In this guide
Plant and vehicles
The register of your utes, vans, trucks, site plant and workshop machines, who owns each, and how a day on a job is charged.
What it is
Plant and vehicles is the register of everything with an engine, a motor or a tray that works on your jobs: utes, vans and trucks, lifts, trailers and tools on site, and the machines in the workshop. Each item says who owns it and the one rate a use is charged at. Who owns it decides how a day on a job reaches that job's cost, so nothing is counted twice.
It is for whoever looks after the business's vehicles and gear, and for the project managers who want each job to carry what it used.
Before you start
- Turn tracking on for the kinds you want in Settings → Finance → Plant & vehicles. Until a kind is on, none of it can be logged on a job.
- Adding or changing an item needs the edit-costs permission.
- For a hired item, have the hire company in Contacts. Its bills are matched to the item by the company's name.
How to
Add an item
- Open Settings → Plant & vehicles and press Add an item.
- Give it a Name, pick its Kind, and add the rego or asset number if you like.
- Choose Who owns it:
- Owned by the business: set the Internal rate, what a day (or hour, or kilometre) costs you to run it. For a vehicle, pick who usually drives it if you like.
- On hire: pick the Hire company and its Hire rate.
- An employee's own: pick Whose vehicle and the Allowance you pay them.
- A contractor's: pick the contractor if you know it. Nothing is charged.
- Choose whether it is charged by the day, hour or km, and press Add it.
Change or retire an item
Press Edit on its row to change it. Switch it to Retired to stop it being offered on jobs. Every job it was charged to keeps the charge. Tick Show retired to see retired items again.
Log a use on a job
A use is logged where it happens:
- At the QR sign-out. Under Plant or vehicles you used today, the crew member taps the ute or the lift (theirs is listed first) and says how many days, hours or kilometres. It goes on their shift, on the trade the shift is for.
- At the workshop clock-off. Under Machines you used today, the worker taps the machines and the hours on each. The hours are shared across the jobs in their split, by each job's share of the time.
- On the site diary. The day's Plant and vehicles block lists every use logged for the day and + Add logs another: a hired lift on site, a ute nobody signed out with.
- On Job Costs. Open What's in it → Internal costs and press Log a use. See Job costs and supplier bills.
- Ask the assistant.
What happens on its own
- Uses are charged on the hourly finance run. An owned item's use is added to that week's plant entry on the job, on the trade it was logged against, at the job's own rate for it from its date, else the item's rate. An employee's own vehicle is charged the same way, as a vehicle allowance.
- A hired item's uses accrue until its bill arrives. The job's cost to date includes them at the hire rate. When a bill from the hire company lands on the job, it is matched to the uses up to its date and the accrual stops, so the bill is the cost and nothing is counted twice.
- A charge already made is never repriced. Changing an item's rate changes uses still to be charged, not those already on a job.
Things that surprise people
- An item with no rate charges nothing. Its uses wait, and the job's Needs a look says so once.
- Plant is never a bill. Your own items are charged to jobs but nobody pays them, so they never appear in a payment run or go to Xero. A hired item's cost is the hire company's own bill, paid as usual.
- A sign-off sent again replaces what the shift said. The plant named the second time is the day's answer; uses already charged stay.
- A hire bill under a different name is not matched. If the company's name on the bill differs from Contacts, the use keeps accruing. Correct the name in Contacts, or ask the assistant to link the bill to the uses.
- A workshop machine can be a CNC too. The CNC's files and tools are set in Machines, tools and stations; the register only says what an hour on it costs a job.
Related
- Finance settings: turning tracking on.
- Job costs and supplier bills: where uses are logged and where they show.
- Machines, tools and stations: the CNC library.