Defects
The punch list and its resolution.
What it is
The Defects Register: everything logged during the defects liability period, where it is, how bad, who identified it, who is fixing it, when it is due, what it costs to rectify, and whether it has been verified as done, with before and after photos. The project manager and site supervisor keep it; practical completion and project close read from it.
Before you start
- The Defects module is on (Settings → Team Modules). Without it the tab is hidden, and opening its address says Defects is not switched on for you. Raising, changing and closing defects needs Defects → Edit.
- To assign a defect to a subcontractor, the business is in Contacts with the subcontractor role (or you add it from the form).
- To give one to your own crew, the worker is on Crew with a PIN; for "whoever does the trade", they are on the job's crew with their trade set.
- Once practical completion is declared, the DLP dates appear at the top with the days remaining and the security held.
How to
Log a defect
- Press Log Defect (or Defect + photo from Site home, which opens the form with the camera ready).
- Enter the Description (required), Trade, Location, Severity (Minor, Major, Critical), Identified By (Client, Our inspection, Independent Inspector, Centre Management), the Responsible Subcontractor, a Due Date and the Cost to Rectify (ex GST).
- Tick Show on the client's portal if the client should see it. Leave it off and it stays on your register only.
- Add Before photos and press Log Defect. The defect is Open on the list with its photos; a due date in the past turns red and says overdue.
Add a defects list
- Press Add a defects list at the top of the register.
- Drop the client's, certifier's or inspector's list (a PDF or a photo) on the form, or click to choose it. Base reads the date, who made it and each defect with its location and trade, and shows them beside the file. Or type the lines in.
- Check the lines, remove any that are not defects, and press Confirm and save (Save when typed in).
- Each line is logged as an Open defect on the register, identified on the list's date. Open each one to assign who fixes it and when.
Walk the defects
- Press Walk the defects at the top of the register. On a phone this is the easiest way to go room by room with the client or the supervisor.
- Pick the room from the bar across the top, or press + Room and type a new one. The number beside a room is what is still open or waiting to be checked in it.
- To add what you find, type what is wrong, press Photo to take one, pick the severity, and press Add. More sets who fixes it and whether the client sees it. The room stays picked for the next one.
- Under the add card are the room's defects. An open one has Add photo. One a trade has marked fixed has Fixed — verified and Not fixed — send back. A verified one has Close.
- Press Register to go back. Everything you added or changed is already on the register.
Show a defect to the client
- The eye on a row shows whether the client sees the defect on their portal. Press it to show the defect, and press it again to hide it.
- A defect the client reported in their portal says From the client's portal and its eye is locked on: what they reported stays on their list.
- On a defect the client sees, verifying the fix shows them its after photos beside the before photos. The row reminds you, and so does the walk before Fixed — verified.
Give a defect to your own crew
- In the form, Fixed by offers A subcontractor or Our crew.
- With Our crew, Who on our crew lists the job's crew first, then the rest of your active crew. Whoever does gives it to everyone of the defect's trade on the job's crew; it needs a Trade on the defect.
- Save. The row says Our crew: or Our crew (). The defect is on their Defects to fix list when they sign in at the gate, and on their own page, where they mark it fixed with a photo.
- If the defect was Open, saving it with Our crew moves it to Assigned by itself. That tells the site supervisor, and texts the worker if you switched that on. If you pick a status in the same save, your status stands.
- Picking a subcontractor takes it off your crew, and the other way round. A subcontractor's defect stays Open until you move it to Assigned, because Assigned is what sends their notices.
Move it along
- The status dropdown on each row steps it: Open, Assigned, Rectified, Verified, Closed.
- The camera on a row adds photos. Before the defect is rectified they are Before shots; from Rectified on they are After shots.
- The pencil edits the defect; After photos are offered when editing. The bin deletes it after a confirmation.
Filter the list
The pills count defects by status: All, Open, Assigned, Rectified, Verified, Closed. The stat cards give the total, how many are open or assigned, and the total rectification cost.
What happens on its own
- Open defects are counted on the Handover page and block closing the project unless a reason is written.
- When a defect is marked rectified, by your crew or by the subcontractor in their portal, the job's site supervisor is told to check it (the head PM when there is no supervisor, else the admins). This is on for every business. Each fix is told, a second fix after a send-back too, and never to the person who marked it fixed.
- With the defects automations on (the Automations button on the page), a defect marked rectified prompts a verification, and defects left open are chased weekly. You get a draft chase, never an automatic send.
- A defect given to your crew that moves to Assigned tells the site supervisor (else the head PM, else the admins) who has it. This is on for every business. The worker gets a text only if you switch on Text a worker when a defect is given to them (Site supervisor pack): one text with the job and the defect, between 7 am and 9 pm, to someone named on the defect.
- An Open defect moves to Assigned by itself when it is saved with Our crew: from the form, from Log Defect, or when you ask the assistant. A new one is logged as Open first, then moved, so both the "logged" and the "assigned" notices go.
- When one of your crew marks a defect fixed from their own page, it moves to Rectified with their photo, never to Closed. Their note goes to the job's managers.
- The assistant can list, log and update defects from chat; the list refreshes and flashes what changed.
- A defects list emailed in or uploaded to the job's Documents is recognised as one; Record the defects on it opens the same form, and if nobody records it someone is asked to. Each defect logged from a list sends the same "logged" notice as one logged by hand.
- Asking the assistant to log a defect as Assigned works the same way, whoever is fixing it: it is logged as Open, then moved to Assigned, so the assignment sends what you have switched on, as it does from the page.
- A defect the client reports in their portal lands on this register as Open, identified by the client, with any photos they added. It is on their own list with those photos.
- Make a defect on a report on Safety logs it here as Open, identified by Our inspection, with what was reported, how bad, the day and the report's photos as its before photos. Defect logged · open brings you here with its form open, to assign the trade, the subcontractor and the due date.
Things that surprise people
- Closed should mean someone checked. Rectified is the sub saying it is done; Verified is you agreeing.
- The client does not see your register. They see what they reported in their portal and what you show them. Every defect logged before 16 October 2026 is hidden from them until you press its eye, even ones you logged as identified by the client.
- The client sees a defect's before photos. The after photos a trade sends with "fixed" reach them only once someone verifies the fix, so look at them before you verify. A defect closed without being verified first shows no after photos.
- The assistant cannot verify a fix in an automation it runs by itself: verifying is a person's check.
- The "marked fixed" notice is sent for every fix: a defect sent back and fixed a second time is announced again. Nobody is told about a fix they marked themselves, here or by asking the assistant in a chat. A fix the assistant makes while working on its own is still announced to you.
- A defect sent back to Assigned does not tell the subcontractor or the worker again: they see it back on their list.
- A fix marked from a subcontractor's portal or a worker's own page is theirs, so the site supervisor always hears about it.
- A defect with a photo and a room gets fixed. A one-line description gets argued about.
- A defect made from a site report has no trade, subcontractor or due date until you set them: a report says what happened, not who fixes it.
- Declaring practical completion with open defects is allowed, but they are recorded as outstanding items and printed on the PC certificate.
- Deleting a defect cannot be undone. Dismissing is not an option here; close it instead.
- Giving a defect that is already Assigned to someone else tells nobody: the notice and the text go when it moves to Assigned.
- An Open defect your crew already had before 17 October 2026 moves to Assigned the next time you save its form, and the supervisor hears about it then.
- If the crew member named on a defect is removed from the roster, the defect stays with your crew of its trade.