In this guide
Tenders
Invite subcontractors, compare responses, award a package.
What it is
Where trade packages go out for pricing and the responses come back to be compared. It is what turns your own guesses into real prices before you commit to a number. The board opens on who has priced and who has gone quiet: each package (an estimate section) with the subs invited, what each has done with the invitation (not sent, awaiting, opened, quoted, awarded, declined), the quotes due this week with nothing back, and anyone still pricing from an old set of drawings. Estimators run it before the quote; project managers run it after the win.
Tendering happens on both sides of the client decision. Before you quote, it is pricing, so your number rests on real trade prices instead of your own build-up. After you win, it is engaging.
Before you start
- The Subcontractors module is on (Settings → Team modules). Without it the tab is hidden, and opening its address says Subcontractors is not switched on for you.
- Inviting, adding a tenderer, sending an updated tender, cancelling and sending new drawings need Subcontractors → Invite & issue. Preparing a package's scope needs Subcontractors → Edit. Carrying a tendered price onto the estimate needs Estimating → Edit too.
- The estimate has approved lines in the section you are tendering; the scope is derived from them.
- The subs you invite are businesses in Contacts with the subcontractor role and an email. One can be typed in on the spot and is added to Contacts when you send.
- A written scope of works for the trade makes a better package. The board says "no scope yet" against a trade without one; see Scope of works.
How to
Put a package out to price
- Press Tender a package and pick the section. A section already out is marked, so you do not send a second round by accident.
- Scope lists the section's lines. Untick a line and it moves under "excluded from this tender", the document renumbers and the money moves; a line that silently vanished would be priced by nobody. Take the dollar figures out of the scope wording if you do not want them seen; PC sums and provisional allowances are left alone.
- Invite & send picks who prices it (filter to compliant subs or those with an address), when prices are due back, and what is attached, including the current plan set.
- Check From above the email. It is your own Gmail or Outlook address, or Base's address when the invitation goes from Base. When it goes from Base, a note under the email says so: an admin can press Send from my Gmail (or Outlook) there to switch on Business emails for the business; anyone else is told where the switch is. Keep sending from Base hides the note.
- Send. The invitation goes by email with the scope and drawings and a link to the tender portal. Replies land here, whether they come through the portal or by email.
Ask the assistant to put a package out
- In the chat, ask it to invite subs to price a trade, for example "invite three sparkies to tender the electrical". It sends the trade's scope of works word for word: the approved scope, or the trade as confirmed on the Scope page. If the scope is still being written, or the trade is drafted but nobody has confirmed it, it waits and tells you what it is waiting for.
- When Let the AI send email without review is off (Settings → Integrations), it prepares the invitations instead of sending them. They show on this board as Ready to send, and the chat shows each email as it will go, with Send invitations.
- Press Send invitations in the chat, or Send invitation… on a sub's row here. When they would go from Base's address rather than your own, the chat card says so above the button, with the same choices as the send screen. It goes exactly as if you had sent it from this page: the same email, the tender portal link, and replies that land back here.
Chase what is due
- Chase today lists quotes due this week with nothing back. A chase is a text now plus a follow-up email that threads onto the original invitation with the portal link and plan set attached; the page shows the words before you send.
- Press Text + email all, or Chase one sub from the list. A sub's own row has Chase · text + email for the same thing.
Keep everyone on the current drawings
- When the plan set changes, the board says how many contractors are not on the current drawings, and names the set it counts as current. Their prices answer an older question.
- Check the name is your drawings, then press Send everyone the current set. Each gets the new set on the same tender link and thread. Only contractors whose invitation has gone out get it: an invitation still waiting for you to press Send carries the current set when you send it.
The current set is the newest PDF on the job that is drawings. A quote, invoice, BOQ or scope you dropped into a chat on the job is never taken for it, however recently it arrived.
Add a quote that came in outside Base
Use this when you asked a sub or supplier for a price yourself, by email, phone or on paper, and the quote never came through Base.
- On this page, drop the PDF (or a photo of it) on Got a quote from outside Base?, or press Upload existing quote. From the estimate, open a trade's menu and choose Upload existing quote…; the trade is filled in for you. You can also drop the PDF in chat and ask the assistant to add it to the tenders.
- Base saves the file in the job's Quotes folder and reads it: the business, the price ex GST, the trade it prices, and what it includes and excludes. This takes a few seconds, up to half a minute for a long quote.
- Check what it found and fix anything that is wrong: Trade, Business (from Contacts, or a new business), Price ex GST. If the quote shows a price including GST, Base says what it records ex GST. If it could not read the quote, fill the fields in from the quote yourself.
- Leave Carry this price onto the estimate ticked to use it straight away, at the job's subcontract markup, or untick it to compare it with other prices first. Press Add to tenders.
- The quote joins that trade's package beside any tenders sent from here, reading Quote received outside Base. If the same business already has a tender for that trade, its price is updated instead of adding a second row.
Compare the responses
- Open a sub's row: what has happened (the timeline), what they said, and what you can do. Under it is everything Base found out: ratings, a summary, strengths and concerns, their public profile line (in amber when something does not line up), and their internal track record with you, which they never see.
- Submissions are levelled against the estimate's sub scope, so you can see who has left something out rather than only who is cheapest. A cheap price with a section missing is not a cheap price.
- Under each tenderer, Conversation shows every email both ways, including a colleague of theirs who answered. Write in the box, add files with Attach (from this job, the rest of Base or your computer) and press Send reply; Reply and Request more info take you to it, and Draft with the assistant writes one for you to check. Their next answer comes back to this tender. Open in Comms opens the same conversation there.
- The row says where the conversation has got to: Has a question, Not pricing, Replied, Pricing it, Info requested or Answered. Base reads this from the newest message. If it read one wrong, pick the right one from the menu beside Conversation; your choice stands until the next message arrives.
- Send updated tender… goes on the same link and thread, labelled as the next revision, with what changed listed in the email.
- Ask Base to compare writes the cross-tender comparison and a recommended award for the package; Rewrite the comparison does it again once more prices are in.
- To hear it instead of reading it, press Listen beside Comparison: it reads the write-up, each tenderer's line of the price table, then the points to watch. A sub's row has its own Listen beside Base's take, which reads their summary, strengths and concerns. While it reads, the buttons beside it pause, stop and change the speed (1× to 2×, remembered on this device). Starting one stops any other that is playing.
Carry the trade price into the estimate
- Each package's header shows the best price back (or the agreed one, once awarded) and how far it sits from what the estimate carried for the subcontracted part.
- On the reply you choose, press Use in estimate, or expand it and press Use this quote in estimate under Estimate & award. It uses that reply's price, never an automatically chosen cheapest quote. Carrying does not award the tender. A reconciling line adjusts only the subcontracted scope; your take-off and material you or the client supply stay intact.
- If the job has a subcontract markup (set on the estimate), the trade's price sells at it, and the coverage row and the expanded reply (under Estimate & award) say so before you carry it: "Sells for $X — the trade's price at your 28% subcontract markup". Hover Use in estimate to read the same sentence. If the business has a usual subcontract markup and this job has none yet, the first price you carry sets it on the job and the message says so. With no markup set, the price sells at the section's margin.
- The chosen reply reads Carried in estimate. Stop carrying removes its adjustment and restores your own build-up without withdrawing an award. On another reply, Use this quote instead replaces the carried price. If the same tenderer changes their figure, Update carried price applies the new amount. An awarded reply uses the agreed award amount.
- Once the job is won, the carried price is locked and these controls become read-only. The budget remains the plan against which the trade's actual cost is measured. Older emailed carries whose source was not recorded have Stop carrying previous price in the package header before the win.
Expanded replies group their actions into Estimate & award, Correspondence, and Manage invitation. Replying and asking for more information stay visible; updating or resending an invitation, declining and cancelling sit under Manage invitation.
Award a package
- Press Award tender… on the sub. Enter the awarded amount (ex GST). Before the job is won, Also carry onto the estimate is ticked, so the estimate's section takes the agreed price and the quote you send is built on it. Awarding at a figure the tenderer did not give needs a reason, and the override is recorded on the board. Set retention, how they are Priced (a lump sum, or day / hourly rates paid on the hours they sign in on site), how they are paid (on invoice, deposit then balance, or in full before supply) and payment terms.
- Read the identity and track-record warnings. A serious one needs a tick to go ahead.
- Confirm. On a won job the award raises an issued purchase order that counts in committed cost from that moment. Issue purchase order… sends the paper, a separate deliberate step; once sent the button reads Open purchase order.
- Decline… the others (they come off the site sign-in list unless they hold another package). Withdraw award… frees the package for somebody else.
Add a tenderer to a round or cancel one
- Add another tenderer invites another business to the same round with the same scope, attachments and plan set. Pick one from Contacts or type a new one.
- Cancel invitation… cancels one invitation, or the whole round. Invitations that never arrived are cancelled without a notice.
Book a tender briefing
- On a package with a round out, press Book a briefing.
- The New meeting dialog opens as a tender briefing on this job, with every business the package went to on it — not the invitations that were cancelled or declined. Pick the time and the place (the site for a walk-through, or an online link) and press Send invites.
- Each tenderer gets a calendar invite of their own that lists only you and them, so nobody sees who else is pricing. The briefing goes on your Calendar.
What happens on its own
- Replies to the invitation email are read and the quoted amount is recorded against the send, with the quote attached to the email. A quote uploaded on the tender portal lands with its files.
- The tender review agent rates each submission, writes the summary, strengths and concerns, and a cross-tender recommendation per package. It recommends; a person awards.
- A sub's public profile is researched once in Contacts and reused here, so a business is checked once, not once per quote.
- Awarding while the job is still quoting records the price and adds the sub to the team but commits nothing. When the job is marked won, their purchase order is raised at that price for you to issue. You do not award it again.
- A client quote that lists every line never shows a carried price as its own line, or the sub's name. Their price is spread across that trade's lines, and the section total is the same.
- Awarding a package puts the company on the job's programme tasks for that trade that nobody holds yet: its site work, workshop work, orders and drawings. Tasks already given to someone else, work you planned to do with your own crew, and milestones are left alone. Declining an awarded tender takes the company off that trade's open tasks again.
- Prepare every scope drafts a full scope of works (inclusions, exclusions, interfaces, plan references) for every trade on the estimate before it goes out.
Things that surprise people
- Read the levelling before the totals.
- The column names (Tenderer, Status, Waiting, Price, vs plan, Plans held, Last chased) sit over the first package only. Every package below lines up under them. The links to the job's Estimate and Scope of works are under the page title.
- An award made from chat, or a tender awarded before the win, raises its order with nobody in a dialog to send it. The board shows the order as unsent until someone presses Issue purchase order….
- A section's own menu on the estimate says Tender invitation; it opens the same two-step invitation as Tender a package here.
- Chasing is a text plus an email, and the text goes now.
- A quote you added from outside Base is never emailed by Base: no chase, no updated drawings, no "unsuccessful" notice if someone else gets the work, and no cancellation notice. You arranged that price yourself, so you tell them. It is still reviewed and compared like any other.
- An invitation marked Ready to send has not reached the sub. The assistant prepared it, and it waits for somebody to press Send.
- An invitation sent from Base's address has your name in it, and pressing Reply reaches both you and this board. But if the sub's office forwards it round before answering, the forward loses that, and the reply can go to Base's address instead of you. Sending from your own mailbox (the From note above) closes the gap.
- The assistant never writes a tender invitation as an ordinary email. An email like that would put nothing on this board, and the sub's reply could not come back to it.
- A tender invitation from a practice job asks you before it goes, and anything attached to it is marked PRACTICE — NOT A REAL DOCUMENT. The assistant asks you too, and an automation never sends from a practice job.
Related
- Scope of works — the trade scope the invitation carries
- The estimate — the section a package is cut from
- Contacts — the subcontractors and their track record
- Portals and links — what the sub sees on the tender portal