In this guide
Meeting settings
The meetings each stage of a job should have and who goes — jobs suggest them, a person books them.
What it is
The stage meeting plan: the meetings each stage of a job should have, and who goes to each. Base starts you with seven — the client site visit before the quote, the pre-start with the client once it is won, the subcontractors' pre-start and site induction, the client walk-through at lock-up, a site meeting every fortnight while on site (optional), the practical-completion inspection, and the end-of-defects walk. You change them, switch them off and add your own.
A job's Meetings panel, on its Tasks page, shows what its stage has not booked yet as a suggestion with Schedule. Nothing here books a meeting by itself.
Before you start
- You need to be an admin. Anyone else who opens the page is sent back to Settings.
How to
Change a meeting the plan suggests
- Find it under its stage: Quote, Won, Pre-construction, On site, Handover or Defects period. Each meeting is one line: its name, then when in the stage, its length and who is invited.
- Press Edit (or the meeting's name) to open it.
- Change what you need: the meeting's title, When in the stage (words for whoever books it), Kind, Length, and Who is invited: press Client, Subcontractors, Suppliers or Consultants to add or take off that side. For one that comes round again, switch Repeat on and say every how many days. Switch Optional on if a job can do without it; off, it reads Expected.
- Press Done to fold it back to its line, and Save the plan.
From then on a job's suggestion, and the meeting Schedule opens, use your words, length and people.
Switch one off
Switch it Off and press Save the plan. Jobs stop suggesting it. Base's own meetings can be switched off but not removed.
Add your own
- Press Add a meeting under the stage it belongs to.
- It opens ready to fill in. Give it a title and fill in the rest. A new meeting starts as optional; switch Optional off if every job should have it.
- Press Save the plan.
Remove this meeting, at the foot of one of your own when it is open, takes it off again.
Put Base's defaults back
Press Put the defaults back and confirm. Your changes and your own meetings come off the plan; meetings already booked stay booked.
What happens on its own
- A job's stage comes from its status: quoting, won, awarded (pre-construction), in progress (on site), then handover once practical completion is declared, and the defects period once the practical-completion date has passed. A job on hold, completed or archived suggests nothing.
- A suggestion goes away once a meeting is booked from it. A repeating one comes back when its days have passed since the last one and nothing is booked ahead.
Things that surprise people
- The plan never books a meeting, sends an invite or raises a task. A person presses Schedule, picks the time and sends the invites.
- Changing the plan does not change meetings already booked.
- Closing a meeting with Done does not save it. Nothing is saved until you press Save the plan, and the page says Unsaved changes until you do.
- "Who is invited" ticks the job's people on that side when the meeting is opened — the client contacts on the job, the main contact at each trade. You can change the list before you send.