In this guide

Scope of works

Per-trade scope, versioned, reviewed with the assistant.

What it is

What each trade delivers, what it touches but does not include, and anything the estimate has not priced, written trade by trade from the approved estimate and the drawings and approved as numbered versions. The client's scope of works document, tender scopes, purchase orders and the quote's inclusions are cut from the approved version. Until there is one, those documents list the estimate lines. Estimators and project managers use it; the assistant drafts and redrafts it.

Four tabs. Trades is the working draft, one row per trade, each item tagged priced (traces to an estimate line), implied (follows from one) or gap (nothing prices it). Gaps is where gaps are decided. Whole job holds the sections that are not one trade's, including the responsibilities matrix. Versions is the history and the approve button.

Before you start

  • The estimate has approved lines; the scope is built from them.
  • Drawings are on the job's Documents, so the draft can say what each trade touches.

How to

Start the scope

  1. Press the generate button on the empty scope to have Base write the draft, or Start scope review in chat to build it trade by trade in conversation. Either way a draft lands for every trade on the estimate.
  2. Each trade's row opens to its items. Search across trades, filter by status, and group by status.

Decide the gaps

  1. Open Gaps. Each is something a trade would expect that no estimate line prices. The list opens on Undecided, so a new gap is at the top of what you see; press All to see every gap, decided ones included.
  2. Pick a decision on each: Include or Add to estimate put the item in the trade's scope; Exclude, By others and By the client list it under "Not in this trade"; Not needed drops it.
  3. When none of those says it, press Other… and write your answer. It goes into the trade's scope under Clarifications, so whoever prices the trade reads it.
  4. A gap you decide turns green and shows what you picked, and stays where it is until you switch between Undecided and All or leave the tab. Add detail puts a line of your own with any decision, such as "only the two front windows", and the detail goes with the item into the trade's scope. Change opens the decisions again. When every gap is decided, Show all brings the decided ones back.
  5. Where a gap says "refer" and a drawing number, press the number. That sheet opens beside the gaps, at its page. A number that is not found in the drawings on file stays plain text.
  6. A trade cannot be confirmed while it has an undecided gap; the trade row says how many are left.

Redraft a trade with the assistant

  1. Open the trade row and type what to change ("include the fire collars", "move the demolition to the builder") under Redraft with Base, or pick a quick prompt, and press Redraft.
  2. Base redrafts that trade in the background. The rest of the scope is untouched, and you can leave the page while it works. The trade's items update when it finishes.
  3. Base's reply, and any question it has about a gap, is in the scope review thread. Press Open thread to read it in the chat.

Confirm the trades

  1. Press Confirm on a trade whose items read right. Confirm ready confirms, in one go, every drafted trade that has something in scope, no undecided gap and every approved estimate line of the trade covered by an item.
  2. A trade with nothing in scope cannot be confirmed: no priced or implied item, only a summary, or only gaps decided out of the trade. Its row reads Nothing to confirm where the Confirm button would be, and opening the row says why. Press Complete scope to have Base draft it, or ask for it under Redraft with Base, then confirm it.
  3. A trade that is marked confirmed but holds nothing reads Nothing in scope on its row. It blocks approval until it is drafted and confirmed again.
  4. When the estimate or the drawings have moved since a trade was drafted, its row says so. Review these trades sends every out-of-date trade back into the review.

Approve a version

  1. The strip reads "Ready to approve" or "N to clear". Versions lists what still blocks approval.
  2. Press Approve. The draft is frozen as the next numbered version with a summary of what changed. The scope document, tender scopes and purchase orders cut from now on use it.
  3. Switch between Draft and Approved to read a version as it was approved. Load into draft copies an earlier version over the working draft; the approved version is untouched until you approve again.

What happens on its own

  • Items are tagged from the estimate: a scope item that traces to an approved line is priced, one that follows from the lines is implied, and anything else is a gap for a person to decide.
  • Check for changes re-reads the estimate and the drawings and marks what has moved, so a trade confirmed against last week's drawings is flagged rather than trusted. A confirmed trade with an approved estimate line that none of its items covers is marked out of date too.
  • Carrying a tendered price onto the estimate adds an adjustment line under that trade, and the scope checks itself straight away: a confirmed trade the line lands under is marked out of date until an item covers it. Reverting the price checks again.
  • Generate scope and Complete scope write every trade that has no items, even one with a summary or one marked confirmed. A trade with any item in it, even only a gap, is left as it is.
  • The quote's inclusions, the scope of works PDF, tender invitations and purchase orders read the approved version. A draft changes none of them.

Things that surprise people

  • Confirming a trade is not approving the scope. Confirm says the trade reads right; approve freezes the whole draft as a version.
  • A gap decided as Add to estimate does not add the line for you; it records that the item belongs in the trade's scope. Add the line on the estimate.
  • Approving is blocked by an undecided gap, an unconfirmed trade, a trade with nothing in scope or an approved estimate line no item covers, and Versions says which.
  • A summary is not a scope. A trade can have a paragraph saying what it delivers and still hold nothing, and then it cannot be confirmed and does not reach the scope of works document or a tender.
  • Confirm ready leaves out a trade that misses one of its approved estimate lines, because it would block approval the moment it was confirmed. That trade's own Confirm still works, and hovering it says how many lines are missing.
  • An answer or detail that names a price is refused. Prices live in the estimate, and the detail goes to the people pricing the trade.
  • A drawing opens on the page whose title block carries that number. When a number only appears as a reference on other sheets, it is not linked rather than opened on the wrong page.
  • Reading the approved version is read-only. Switch back to Draft to change anything.
  • A project has one scope review thread, not one per trade or per version. Open thread on any trade and Continue review at the top open the same conversation.