In this guide

The estimate

The ledger: sections, lines, rates, hours, margin, and the AI building it from plans.

What it is

The priced job, line by line, grouped into trade sections, and the gate you keep over it. Base reads the drawings and drafts the estimate; every line it writes lands marked pending, and nothing pending reaches a client or a subbie. Not the quote, not the bill of quantities, not a purchase order, not a tender. Approving a line is what makes it real, so your review is the gate, not a formality.

Every line carries its evidence: which sheet it was read from (the crosshair opens the drawing with the item boxed), why it exists, and where its price came from. Every rate you fix teaches your rate book. The first estimate you review is the hardest; the tenth mostly prices itself from rates you have already confirmed.

The masthead shows the sections, lines, provisional sums and low-confidence lines, the project margin and labour margin, the blended margin where sections differ, the sell price ex or inc GST, gross profit and the net after overhead recovery. Everything downstream of this page is generated from it: the quote, the budget, the schedule of values, purchase orders and tenders.

A few words, translated. Take-off is the assistant reading the plan set and proposing priced lines a trade section at a time. Approved means the line can appear on quotes, purchase orders and tenders; pending means visible only to you. A provisional sum is carried at an allowance and listed separately on the basis of estimate. Supplied by says who buys the material and who does the work, which changes the money and what lands on a sub's purchase order. An inferred line is one the assistant added from experience rather than a document; it says why. A line with a red check chip failed an automatic scale check (hours entered per unit instead of in total, for example). A discount is money off the price you agreed with the client: it comes off the quote and the contract, but it carries no cost and no margin and never becomes a budget line.

Before you start

  • The drawing set, the spec and any contractor quotes are on the job's Documents. The assistant prices what it can see; a missing mechanical drawing is a missing mechanical section.
  • Rates come from the rate book. Rules about how you price are told to the assistant in chat and remembered.
  • Once the job is marked won the estimate is locked. Read Mark the job won before you do.
  • What you can do here follows your Estimating settings under Settings → Team Modules: Edit to change lines, sections, margins, take-off boxes and the scope; Approve lines to approve drafted lines; Send quotes to produce or send the quote. Everyone starts with all three; the Builder role starts without them, so a builder can read the estimate but not change it.
  • A few parts of this page follow other modules. The Crew chip needs the Crew Roster; without it the chip says "not switched on". The build breakdown and the 3D view under a joinery line need Design or Manufacturing; without either they do not appear. The signed-quote check in the Mark won window needs CRM; without it the window shows no check.

How to

Have Base build the estimate from the plans

  1. Upload the full drawing set to the job (see Documents), then ask in chat in plain words: "price this fitout from the attached plans". Add what you know: "client supplies the joinery, we self-perform demo, sparkies are $95/hr". Anything you say about how you price is remembered for every future job.
  2. Let it finish before you touch anything. Sections land in the ledger as they are priced, marked pending. Correcting a section mid-run can collide with the section still being written.
  3. Review it, then set margins, then produce the paperwork.

Work through the plan check

  1. When a plan check has run, press Open plan check on the Plan check strip above the estimate. The questions are on the left, the one you are on is in the middle, and the drawing it is about is on the right, opened at the spot.
  2. If you know the answer, type it, or press a quick answer such as As drawn or Not in our scope, and press Save answer. It goes on the job's RFI register, the assistant uses it from then on, and the next open question comes up.
  3. To ask someone, pick who it goes to and press Send. Their answer comes back onto the question. Press Someone else for anyone not on the list.
  4. If a question does not matter for this job, press Not needed. You can find it under Not needed and press Bring it back.
  5. To deal with several at once, tick them (or press X on each) and use the bar at the bottom of the screen. Everything going to one person goes in one email.
  6. Press Suggest who answers for a suggestion on each question. Nothing is sent. By drawing groups the questions by sheet, and the arrow keys move through them.
  7. Press Estimate at the top to go back.

Review where the money is

  1. Read the Sheet coverage register first. Every document is a group of sheets; a sheet that priced nothing is marked, and documents that produced no lines at all are listed underneath. A title sheet pricing nothing is normal; a services layout pricing nothing is a missed trade. Open each, look, and sign the sheet off either way. The "unsigned only" filter narrows a big set to what still needs eyes.
  2. The strip above the table says how few lines carry about 70% of the money and lists the biggest movers, sized by value and how uncertain their rate is. Click a chip to land on the row. Risk order re-sorts each section so the lines that could move the estimate most come first, pending ones on top.
  3. Read each section header's labour as a duration. A duration that feels wrong for the trade is an hours error.
  4. Counted lines carry one box per item on the drawing; click the crosshair and count a couple of the big ones.
  5. A tinted rate sits off your book; its tooltip says by how much. Red on a big line means below book, which is the estimate quietly losing your money. A dotted underline means no book line at all; the assistant's stated basis is in the line's details.
  6. Open the details of every amber inferred line and read the one-line reason. Keep it, fix it, or delete it. This is the highest-judgement minute of the review.
  7. Lines with a red check chip each need their own look and their own tick.

Approve lines

  1. Click the hollow ring at the left of a pending line to approve it; it becomes a tick. On the keyboard, click any row then use the arrow keys to walk the lines, a to approve the focused line and step on, Enter to open its details, e to edit it, Delete to delete it, N to add a line, and Escape to abandon a cell edit. The keys are listed under the ledger, and along the bottom of the window while that list is out of sight.
  2. Lines priced from your book with a tight band and three or more observations, sitting on the book and flagging nothing, collapse into a looks safe batch. Spot-check the three it offers, then approve the batch.
  3. Approve a whole section, or the whole estimate, from its header. Bulk approve skips any line with a check chip on purpose; the server tells you how many it left.
  4. To approve some lines and not others, select them (see the next section) and press Approve on the bar that appears, or press a.

Work on several lines at once

Select lines the way you select files on your computer, then act on all of them together.

  1. Click a line, then hold Ctrl (⌘ on a Mac) and click more lines to add them. Ctrl-click a selected line to take it out again.
  2. To select a run of lines, click the first, then hold Shift and click the last. Ctrl+Shift-click adds a second run to what you already have. On the keyboard, hold Shift and press ↑ or ↓.
  3. Ctrl+A (⌘A) selects every line the ledger is showing. With a filter or a plan page on, that is only the lines you can see; folded sections are left out. Space adds or removes the line in focus.
  4. A bar along the bottom of the window shows how many lines you have and what they cost together, ex GST. It stays in view as you scroll. From it:
    • Approve approves the pending lines in the selection. A line with a check chip stays pending; tick it on its own row.
    • Cost code gives them all one cost code.
    • Who supplies sets who supplies them all: a subcontractor, you, the client or your own crew.
    • Move to section moves the lines to the end of another section.
    • Delete deletes them once you confirm. The Delete key does the same.
  5. More holds the rest:
    • Mark as provisional sums, or Make firm when they all already are.
    • Set labour $/hr… puts one labour rate on the selected lines that have hours.
    • Change quantities by %… and Change material rates by %…: type 10 to add ten percent, -5 to take five off. Your rate book learns from changed rates like any rate you type, so for a risk allowance use contingency instead.
    • Scope group… puts the lines under one scope, such as Stair 01 or Level 2. Leave it empty to take them out.
    • Room… says where the lines are on the job, such as Kitchen or Ensuite, in the drawing's own words. Job-wide lines like measure, drawings and delivery go under General. Leave it empty to take them out.
    • Show on the quote as one item… gives them one line on the quote at their own price (see Show a line separately on the quote).
    • Raise a purchase order and Send to tender open the usual screens with exactly these lines. Lines from several sections go out under the section carrying most of their value.
    • Copy to a spreadsheet copies them as rows you can paste into Excel: section, description, qty, unit, rate, hours, $/hr and total. Ctrl+C (⌘C) does the same.
    • Duplicate into a section copies the lines to the end of that section, prices, codes and supply included, for a repeated room.
  6. Press Esc, or the cross at the end of the bar, to clear the selection. A plain click on a line clears it too.

Every one of these goes on Undo as one change, except approving and the order and tender screens. You can also ask the assistant about the lines you have selected: "what do these come to?", or "move these to Electrical".

Give a line a cost code

  1. Each section shows its cost code once, in its head after the cost: the code most of its lines carry. Pick another there to code every line in the section.
  2. A line shows its own code beside its description only when it differs from the section's. Point at any other line to see its code, or code when it has none, then click it and pick a code from your list.
  3. If other lines on the estimate look like the same kind of work, a box asks whether to give them the same code too. The likely ones are ticked: untick any that are wrong and press Set, or press Not now.

Changing who supplies a line on its supply chip asks the same about similar lines.

Read the estimate by your cost codes

  1. Above the first section, beside Collapse all, press Group by: Cost code. It shows once your business has cost codes (Settings → Cost Codes).
  2. The estimate now reads under your cost codes, in the order they are listed in Settings. Each code shows its number, name, how many lines it has and what they sell for.
  3. Under each code are the sections that have lines in it, each with its own head and margins as usual, showing only that code's lines. A section whose lines carry two codes appears under both.
  4. Lines with no cost code are together at the end under Not yet coded. Give them a code on the line, and they move to it.
  5. Edit, approve and move lines the same way as by section. Press Section to go back.

Base remembers your choice in this browser, for every job. It changes how you read the estimate, not the estimate itself or your quotes. To send the quote by cost code, set Group lines by in Document Studio.

Read the estimate room by room

Useful when a section is long — forty joinery units, a whole floor of tiling — and what you want to know is what each room comes to.

  1. Above the first section, beside Collapse all, press Group by: Room. It is offered once at least one line names a room; Base's take-off writes the room on each line as it reads the drawings.
  2. A strip of rooms appears above the estimate, each with a picture for the kind of room it is, what it sells for and how many lines it has. When there are more rooms than fit, an arrow appears at the edge of the strip: press it to move along, or press and drag the strip sideways. With a room selected, the left and right arrow keys move to the next one. Press a room to see only its lines; press it again, or All, to see everything.
  3. Inside every section the lines sit under a heading per room, showing how many lines it has, what they cost and what they sell for at that section's margins. Lines for the whole job are under General, and anything with no room is last, under No room.
  4. Press a room's heading to fold it away; its figures stay showing. Fold all on the strip shuts every room so you can read the subtotals alone; Open all brings the lines back.
  5. To put lines in a room, or move them to another, select them and use Room… in the selection bar. On the No room heading, Put in a room… does it for all of them at once.
  6. When the estimate has more than one section, press Cost by section and room above the first section. A table opens showing what every section costs in every room, with a total for each section, a total cost row and a row for what each room sells for. Scroll sideways for more rooms; the section names and the totals stay in place. Close it to go back to the estimate.

If you or your business has a trade focus, or the job is a joinery-only job, the estimate opens this way. Base remembers what you choose for each job in this browser; press Section to go back. It changes how you read the estimate, not the estimate. To send the quote room by room, set Group lines by in Document Studio.

Read a job of several apartments, houses or levels

When Base prices a job as several units (four apartments, six townhouses, each level of a building), every line belongs to one of them, and the estimate shows the units above the room strip.

  1. A row of chips lists the units, each with what it sells for and how many of its lines are approved, such as 3/23. All is the whole estimate. Whole job holds the lines that belong to no single unit: site measure, delivery, shop drawings.
  2. Press a unit to see only its lines, in every section. The room strip and the totals of each room heading follow. Press it again, or All, to see everything.
  3. To the left of the strips is a small picture of the same units as blocks: apartments and houses side by side, levels stacked. A block is green when all its lines are approved, amber when some are, and plain when none are. Press a block to pick that unit; press the space around them for the whole job. The picture shows the units and how far each has got. It is not a drawing of the building.
  4. A unit marked short came out well under the other units of its kind. On a job of matching apartments that usually means lines are missing from it, so open it and compare it with its neighbour before you quote.
  5. With a unit picked, Approve the lines left in that unit approves every line of it that is still waiting, in one press. Lines with a check still open are left for you to look at, the same as approving a section.

On a phone the picture is hidden and the chips do everything.

See and confirm what the joinery is made of

On a job with joinery, a strip above the units reads Finishes: a tile for the carcasses, the doors and fronts, the end panels, the fillers and kickers, and any feature piece such as an island. Each tile shows a swatch of the material, the board's name and how it is finished (board, laminate or 2-pac). A part that differs for one unit or room has its own tile, named for it. Hover over a tile for the board's full name and where it came from. Every joinery line is priced on these.

  1. Agreed beside it means a person said these finishes are right. Not agreed yet means Base priced on finishes it found on the plans or took from your usual boards, and nobody has confirmed them.
  2. If they are right, press Confirm these finishes. Nothing is repriced: you are saying the schedule the estimate already stands on is correct.
  3. To change one, ask Base in the chat, for example "what if the fronts were 2-pac?" or "Unit 3 is in a different oak". It shows what the change moves for each unit first, and reprices the joinery only when you say so, without taking the job off again.

Inspect joinery one unit at a time

For checking a section properly before you approve it: the unit itself, the drawing it came from, what it is made of and what it costs, on one screen.

  1. On a section, open its ⋯ menu and press Inspect one by one. Or open a joinery line's build-up and press Inspect to start at that unit. It starts at the first line still waiting for approval.
  2. The big view is the unit in 3D: drag to turn it. The small picture in its bottom-left corner is the drawing page the line came from. Press it and the two change places; press the small one again to change back.
  3. If the unit has no 3D model yet, press Create 3D model and Base builds one. It appears when it is ready; you can keep going in the meantime.
  4. On the right is What it's made of. The ticks along the top say whether the build-up has structure, edging, a finish, hardware and fixings. A dashed one has nothing in it: press it to add something, or use Add a missing part. Type what the part is, how many, and a cost if you know it. Leave Have Base add it to the 3D model and bring the line into step ticked and Base does both.
  5. Point at a part and press the bin to take it out of the build-up.
  6. To change a finish, press Finishes. The finishes you already have a price for come first, under In your rates; under them are common finishes at an indicative price per m², ex GST, for when your rate book has none; New finish names and prices one of your own and saves it to your rate book. Pick one and the panel shows what it does before anything changes: which rows of the build-up are renamed and re-priced, and what the line's material rate moves to. Press Use … and the build-up and the line change together. If the unit has a 3D model, leave the box ticked and Base puts the finish on every part that carries it; a unit with no model still gets its finish. A row measured in sheets when the price is per m² is renamed and keeps its price, and the panel says so.
  7. Along the bottom is the line itself. Change the quantity, the material rate, the hours or the $/hr right there; press Enter. The cost and what it sells for update beside them. Under the parts are two totals: the Build-up and the Line cost. The build-up is for one of the thing the line counts, so on a line for more than one (4 vanities, 19.5 m² of doors) it is shown each and multiplied out, and it is the multiplied figure that is compared with the line. If they differ by a dollar or more, the difference is shown.
  8. Press Approve and next. The bar across the top fills in as you go.
  9. ‹ and ›, or the left and right arrow keys, move between lines without approving. Esc goes back to the estimate.

Tell Base what to change. Under the big view is a box that says Tell Base what to change. Type what is wrong with the line on screen and press Enter:

  • "The box is on the bench, it should be the tall cupboard on the left" — Base looks at the drawing again and redraws the box.
  • "It has two soft-close drawers, add the runners" — Base adds them to what the unit is made of and brings the line's cost into step.
  • "That's 2 off, not 1" — Base changes the line.

What you asked and what Base answered stay in a short list above the box. While Base is working the list says so, and how much it has thought; only its answer is shown. Press Esc in the box to fold it away. You can carry on to the next line while Base works.

Read or answer in the full chat. The panel on the right has two tabs, Build-up and Chat. It opens on Build-up. Press Chat and the whole conversation with Base takes the panel's place, beside the line, so you can read everything it did, answer a question it asked, or attach a file. Press Build-up to go back. If Base asks you something from the list above the box, Answer in the chat swaps the panel to Chat for you. The tab you chose stays as you move between lines.

You can talk instead of typing. Press the microphone in the box, or with the wake word on (Ask Base) say "Hey Base, add soft-close hinges to this one" or "take the handles off". The chat stays out of the way; the top of the screen shows when Base is listening and when it is working, what you said appears in the list, and the unit updates when it is done.

If you reload the page, or send someone the address, the inspection opens again on the same line.

A section that is not joinery opens the same way with the drawing as the big view and the line along the bottom.

Read a line's money

Each line is two small sums that meet at the total. Read left to right:

ColumnWhat it is
qty, unitHow many, of what.
mat/unitMaterial for one unit. Labour is never in this figure.
mat amtMaterial for the whole line: qty × mat/unit.
hrsLabour hours for the whole line, not per unit.
$/hrThe labour rate.
labourLabour for the whole line: hrs × $/hr.
unit costWhat one unit costs with its labour: total ÷ qty.
totalWhat the line costs you before margin: mat amt + labour, which is also qty × unit cost.

For example, one fridge surround with $602 of material and 14 hours at $105: mat amt $602, labour $1,470, unit cost $2,072, total $2,072. At a 30% margin it sells for $2,693.60, which is the figure a quote that lists every line prints. Hover the total to see what the line sells for at its section's margin, and hover the unit cost to see its material and labour per unit.

When the ledger is narrow (a small screen, or the chat open beside it), each line folds: the description sits on top as a heading, in full, with its tags under it and the figures on a row beneath: "1 EA @ $602 · mat $602", "14 hr @ $105 · labour $1,470" and, when the line has labour, "unit cost $2,072/EA". In the wide ledger a long description runs to two lines; hover it to read the rest. To keep the folded view on a wide screen, choose Compact layout in the estimate's More menu.

When you add a line by hand with Add line, you enter the same figures: Material $ per unit, Labour hours, whole line and Labour $/hr. The line under the fields shows the unit cost and the line total as you type.

Swap a supplier price on a line

  1. On the line, press the $ button (or Pull supplier price in its menu). The list opens already narrowed to that line, with its words, unit and trade shown as pills, and the best matches at the top.
  2. Remove a pill to widen the list, add words, a size or a code in the search box, or pick one supplier. Show everything clears the filters.
  3. Press Use on a price. It opens in the rate sheet, where you choose how far the change reaches.

Fix a number

  1. Click a quantity or hours cell, type, Enter. Quantities are per-job facts and teach nothing.
  2. Click a rate. The rate sheet opens showing the line, the rate book item behind it, and every other line carrying that rate. Type the new rate, or press Use the rate-book figure, or Pick a price from your suppliers' price lists. Tick how far the fix reaches.
  3. Choose what happens to the book: leave it alone, update the item to the new figure, link the line to an existing item, or add a new item. A new item is quality-checked against the book before it can be created, with this job's rooms and codes taken out of its name.
  4. Save. The lines you ticked move, and the book learns.

Give the client a discount

Use a discount when the client pays less and you still build the whole job. If the price came down because scope came out, it is not a discount: change or remove those lines instead, so the cost drops with them.

  1. Press Add line and choose Discount.
  2. Enter the section (it defaults to Discount), the wording you want on the quote, and the amount off, ex GST.
  3. Press Add discount. The line shows a blue Discount tag and its amount in blue. The sell price drops by the amount. The cost and the margin on every other line stay as they were.

To turn a line already on the estimate into a discount, such as a negative line from an import, open the line, tick discount and save.

Once the job is won, a price reduction is a credit variation. Raise it on Variations rather than here.

Show a line separately on the quote

Some quotes give the client one price for the house and list a few extras on their own, such as allowances, tanks or a treatment plant. Mark those lines and everything else stays in the one price.

  1. On the line, press ▸ details (or the count there, such as ▸ 2 details) to open its details.
  2. Under On the quote, type the words your client should read, e.g. "Light fittings allowance to purchase (PC)". Click away or press Enter to save.
  3. To put several lines under one item, give them exactly the same words. A treatment plant priced as the plant, its design, the permit and its power circuit can print as one row. Lines in different sections can share an item.
  4. To put a line back into the one price, clear the box.

The quote then shows the rest of the job as one price, each item at its own price including GST, and the total, which is the same as before. Your quote template has to have a place for the items: see Document Studio. The line still sells at its own section's margin and nothing in the budget changes, so you can do this on a won job.

Keep an option on the estimate but out of the price

An option the client may add, or an item you have carved out, can stay on the estimate without being priced.

  1. On the line, open its ⋮ menu and choose Exclude from price.
  2. The line greys out with an Excluded tag. It leaves its section subtotal, the totals at the top, the quote and the bill of quantities, and the quote lists it under exclusions.
  3. To price it again, choose Include in price from the same menu.

You can also ask the assistant ("exclude the onyx option from the price"). On a won job this changes the price, so it is raised as a variation like any other priced change.

Put the lines in order

  1. To move one line, drag it by its handle to where it belongs, in its own section or another.
  2. To put a whole section in order, ask the assistant: "sort the joinery by code", "put every section in drawing order", or "B first, then MB, BP, K, J". By code means your item codes in their natural order: J01, J01a, J1.2, J2, and CW09a, CW09b, CW10. By drawing means the drawing reference (A2.1, A2.4, A3.1), then the page. It reorders the whole section at once.
  3. A level or a unit inside a section (its sub-group) stays together and is sorted within itself. Lines with no code, or no drawing reference, keep their order after the rest, and the assistant tells you which they are.
  4. To split a section into new ones, for example one per level, ask for it. The assistant moves each group of lines in one go.

Reordering never changes a price, so you can do it on a won job. Quotes, bills of quantities, RFQs, scopes of works and purchase orders print the lines in this order.

Undo a change

  1. Press Undo at the left of the toolbar, or Ctrl+Z (⌘Z on a Mac) when you are not typing in a box. Your last change on this page is taken back: an edit, a line you added or deleted, a section you cleared, a margin or contingency.
  2. To go back further, open the arrow beside Undo. It lists every change you have made on this page since you opened it, newest first. Pick one and it and everything after it are undone.
  3. A deleted line comes back exactly as it was, approval included.

Change who supplies a line

  1. Click the supply pill on the line and pick who buys the material and who does the work.
  2. Builder-supplied material stays in the estimate but is excluded from the sub's purchase order value and from their tender scope.

Set margins and contingency

  1. Type the project margin in the masthead. Every section inherits it unless it has its own.
  2. Set a labour margin to sell labour at its own rate; clear it and labour sells at the material margin.
  3. If you mark subcontractors' quotes up at their own figure, type it in subcontract markup in the masthead. It only applies once a section carries a trade's price from the Tenders page: that trade's price sells at this figure, and whatever you supply in the same section keeps the section's margin. Leave it blank and a carried price sells at the section's margin, as before.
  4. On a section header, override its margin or labour margin and set a contingency. A section carrying a trade's price also shows subs, so you can give that trade its own markup. Reset to the project global margin puts a section back.
  5. The blended margin on the masthead is the result across all sections. The forecast margin on Job Costs is measured against it for the rest of the job.
  6. A section's contingency is a percentage of its cost, added to its sell price. The quote, the priced bill of quantities and the job's value include it, spread over the section's lines in proportion, so the client never sees a contingency line and the lines still add up to the section.

Write the exclusions and read the basis

  1. Press Notes, exclusions & assumptions and write the exclusions and assumptions as the client will read them.
  2. Press Basis of Estimate. It rolls up the number, the documents priced, where the quantities came from (measured against allowed), where the rates came from (book against guessed), provisional sums, assumptions, exclusions, the lines that failed the scale check and the ten largest lines, with a signature block. Print opens it as a page to sign or save as a PDF.

Save and compare revisions

  1. Press Save revision snapshot before you send a quote. A revision is also taken automatically every time a quote is sent.
  2. Base takes its own revisions too, marked automatic and labelled "Automatic revision": the first when the assistant finishes building the estimate, then one about ten minutes after you stop editing, whenever the estimate has changed since the last revision.
  3. Revision history lists them. View one, compare one against now or two against each other, or Restore one as the working estimate. Restoring copies the stored lines and margins, never reprices, lands every line pending, saves the working estimate as a revision first, and is refused once the job is won or a quote accepted.
  4. Before the assistant makes a big change to an estimate that already has lines, it saves a restore point: a revision labelled "Restore point (Base) — before …", saying what was about to happen. It does this before a take-off over existing lines, before adding 20 or more lines, before deleting 10 or more, and before rewriting a section of 20 or more. It tells you it has saved one. To go back, open Revision history and Restore it, or ask the assistant to put the estimate back.

Bring in an estimate from a spreadsheet

  1. Press Import and choose the file. Base shows the sheet as it read it and lets you fix any column it guessed wrong.
  2. Tick whether label rows are section headings, where lines above your first heading go, and what to do with anything below your grand total (fees, not works).
  3. Your sheet's total is printed next to the total about to be written. If they match, the import is right. Lines land exactly as written; nothing is re-priced.

A negative row in the preview is tagged discount or cost saving. Base guesses from the wording ("discount", "reduction", "rebate"). Click the tag to switch it before you import. A discount comes off the price and keeps the full scope's cost. A cost saving is scope that came out, so the cost drops with it.

Ask subbies to price a section, or raise an order

  1. Open a section's menu. Tender invitation puts the section out to price; it is an enquiry, not a commitment. See Tenders.
  2. Upload existing quote… adds a quote you got outside Base, by email or on paper, to this trade's tenders. Base reads it, you check it, and you can carry it onto the estimate in the same step. See Tenders.
  3. Issue purchase order raises an order against the section. If orders are already committed on it, the menu says so and points you to the Tenders page instead.
  4. When a sub's price is carried onto a section (from the Tenders page, or ticked when you award), the section shows a green Carrying a tendered price panel under its header. It says whose price it is and what it replaces in your build-up, and what it adds to the cost and the sell. Open the tender goes back to the package, and Their quote opens the quote they sent. Your takeoff lines below are unchanged. The foot of the section reads your build-up, then the total at the tendered price.

Mark the job won

  1. Approve the estimate. Mark won is blocked while lines are pending and says "Approve the estimate first".
  2. Press Mark won. When the client has signed one of your quotes on a job still being quoted, every page of the job also offers Mark job won in a Quote signed banner; it opens this same window. The window first says what Base has. A job is won only on the signed paperwork: a signed contract or the client's signed quote, letter of acceptance or PO on the job, a quote of yours the client signed, or a contract quote they accepted on their portal. Until then the window shows The signed contract: choose Signed contract or Signed quote, acceptance or PO, press Upload the signed contract (or quote) for the PDF or photo, or press This is the signed one beside a document already on the job. Mark won reads The signed contract first until Base has it. If the job is won and the copy is still to come, press Win without it…: the window says why the signed contract matters, you can type why it isn't here yet, and Win without it turns the button into Mark won without it. The job then shows Signed contract missing — upload it. and its lead keeps a Get the signed contract follow-up until it is uploaded. Check the contract sum (ex GST): it is filled in with the estimate's price, what the client pays, so make sure it matches the quote they accepted. When the signed quote says what it was signed for and the job has no contract sum yet, the figure is filled in from it instead, and the window says the contract sum is taken from the signed quote. Then enter the date won, whether the contract is signed, the deposit, payment terms, retention and its cap, and the programme dates. Under The client's acceptance, press Attach the signed quote, LOA or PO to keep the client's paper with the job. Base reads the price and the PO number off it. On a job with no contract sum yet the price is offered as the contract sum, and when the price the client accepted is not the contract sum in the window, a warning says so before you win. Once the job is won the document is recorded on it: its PO number and price kept, and a price that still differs from the contract sum said in What Base did. It counts as the signed paperwork.
  3. Pick the Head PM: who runs the job. The list is everyone in your teams, grouped by team, then everyone else on your staff under Not in a team yet. Picking someone whose team is not on the job links it for you. Picking someone in no team adds them to the job's team when the win is saved; with two or more teams, an Add them to team list appears so you choose which, and the line under it names the team. Decide later leaves it. If the job has a head PM already, the window names them, and changing them is done on the job's Team page. If your business has no team yet, the window says so instead of listing anyone: make one on Teams, then name the head PM on the job's Team page. The win does not wait for it.
  4. Confirm. The job moves to pre-construction, the budget and schedule of values are built from the estimate, and the estimate locks.
  5. The window then lists what Base did and what to do next. What Base did includes the kick-off tasks it added. Draft purchase orders lists the orders the estimate's packages were drafted into (section, supplier or "no supplier yet", amount ex GST and the date needed by), with a link to Purchase Orders. Winning issues none of them. If your purchasing policy issues orders by itself (Settings → Finance → Automation), the ones within it are marked issues by itself within the hour, and Base sends those to the supplier on its next hourly run, so check them straight away; the rest wait for you. With that policy off, nothing is issued until you issue it. Under Next, Name the head PM comes first when nobody runs the job, and a line says how many subcontractors already on the job are not on the site sign-in yet. Switch on the PM agent for this job is offered last; it uses the AI, so it stays off until you press it.
  6. Then Assign subcontractors and crew: it opens the job's Subcontractors page, where you engage a subcontractor for each trade. Add your own people under Expected crew on the job's Crew & Timesheets tab. Each person needs a trade, because the site sign-in shows them the work of their trade and the diary and timesheets record who did what. Draft and send the contract and Set up invoicing follow. The job's guide, Where this job is up to, keeps that step unticked until every trade the programme needs in the next three weeks has someone on the job and everyone on it has a trade (see A job's dashboard and tasks).

Code uncoded lines with suggestions

A cost code is the bucket a line's cost is tracked under in the budget, the schedule of values and Job Costs. New lines get one from their trade as they are written. Older lines, and some lines in room sections, have none.

  1. When lines have no cost code, a line above the ledger says how many, with Suggest codes. Press it.
  2. Base reads each of those lines and suggests a code from your own cost-code list. The ones it is sure of come ticked. The rest show its best suggestion, unticked, with how sure it is.
  3. To change a line's code, open its picker. Its three likeliest codes come first, then the rest of your list, then Leave uncoded. Picking a code ticks the line. rule agrees means the trade rule that codes new lines picks the same code.
  4. A line Base found no code for (only a drawing reference, or work your list has no code for) starts on Leave uncoded. Pick one yourself or leave it.
  5. Press Accept to code every ticked line. Nothing changes until you do. If the job has a schedule of values that is not locked, the window says to rebuild it so its lines are grouped under the new codes.

Change a won estimate

  1. Change a rate, a quantity, the labour, add or delete a line, or move a margin as you normally would. Instead of saving, Base opens Raise as a variation and prices the change the way the estimate prices a line.
  2. Pick Client variation — they pay (a draft for the client to approve, added to an existing draft or a new one) or Absorbed — we wear it (its cost goes on the budget and lowers the margin; it needs a reason). A margin change can only be a client variation, because there is no cost to wear.
  3. Confirm. Then generate the variation document, send it to the client for signing, or open it on the Variations page. The estimate's lines stay exactly as they were won.

What happens on its own

  • When the assistant prices an estimate, its joinery is broken down as soon as the joinery section is saved: each joinery item becomes a unit with a bill of materials, made from the sheets, edging, hardware and hours the item was priced from. It does not ask first, and the estimate's prices do not move. No programme tasks or orders are added until the job is set up for production.
  • Every rate you confirm or correct is recorded against the rate book as an observation, with you as the source. A corrected rate can fix every other line carrying it in one go.
  • Sections the assistant commits replace that section. If one trade spans several drawing files, ask for it as one proposal, or the second file overwrites the first. The proposal history is kept.
  • Lines read off a drawing get their boxes on their own. Every symbol the assistant found on a sheet goes on the line with the same code or name, and a minute or two after a section is written, any line still without a box is looked for on its drawing. A line that genuinely has nothing to box, such as an allowance with no layout drawn, carries the reason instead. The assistant cannot call an estimate finished while a line on a drawing has neither.
  • A plan check of the drawing set runs in the background when the estimate is started from plans and sits above the ledger: whether the set was complete and consistent, what was missing that had to be assumed, and what to ask the client for. It never blocks anything.
  • The questions a plan check writes go into the RFI register as it finishes, numbered and addressed to nobody yet. Nothing goes to anyone until you raise, address and send them.
  • Running the plan check again keeps what you have done with its questions. A question it asked before keeps its RFI and number. One you have addressed, sent to the client or had answered is never withdrawn or reworded, and stays under Questions while it is open or answered, even if the new check no longer asks it. Only an RFI nobody has touched is withdrawn when the check stops asking it.
  • Once the assistant has finished an estimate, Base saves an automatic revision of it, then another each time you stop editing for about ten minutes and the estimate is different from the last revision. Reordering lines or editing notes alone does not make one.
  • Until the job is won, its contract sum follows the estimate. Within about fifteen seconds of a line, a margin or an approval changing, the job's value on the project page becomes the approved lines' sell (ex GST), and a lead linked to the job takes the same figure. Each move is kept in the contract sum history as "from the estimate". From the win the figure is the price the client agreed and no longer moves with the estimate.
  • The estimate does not chase the budget. After the win, the budget on Job Costs is rebuilt only when a person asks.
  • Winning the job the first time adds its kick-off tasks, however it was won: Name the head PM when nobody runs it, and Book the pre-start meeting when it has not started. Each is added once per job, and a job coming back from hold gets none; see A job's dashboard and tasks.
  • Notes, review ticks, plan boxes, coding and sort order can still be tidied on a won job; none of them carries money.
  • Lines the assistant writes land in item-code order within their section (J01 before J01a before J2), and lines added to a section go after the lines already in it.
  • When the assistant deletes lines, it lists every line that went, with its value, so you can see straight away if more went than you asked for.
  • A take-off where every counted line comes out at quantity 1 is sent back to be counted again against the schedule and the plans, apartment by apartment and level by level. It goes through at one of each only when the job really has one of each.
  • A section named for where it is (Level 1, Ground floor) rather than its trade is still checked as the trade its lines are, so joinery under "Level 1" is held to joinery's limits, not a general trade's.
  • Suggest codes never codes a line by itself. It suggests; only the lines you tick and accept change, and a line that already has a code is never changed by it. The assistant can show you the same suggestions in chat, and it codes a line only when you tell it to.
  • A discount never reaches the budget, a purchase order, a tender or a scope of works. On the quote it prints at its own amount. In the schedule of values it is shared across the work lines, so each line's claimable value is a little lower and the schedule still adds up to the contract sum.

Things that surprise people

  • In the inspection view, adding a part changes the unit's build-up straight away. The estimate line only moves if you leave Base to bring it into step, and it tells you by how much. The note under the parts says when a line is priced under what its parts add up to.
  • Group by is one choice at a time: section, room, scope or cost code. A room's sell is its lines at their own section's margins, so the rooms add up to the section. A set of drawings with no room names gives lines with no room — put them in rooms yourself with Room…, or tell the assistant what the areas are called.
  • The subcontract markup does nothing until a section carries a trade's price, and then only to that trade's price. A line you marked as supplied by you or the client in that section keeps the section's margin. On a won job it is fixed with the contract.
  • Approve is the load-bearing word. If a quote looks thin, look for unapproved lines first.
  • Grouping the estimate by cost code moves nothing. Every line stays in its section and sells at that section's margin, so a code's figure is the sum of what its lines sell for at their own sections' margins. The quote can group by cost code too, but it is set separately and puts a line with no code under the code its trade matches; the estimate shows that line under Not yet coded, so you can see it needs one.
  • Suggest codes uses the AI, a very small amount per line, and it is right most of the time, not every time. A line in a room section (Ensuite, Laundry) or a line naming another trade's item is where to look twice. Coding a line moves no money: the line's price is the same under any code.
  • The plan check's questions can go to the client before the job is won. Client is offered only when someone on the client side of the job can sign in to their portal: a client contact on the job's Client page with an email address. Which are for the client? uses the AI, so it counts towards your AI use, and it only suggests. Raising and sending stay with you. Raising needs Drawings → Edit.
  • A signed quote, letter of acceptance or client PO that arrives by email or on Documents offers Record the acceptance. On a job still being quoted it wins the job through the quote the client accepted — refused when the price on the paper is not that quote's — and on a won job it keeps the PO number and price. The contract sum of a won job is never changed this way: a different price is said, and corrected on Job Costs with the document attached.
  • The status list and Edit project cannot move a job to a won status without the signed paperwork either; they say what is missing. The assistant is refused the same way.
  • The Mark won window and the Quote signed banner read the same record. A quote the client signed after you sent it for signature from Documents counts as signed in both, even with no quote sent from the job's CRM lead. A subcontractor's quote you signed never counts.
  • The head PM you pick in Mark won is saved before the win, so they stay on the job even if the win is then refused. Naming one needs Teams → Edit; without it the window still wins the job and says the head PM was not set.
  • Naming someone in no team puts them in that team for good, as a member, so they also see its tasks when your business keeps tasks to teams. With that privacy on, only an admin or the team's lead or backup can add them; anyone else sees the window win the job and say why the head PM was not set.
  • Ticking a section the assistant proposed approves its lines only if you hold Approve lines. Without it the lines still go onto the estimate, pending, and the card says so; someone who can approve lines approves them.
  • Hours without a labour rate cost nothing. A line with hours and no $/hr is flagged when you edit it.
  • A selection only ever acts on lines you can see. Select twenty lines, then filter to one trade, and the bar counts and acts on the ones still showing; clear the filter and the rest are selected again.
  • On a won job the selection bar offers only what carries no money: cost codes, the quote wording, an order or a tender, and copying. Moving, supply, PS, rates, quantities, scope groups and duplicates change what the job is worth, so they are a variation. Delete opens Raise as a variation for the lines instead, the same as deleting one line.
  • The similar-lines box only suggests. Nothing changes until you press Set, and it uses the AI, a very small amount each time. When it finds nothing like the line, it does not appear at all.
  • mat/unit is not the price of one item. It is the material only; the labour is in hrs and $/hr. What one item costs you is unit cost, and what the client pays is that plus your margin.
  • The hours are for the whole line. Ten doors at two hours each is 20 hours, not 2.
  • Measured areas and lengths depend on drawing scale; spot-check one known dimension per drawing set the way you always have. Counted items are verifiable by their boxes.
  • The lock is derived from the job's status. Moving the job back to a not-won status is the unlock, deliberate and visible. There is no flag to flip. Someone allowed to may also unlock with a written reason, and the relock records what changed.
  • Undo covers what you did on this page during this visit. It starts empty when you open the page again, and it does not undo the assistant's changes; for those, use Revision history or ask the assistant.
  • Undo will not overwrite a line someone changed after you. If the assistant or a colleague has edited the same field since, that line is left as it is now and Undo tells you.
  • Undoing a rate change puts the lines back, but not a rate-book change made in the same sheet. Change that in the rate book.
  • Some rate-book rates include their labour (marked labour included on a line's rate panel). Using one splits it: the line gets the material part, and the labour becomes hours at the line's $/hr. With no $/hr on the line, the whole figure goes in with no hours. Either way the labour is counted once. The panel compares such a rate with what the line costs per unit with its labour, not with its material alone.
  • The assistant only links a line to a rate for the same thing and the same kind of work. A light switch is never priced from a power point, a painting line never from a removal rate. When nothing in the book is the same thing, the line is priced from scratch and says so.
  • An estimate you built by hand or imported gets no automatic revisions until the assistant has checked it as complete. Save revisions yourself until then.
  • A margin change on its own does not start the ten-minute clock for an automatic revision. It is captured with your next line edit, or press Save revision snapshot.
  • Restoring a revision lands every line pending again. That is the point: it is a draft until you say otherwise.
  • A restore point is one per conversation turn. A rebuild the assistant does in several steps saves one, before the first step, so restoring it undoes the whole rebuild. It sits in Revision history with your own revisions, not marked automatic.
  • A new job has no margin until you set one. The global margin box then shows not set — prices at cost, and the estimate, the quote and every other document sell it at cost until you type a margin. Before, the estimate showed 10% while the quote used none.
  • A line marked Excluded (an option the client may add, an item you have carved out) shows on the estimate with a grey Excluded tag but counts nowhere: not in its section, the masthead totals, the quote or the bill of quantities. The quote lists it under exclusions instead.
  • Renaming a section, moving every line of a section to a new name, or splitting a section's lines into new sections keeps its margins and contingency: the new sections sell exactly as the lines did. Lines moved into a section you already have take that section's margins. If you ask the assistant to set a section's margin with a name that could mean two sections ("Joinery" when there is a "1. Joinery" and a "2. Joinery"), it asks which rather than guessing.
  • A discount comes out of your margin, not your costs. Taking $10,000 off a job that costs $100,000 and was priced at 15% leaves you about $5,000 margin, not a cheaper job. The masthead's margin shows it.
  • Rate Book — where the rates come from and go back to
  • Scope of works — cut from the approved estimate
  • Documents — the quote, bill of quantities and scope PDFs
  • Tenders — pricing trades you do not do yourself