Timesheets
Who worked when, who is on site now, who is expected, and what the hours cost — approved before they cost anything.
What it is
Timesheets is the labour hub: every shift across every job and location, seen six ways. Week is people down the side and days across, with hours and cost per person and a button to approve a person's week. Expected is who the programme, week plans and mobilisation dates say should be on each job, day by day, against who actually signed in. On site now is everyone signed in right now across every job. Jobs is labour by job against the hours and dollars the job was won on. Daywork prices subcontractors' site hours on their order's rates for you to approve. Shifts is every shift as its own row, for fixing times and exporting to payroll.
The person who runs payroll uses Week on a Friday; a project manager uses Expected and Jobs; the site manager uses On site now and Shifts to tidy up.
The line under the title says what is waiting on a person: how many crew shifts still need approving in the week shown, and how many leave requests need an answer. Enter hours and Automations sit beside the title.
Leave is the time off your crew asked for at a sign-in QR, waiting for you to answer, with the leave already approved and coming up.
Before you start
- The Timesheets module must be on for you (Settings → Team Modules).
- Editing a shift needs the Timesheets edit permission. Approving needs the separate Approve hours permission. Seeing a person's rate, and what their hours cost, needs Crew pay rates; without it you see hours and totals only.
- Shifts come from people signing in: at a job's own QR (see Site sign-in) or at a workshop or office QR (see Sign-in Locations). Crew need a PIN from the Crew Roster.
- For hours to become job cost, the person needs a cost rate, or a pay rate (Base adds your on-costs), on the Crew Roster or their own page.
- Expected comes from the job's programme: a task with a company or your crew on it, the job's week plan, and a subcontractor's mobilisation date.
- Sending a text or email from Expected needs the person's mobile or email in Contacts (or a mobile on the Crew Roster for your own crew), and Comms → Send switched on for you, because it goes from the business number or address. Without it the message window says so and Send stays greyed.
- Day boundaries follow the organisation's timezone, shown in the Shifts filters. An admin can change it there.
- The no-trade banner shows only to people who can edit crew. Subcontractors appear in it only if you can also edit Contacts and have the Subcontractors module.
- Answering a leave request, or recording leave, needs Approve hours.
How to
Give your crew and subcontractors a trade
The site sign-in shows each worker the jobs of their trade from the programme, so everyone needs one. When some of your active crew or subcontractors have none, an amber banner under the figures at the top says how many — for example "3 workers and 2 subcontractors have no trade yet".
- Press Set them now. A list opens with each worker and each subcontractor company, your crew first.
- Pick a trade for each one. If theirs is not in the list, pick Other… and type it. Leave anyone you are not sure of blank.
- Press Save.
The banner counts again and goes once nobody is left. Press the × to hide it until your next visit.
Approve a week
- Open Week. Use the arrows beside the date to move between weeks.
- Each row is one person. The cells are their hours each day; the row ends with their hours, their cost and a button.
- Press Approve N on a person to approve their closed shifts for the week, or Approve all at the foot of the grid (or Approve N shifts in the header) for everyone.
- A row showing Check has an auto-closed shift: press it to open that person's week in Shifts, correct the end time, and approve that shift on its own.
- In Shifts, a shift marked check stages has hours ticked to a making stage that the stage's Start and Done times don't bear out, for example "6 h ticked to JU-002 Assembly; the scans show 2 h". Point at it to read why. Fix the shift before you approve it. The threshold is in Settings → Machines, tools & stations → Making rules.
Click a person to see which jobs their hours went to each day, and to jump to their shifts or their own page.
See who is expected on site
- Open Expected. Week shows jobs down the side and days across; Month shows a calendar.
- Pick one job in the job box to make it that job's site calendar.
- Each name's colour says how sure the date is: Booked (confirmed, or on the week plan), Mobilising (their start day), Pencilled in, or Programme only. On past days a tick means they signed in and a struck-through name means nobody of theirs did. "+ name (unplanned)" signed in without being on the plan.
- In Month, click a day to open that week.
- A red dashed name, such as Plastering with Assign, is site work on the programme with nobody to do it. Press Assign, pick the subcontractor (those already on the job come first, then subcontractors of that trade from Contacts) or Our own crew, and press Assign. Every task of that trade on the job with nobody on it goes to them. A company not on the job yet still needs engaging on the job's Subcontractors page before its workers can sign in.
Text or email someone who is expected
- On a name in Expected (or in Expected, not here yet on On site now, or on the job's site home), press the message button. It reads Remind for a day still to come, Are you on site? once your site start time has passed today, and Follow up for a past day they never signed in.
- Pick who to send to — the company's contacts, primary first, and the workers of theirs who have signed in on this job; or your crew on the job.
- Choose Text or Email, change the words if you like, and press Send.
For a company due on a day still to come, Remind's message carries a link to the booking confirmation page. They tap Yes or We can't make it, and their booking on the programme changes to match.
Replies come back to Comms against the job. Nothing is sent until you press Send.
Check who is on site now
Open On site now. Each job with anyone signed in is a card, grouped into your crew and each subcontractor company, with when they signed in and for how long. Expected, not here yet lists who the plan has on that job today and has not signed in. Probably forgot to sign out at the top lists anyone signed in since an earlier day or for more than 10 hours. Site home opens the job's own gate screen. The tab refreshes every minute.
Text people who forget to sign out
- Press Automations at the top of Timesheets.
- Under Recommended here, find Text people still signed in after their usual finish and press Turn on.
- To stop it, press On to switch it back Off.
Once it is on, anyone still signed in 45 minutes after their usual finish gets one text with a link to their end-of-day sign-off. For your own crew the link opens their sign-off without the PIN, for that shift and for six hours. Their usual finish is worked out from their own recent sign-outs, else the job's, else 3:30 pm. It sends once per shift and never after 9 pm. Turning it on here covers every job. On a job's Site Diary, the same switch covers only that job. It needs your business texting number and the Automations module. Texts cost money, which is why it starts off.
Turned on here, it also covers people signed in at a workshop or office QR: their usual finish comes from their own sign-outs, else that location's, and the text names the workshop or office and links to its sign-out, which asks for the PIN (the no-PIN link is for a job's sign-off).
Set the sign-out cut-off and the regular day
Every business starts with a sign-out cut-off of 4:30 pm. When someone forgets to sign out, Base records a regular day from when they signed in (7.4 paid hours unless you change it) instead of keeping them on the clock until midnight. It is up to the worker to tell you if they worked longer.
- On the masthead, press Sign-out cut-off 4:30 pm (or No sign-out cut-off if it has been turned off). Admins only.
- Leave Use a cut-off time on, pick the time and how long before it people are texted (15, 30, 45 or 60 minutes). Turning it off means a forgotten shift is closed overnight instead, still as a regular day.
- Leave Sign them out at the cut-off on, or turn it off to text people without signing anyone out.
- Set A regular day to the paid hours your crew normally work (for example 7.6 for a 38-hour week).
- Read the sentence under the fields, which says exactly what will happen, and press Save.
Anyone still signed in at the warning time gets one text: "you're still signed in at Elm St — you'll be signed out at 4:30 pm. Staying longer, or already left? Reply STAYING or LEFT. No reply and we'll record a regular day, finishing 2:54 pm." A reply of STAYING keeps their shift open. LEFT 3:15 signs them out at 3:15, a real sign-out. LEFT on its own records the regular day. At the cut-off, everyone else is signed out as a regular day from their sign-in, never later than the cut-off, and the shift is marked as signed out for them. If they reply LEFT 5:10 afterwards, the finish changes to 5:10, as long as the shift has not been approved yet. Someone who signs in after the warning time (an evening job) is left alone until that night. The texts use your business texting number, and each costs a little. With a cut-off on, the "usual finish" text above is not sent as well.
Text your crew where they are tomorrow
- Press Automations at the top of Timesheets.
- Under Recommended here, find Text your crew where they are tomorrow and press Turn on.
- To stop it, press On to switch it back Off.
Once it is on, every working afternoon from 3 pm each of your own crew with site work tomorrow gets one text naming the job, its address, your site start time and their tasks, for example "You're on site at Smith St Fitout (12 Smith St, Brisbane) tomorrow from 7am: Wall framing, Bulkheads and 2 more." On a Friday it names Monday. The text ends with a link to their own page (their week, hours and tickets), good for three days; a worker with no PIN gets the text without it. Someone on two jobs gets one text naming both. It covers every job. It needs your business texting number and the Automations module. Texts cost money, which is why it starts off.
Text a worker when you put them on a job
- Press Automations at the top of Timesheets.
- Under Recommended here, find Text a worker when you put them on a job and press Turn on.
- To stop it, press On to switch it back Off.
Once it is on, putting one of your crew on a job (the job's Add crew on Crew & Timesheets, or asking the assistant) texts them the job, its address and your site start time. It covers every job, needs your business texting number, and starts off because texts cost money. The text ends with a link to their own page, good for three days. Put someone on a job between 9 pm and 7 am and the text waits until 7 am.
Answer a leave request
Your crew ask for time off at a site's or the workshop's sign-in QR with their PIN, or from their own page: what kind (annual, personal or carer's, RDO, unpaid, long service, other), the first and last day, and a note if they like. Everyone who can approve hours gets a notice.
- Open Leave. The tab shows how many are waiting.
- Under Waiting for you, each request shows who, the days, how many days, the kind and their note.
- Press Approve, or press Decline, type why (they read it) and press Decline again.
- To take back leave you already approved, find it under Coming up, press Cancel, type why and press Cancel leave.
They see your answer the next time they sign in at any QR, and in their own list under Ask for time off.
Record leave someone phoned in
- On Leave, press Record leave.
- Pick who, the kind, the first and last day, and add a note if you like.
- Press Record as approved. It is saved as approved by you.
Text a worker the answer to their time-off request
- Press Automations at the top of Timesheets.
- Under Recommended here, find Text a worker the answer to their time-off request and press Turn on.
- To stop it, press On to switch it back Off.
Once it is on, approving, declining or cancelling someone's leave (or recording leave for them) texts them, for example "Your time off (Annual leave, Mon 20 - Fri 24 Oct) is approved." A decline or cancellation carries your reason. It covers the whole business, needs your business texting number, and starts off because texts cost money.
Watch labour against the budget
Open Jobs. Each live job shows this week's crew hours (and subbie hours beside them), this week's crew cost, hours to date against the hours budget, labour cost to date against the labour budget, and the last 8 weeks as small bars. The cost to date is what is already on the job's costs plus closed hours not yet posted ("pending"). A bar turns amber past 85 % and red past 100 %.
Price and approve subcontractor daywork
- Open Daywork and pick the job.
- Each subcontract order is a card. On Day / hourly rates, every week of their sign-ins is listed, priced on the order's rates: normal hours, hours past 8 a day at the overtime rate, weekend hours at the weekend rate, or one day per person per day on a day rate. On a Lump sum, only shifts you tagged as daywork are listed.
- Check the hours and the amount, then press Approve docket (day rates — the hours are recorded as received on the order) or Propose variation (lump sum — a variation for the daywork waits on Money → Decide).
To tag a shift as daywork, open Shifts, find the subcontractor's shift and press tag daywork where crew shifts show approval. Press it again to untag. A shift on an approved docket shows on docket and can't be retagged.
Once you approve a docket, the subcontractor sees it under the order in their Base portal and can Sign it (the hours and amount are right) or Query it with a note. Under Approved the docket then shows signed by the sub and the date, or queried with what they said. A query also tells the job's head PM. Signing is final; a queried docket can still be signed once you have sorted it out. Neither answer changes the docket or its money, and only the subcontractor can record one.
Check a subcontractor's own daywork docket
- On Daywork, pick the job and press Add daywork docket.
- Drop the subcontractor's docket on the form, or type it in: who it is from, the docket number, the day worked, their order, the work done, and a line per worker, plant item or material with its hours or amount.
- Press Confirm and save. The docket is filed on their order, and Base compares it with their workers' sign-ins on the job that day, priced on the order's rates when it has them. The form says whether they agree.
When the docket claims more hours, more people or a higher price than the sign-ins show, the job's head PM (else the admins) is told before the daywork is approved. Nothing on the docket is approved, priced or received by this: approve the week's daywork on the card as before.
Enter hours from a paper or labour-hire timesheet
- Press Enter hours at the top of Timesheets, and pick the job.
- Drop the timesheet on the form, or type it in: the Labour-hire company if it is an agency's sheet, then one line per person per day with the start and finish (or the hours worked) and any unpaid break.
- Press Confirm and save. Each line becomes a closed shift on the job, not approved, marked as entered from a timesheet in its edit history.
Your own crew are matched by name. Anyone else is a worker of the labour-hire company named, like a subcontractor's worker: counted, never costed as wages (their cost arrives on the agency's bill). A name that is not on your crew, with no company named, is refused, and so is a name two of your crew share.
A line that overlaps a shift the person already has is left alone, so entering the same sheet twice adds nothing. With only hours given, the shift starts at 7:00; with a start and finish, the standard break applies unless one is written.
Fix a shift
- Open Shifts. The Needs attention block at the top holds open shifts, shifts Base closed automatically because nobody signed out, and shifts by self-added crew nobody has verified.
- Press the pencil on a row.
- Change the start, end, break minutes or, for a shift that was not on a job, what the time was for (workshop, office, estimating, travel, training, leave, sick). For a shift on a job, Cost to picks which line of the job's budget the hours cost to; left on the default, they go to the line matching the person's trade, else the job's labour line. Press the tick.
Editing a shift that was already approved takes the approval off: approve the corrected hours again.
Every field you change is written to an audit trail. If you change the times without touching the break, the standard break rule applies to the new length: 30 minutes unpaid over 5 hours. An end before the start is refused. A shift already posted to job cost cannot be edited.
Move a shift's hours between units
A workshop shift's hours are split across the units and stages the worker ticked at sign-out.
- In Shifts, press the split icon beside the pencil on a job's shift. The table shows the hours each unit and stage holds.
- Before the shift is approved, change the share each tick has, or press Add a unit stage to move part of the day to another unit's stage. The total can't pass 100%. What's left over stays on the job.
- Press Save the split. The hours follow the shares, and so do the stages' logged hours.
An approved shift can't be re-split: unapprove it first.
Once a shift has posted to job cost, hours move only by a correction:
- Pick the share to move hours off, where they go (another unit's stage, or the job), how many hours, and why.
- Press Correct.
The correction takes the hours and their cost off one share and puts them on the other, at the same money. It lands in this week's labour. The posted week is never reopened.
Answer a worker who asked to fix their times
- A worker can ask, from their own page, for a shift's start or finish to be changed, with a reason. The shift moves to Needs attention in Shifts with asked to fix, the times they asked for and their words. The site supervisor gets a notice too.
- Apply saves their times on the shift. Edit opens the editor on their times so you can adjust them; saving applies the request. Decline asks for a note and leaves the hours as they are.
- The worker sees Fixed or Not changed (with your note) on their page.
Applying is an edit like any other: it is audited, the break rule applies, and an approved shift loses its approval so the corrected hours are approved again. A shift already posted to job cost cannot be applied.
Answer a worker who asked to add a day
- A worker can ask, from their own page, to add a day they worked and never signed in to: the day, where, the start and finish, and what happened. It shows at the top of Shifts under Needs attention · Asked to add a shift, with who, where, the day, the times and their words. The site supervisor gets a notice too.
- Apply adds the shift with their times and the standard break. Edit lets you change the start, finish or break first, then Add shift. Decline asks for a note and adds nothing.
- The worker sees Added or Not added (with your note) on their page.
The shift is added closed and not approved: approve it like any other before the hours cost anything. It is written to the audit trail as added by you. If they already have a shift at that time, Apply is refused; fix that shift or decline the ask.
Filter and export for payroll
- In Shifts, set From and To and narrow by Job, Person, Who (crew, subbies and visitors), Staff type or Location.
- Press Export CSV.
The file carries the same window and filters: date, name, project, location, start, end, break, payable hours, and flags for auto-closed, unverified and edited rows.
What happens on its own
- A shift left open past the end of its start day is closed automatically and flagged for review.
- Moving between a job and the workshop or office closes the earlier shift when the person confirms the move at the next QR, at that moment, keeping its job — or, for workshop time closed at a job's QR, filed as the job or as workshop (office) time, whichever they chose. It is never re-filed or left without a job. The time between the two places counts on the earlier shift.
- Payable time is the shift length less the unpaid break. The break is 30 minutes once a shift passes 5 hours, applied at sign-out and at auto-close.
- With a sign-out cut-off set, every few minutes Base checks who is still signed in today: at the warning time they are texted once, and at the cut-off those who did not reply STAYING are signed out at the cut-off time and flagged Check. A STAYING reply holds the shift until the person signs out, or the 23:59 close.
- Approved, closed crew shifts post to job cost on the hourly finance run: one labour line per job per week per budget line, at the rate each person was on that day. Hours go to the budget line the shift names, else the line matching the person's trade, else the job's labour or preliminaries line. Time not on a job (workshop, office, leave and so on) posts to the business's overheads.
- A workshop shift ticked to joinery units at sign-out is split further: each unit stage's share of the job's time goes to that unit's own joinery line, and the rest stays on the job's labour line. The shares add up to the shift's cost to the cent.
- A crew member who works for a subcontractor (set on their own page) is never posted as wages. Their cost comes through the company's orders and invoices.
- If your organisation has set an overtime rule (Settings → Finance), hours past it in a day or week cost the overtime loading on the wage.
- A later approval for a week already posted adds to that week's line rather than opening a second one.
- Closed hours nobody has approved yet are priced the same way and shown on the job's Job Costs page as Provisional labour. They count in the job's forecast and margin, never in its actual cost. Approving them makes them actual.
- While hours wait, everyone who can approve timesheets gets a reminder on Monday from 7am, in the inbox and by email, listing the hours by job. It stops when nothing waits. After four weeks in a row with nothing approved it pauses until someone approves some.
- Expected is worked out fresh each time from the programme, week plans and mobilisation dates; nothing is stored, so moving a task moves the calendar.
- Every working afternoon from 3 pm, Base reads each live job's programme for the next working day (Friday plans Monday, and public holidays are skipped). The job's head PM, or its site supervisor, or else the admins, get one notice listing who is on site tomorrow, any company that has not confirmed, and any site work in the next two weeks with nobody to do it. There is no notice on a day with nothing on.
- The same notice lists what else is due by the next working day: deliveries (and any due earlier that are still not in), inspections and hold points not cleared (and any up to two weeks late, marked late), and RFIs holding up work, up to three of each per job. It does so even for a job with no other work coming up. A late delivery or an RFI waiting on someone else never sends a notice on its own; they are added to one that is going anyway.
- Work with nobody to do it also goes on one task for the job, Assign people to the site work coming up, with a line per trade. A line ticks itself once someone is down for that trade, and the task closes when every line is ticked.
- Your crew are not texted where to be unless you switch on Text your crew where they are tomorrow or Text a worker when you put them on a job. The afternoon read of the programme still works out who is on site tomorrow either way; without the switch, only the managers' notice says so.
- When one of your crew asks for time off, everyone who can approve hours gets a notice in their inbox naming who, the kind and the days. Their note is not in it.
- When one of your crew asks to add a day they did not sign in to, the site supervisor (else the head PM, else the admins) gets a notice naming who, where, the day, the times they asked for and their words. A shift added this way does not count as a sign-in or sign-out, so it never closes a site's day or moves anyone onto a diary.
- Approved leave shows on Expected: "Sam — on leave" on each working day of it, on the jobs whose crew they are on, and the day's count at the top says how many are on leave.
- The afternoon read leaves anyone on approved leave out of tomorrow, so they are not texted where to be. The managers' notice names them ("Sam on leave"), and when everyone of that trade on a job is off it counts as something that needs you.
- The assistant works on every tab. Ask it things like "who still needs approving this week?", "who's expected on Smith St tomorrow?", "is the sparky on site?", "which jobs are over their labour hours?" or "what daywork is waiting on Jones Rd?" — it reads the same figures the tabs show, and can switch tabs, move the week or calendar, and open a person or a job for you.
- It can fix a shift (with the same audit trail, including which budget line the hours cost to), tag a subcontractor's shift as daywork, and add a rate to an order when you ask.
- It drafts a reminder, "are you on site?" or follow-up message and shows you who it would go to; nothing is sent until you say so.
- It approves hours or daywork only when you tell it to, and never on its own.
Things that surprise people
- Nothing becomes actual cost until a person approves it. Until then the hours show on Job Costs as provisional labour, in the forecast but not the actual cost.
- A person with no rate shows no rate in amber and their hours are left out of the cost — not costed at $0. Set a rate on their page.
- Approve all never includes an auto-closed shift. Each of those is approved on its own once you have checked the end time.
- Subcontractor and visitor hours are counted but never costed in Week or Jobs. A subcontractor's cost reaches the job through their order and bills — on day rates, through the daywork you approve; counting both would charge the job twice.
- Hours already posted are never repriced when a rate changes. A rate change from a date applies to hours on or after that date that are not posted yet.
- Expected only knows what the programme says. A company shows Programme only until someone confirms the date with them; a council or client task brings nobody. Only site work brings anyone: a joinery company is expected on its install days, not while it manufactures or draws.
- Wages carry no GST. Labour figures are ex GST with nothing to back out.
- The Shifts list shows at most 500 shifts and warns when it hits that cap; Week has no cap.
- The no-trade list shows up to 200 workers and 200 subcontractors at a time; save those and the rest appear. Inactive crew and inactive or pending subcontractors are left out.
- The tomorrow text goes once per worker a day, at the first afternoon run that finds them on site. Change the programme or the crew after it has gone and they are not texted again, so tell them yourself.
- The tomorrow text only knows the programme. A job with no programme sends nothing, and only your own crew's site work counts: someone is on a job tomorrow when they are on that job's crew and the work is their trade. General work, and work with no trade, goes to your labourers, leading hands and supervisors, not to every trade on the job.
- Nobody without a mobile on the Crew Roster is texted, and nor is anyone inactive or still waiting on a request for site access.
- The text when you put someone on a job never goes between 9 pm and 7 am, on your business's clock: it is held and sent at 7 am. If you took them off the job overnight, or their tomorrow text has already named the job, nothing goes at 7.
- Someone created on a job with Create & assign gets the job in their PIN text, so the text when you put them on a job does not go as well.
- Approving leave records no hours and pays nothing. Paid leave is still your payroll; a leave shift entered by hand in Shifts is separate and still needs approving like any other.
- Leave is whole days. A worker can ask from up to two weeks back (a sick day just gone) to a year ahead, up to 60 days at a time; recording leave yourself reaches further back.
- A worker can withdraw a request only while it waits. Once you have answered it, changing it is yours: cancel approved leave under Coming up.
- A worker's note can be private, a medical reason for example. Only people who can approve hours see it. The assistant is not given it, so read it on the tab yourself.
- Since 17 October 2026 the note is kept apart from the request itself, so nobody else in the business can read it, even outside Base's own screens. The worker can read their own note on their page.
- The answer text never goes between 9 pm and 7 am and is not saved for the morning; they still see the answer the next time they sign in.
- Leave approved after the afternoon read has run does not take back a tomorrow text that has already gone.
- Leave does not count in the two-week "nobody to do it" list on the Assign people to the site work coming up task. A week off next week is yours to plan around.
- A worker's ask to fix their hours changes nothing until someone here applies it. Only shifts from the last two weeks can be asked about.
- Hours entered from a timesheet are not sign-ins. They never close a site's day, put anyone on a diary or text anyone, and they still need approving before they cost anything.
- A subcontractor's daywork docket is checked against the day's sign-ins, not the week's. A docket covering several days is best entered one day at a time.
Related
- Crew Roster: the people and the rates that price these hours.
- A worker's page: one person's weeks, jobs, tickets and rate history.
- Crew and timesheets on a job: the same shifts seen from inside one job.
- Site home: the gate screen for one job.
- Job costs: where the posted labour line lands.