and why. Reject rest drops what you do not want. Nothing is in the book yet.
  5. Press the commit button. Approved rows become rates with the sheet as their evidence; rows judged to be the same item become one rate with several observations, and a row that matches a rate already in your book word for word is added to that rate as evidence instead of becoming a second copy. Supplier rows become that supplier's book. From this moment the matcher can use them.

What the flags mean: all-in (labour and material in one figure; fine to approve, the split is kept and shown under the description, so pricing never adds labour hours on top), unit guessed (the sheet's unit was blank; glance at it), unit changed or unit disagrees (the description says one unit and the row carries another; check it, a real m² stored as m³ makes every area rate wrong), lump, sell price? (looks like a sell price although the sheet was declared cost; check one against an invoice), possible duplicate (two rows look like the same item; approve both and they become one rate with two observations, or reject one), trade guessed, other heading (the row sat under a heading that does not fit it), unclear (the description lost part of its spec), far off its neighbours (the price is many times the others for the same thing; check it against the sheet).

Three warnings are serious enough that a row goes in only when you approve that row itself: fee scale (a fee priced against the contract value, read as a rate), wrong kind of unit (a counted thing, like a door or a pier, priced per m² or per metre) and no price. And when you add rows to the book, each new rate passes the same check as a rate you type on Rates: a row it refuses (book's check refused: a name that does not say what the item is, one that carries a room or job, or a lump nobody confirmed) stays on Imports with the reason under it. Approve it again to accept the tidied name it offers, or a lump as a fixed allowance; otherwise reject it.

Import a cost plan from Buildxact

If you priced in Buildxact, one upload brings your whole cost plan across: its categories, your rates, its layout and your estimating notes.

  1. In Buildxact, open the estimate you use as your template and export it: Estimate → Export → Estimate items, as Excel.

  2. On Imports, press From Buildxact and choose the file. Nothing changes yet.

  3. Base shows four parts, each with a tick box:

    • Cost codes: each category becomes a code, numbered 01, 02… in its order, with the trade read from its name. Your other codes stay as they are unless you tick Also turn off my cost codes that are not in this file. If the only other codes are the starting set Base gave your business, the box reads Turn off Base's starting cost codes, so only yours are used and comes ticked; untick it to keep them.
    • Rates: every priced line, ex GST. Cost-planning lines keep what they are measured over ("over floor area, under 300 m²"), an allowance with no unit becomes a price per job, and a provisional sum is marked PS. The same line repeated in several categories becomes one rate.
    • Estimate template: the categories and lines, with no prices. Give it a name.
    • Rules: your notes ("Measure the tiling and allow 10% for waste") as rules for you to confirm.
  4. Check the lists under each part. Quote totals left out lists lines like "Windows as per Smith Glass quote # dated": one job's quote left in the template, not a rate. Tick any that is really a standing allowance. Not imported as rates shows the headings, the lines with no price and the repeats.

  5. Untick any part you don't want, and press Import.

  6. The rates appear on Imports to approve, like any spreadsheet. Nothing prices an estimate until you approve them. The rules wait on AI Memory → Decide for you to keep or drop.

  7. On Imports, press Import from Project.

  8. Pick a completed job. Its approved lines are listed, de-duplicated; tick the ones worth keeping.

  9. Import. They arrive as historical evidence, seen once, so they still need a second sighting before they trust themselves.

Keep a supplier's prices current

  1. Each supplier's list is its own tab on Rates, with its row count and the date of its newest price. A tab is marked stale when no price is newer than a set number of days; the tab says how many.
  2. Re-upload the list through Imports and approve it the same way. The newest price date on the tab moves, and earlier prices stay as evidence.

Set labour rates

  1. On Labour rates, pick the category and whether it is your internal crew or a named subcontractor, enter the $/hr (cost), and save.
  2. Organise with AI cleans descriptions and units, seeds categories from your rates and asks internal-versus-sub per rate.

See how much the book prices on its own

  1. On Match test, start a test over the jobs you pick. Every priced line is replayed through the matcher and lands as verified, check, unit-blocked, gap or genuine lump.
  2. Check matches walks you through a sample of fifty: right, close, wrong, nothing fits, or pick the right one. Your verdicts are recorded.
  3. Missing rates turns the gaps into a list of what you keep pricing that is not in the book. For each, create the rate (Base suggests, tests and creates it), send it to Imports, treat it as a one-off, or ignore it.

Check whether your book is fit to price from

  1. Ask the assistant: "Is my rate book any good?" or "Why are my prices off?". It checks every rate and answers with a score (how many rates you could price from without looking twice) and the problems that make estimates wrong, worst first. Those problems are: a door or a pit priced per m², a price no real rate reaches, a fee scale stored as a rate, a rate that includes labour but isn't marked that way (so labour gets added twice), prices far off their neighbours, impossible labour hours, duplicates, and the AI's guesses.
  2. Say "let's clean it up". The assistant takes a snapshot first, then goes through the problems one kind at a time. It shows you the rates, says what it would change, and changes nothing until you say yes. A wrong unit is fixed by asking you what the figure was really for, never by dividing it.
  3. It also suggests clearer names. A rate is found most reliably when it reads thing, then what changes the price, then the scope: "LED downlight 10W — supply & install", not "Supply & install 4x downlights to Level 2". Rooms, levels, schedule codes and counts belong on the estimate line, not the rate.

Control what the AI does with rates

  1. On Settings, Record AI-estimated rates decides whether a rate the assistant guessed is saved into the book, marked as a guess. Use AI rates in estimates decides whether those guesses are offered when matching.
  2. Remove AI-proposed rates deletes every guess in one go. Rates a person confirmed or imported are untouched.

Go back to an earlier book

  1. Book history on the Match test tab lists every snapshot. One is taken before every import commit, bulk delete and match test, and Take a snapshot makes one by hand.
  2. Open a snapshot to see what changed since, and restore it. Every deleted or changed rate is kept for 400 days.

What happens on its own

  • Every rate you confirm or correct while reviewing an estimate is recorded as an observation against the book, with who did it and on which job. This is the primary way the book grows. Ten reviewed estimates make a better book than any spreadsheet.
  • A confirmed rate is ranked above an AI-proposed one when matching. Confirming is what promotes a number to trusted.
  • A big import goes into the book in the background. Adding a few thousand rows takes longer than a page can wait, so after a short while the batch shows Committing… and Base carries on without you; leave the page and come back. If it is interrupted part-way (an update, say), Base picks it up again within about ten minutes, and never adds the same row to the book twice. An import left unfinished for more than a day is not finished on its own: it goes back to Imports for you to commit again.
  • When an import has finished tidying, prices far off the rest of the same thing in that file (or in your book) are flagged far off its neighbours for you to check.
  • Before the assistant adds a rate, it checks that the next estimate will actually find it. It tests the rate against the line it came from and a few other ways an estimator writes the same item, through the same matching the estimate uses. If your book already has the item under other words, it tells you and offers that rate instead. If the name it was given wouldn't be found, it saves the rate under a clearer name that is found, and tells you the name it used. If no clearer name helps, it saves the rate and tells you which wording would miss it.
  • Everything here can be driven from chat: attach the file and say what it is, ask how an import is going, approve a trade by name, ask which suppliers are stale. The assistant will not copy rows straight into the book, and will not approve them for you unless you say which.

Things that surprise people

  • The book deliberately does not learn from its own suggestions. Only rates a person confirmed, or real observations from a job, move it. Guesses are marked as such and ranked below anything real.
  • A rate that has not been used in a year wears its tight badge with less authority than it looks. Check when it was last confirmed before leaning on it.
  • Rates are indicative for built items like joinery. Those are priced from their bill of materials, with the rate as a sanity check.
  • Archived and discontinued lines on a supplier's sheet come in too; the importer does not read an "archived" column. Reject that group at review or trim the sheet first.
  • Approving a whole trade, or asking the assistant to approve everything, leaves every row with a warning where it is. That is on purpose: a few thousand warned rows once went into one customer's book in a single click. Ask the assistant to approve the flagged rows too if you have checked them, or approve them row by row.
  • A sheet's Sub-Contractor column that just repeats the Total is not counted as a part of the price. Only a labour figure makes a rate all-in.
  • An import holds a price no real rate reaches until you approve that row itself: over $5,000 per m², metre or m³; a removal over $400 per m²; one tree or plant over $25,000; under $1 per m². These are almost always a whole job's figure, or a price for each, read as a unit rate. If yours really is that price, approve the row by name.
  • A note in a Buildxact cost plan that carries a price ("skip bins on a big renovation, about $15–18k") does not become a rule: rules never hold prices. It comes in as a rate instead, at the middle of the range, and the import says so.
  • Importing the same Buildxact file twice stages its rates again for you to review, and replaces the template of the same name rather than adding a second one.
  • The Estimating rules tab is read and delete only. Reword a rule by asking the assistant; delete one here to stop it being used.
  • The Estimating rules tab belongs to the AI Adaptions module, not the Rate Book. Without it the tab says the rules are not switched on for you. The assemblies the floor plan suggests come from the Rate Book too, so the plan's quantities panel says so when the Rate Book is off for you.
  • The estimate — where rates are confirmed and corrected
  • Contacts — the suppliers whose price lists become books