Drawings and RFIs
The drawing register, revisions, and raising an RFI.
What it is
Three tabs on one page, and it opens on the first. Revisions is each revised set compared against what was on file: what changed, what it touches in the estimate, the scope and the variations, with accept or reject per change, and every set received on the job underneath. RFIs are the questions raised against the drawings: who each went to, when an answer is due and what came back. An RFI is the formal record that you asked, when, and what the answer was. Sheets is the drawing register: one row per sheet across every set on the job, with its number, title, discipline and current revision, filed automatically from what is uploaded. A tab's count turns amber when something there is waiting on you: changes to decide, or an RFI overdue.
Before you start
- The Drawings module is on (Settings → Team Modules). Without it the tab is hidden, and opening its address says Drawings is not switched on for you.
- Adding drawings, filing them from Documents, running a revision review and raising, answering or sending RFIs need Drawings → Edit. With view only you can read the register and the RFIs, and the page does not scan for new drawings on its own. Accepting a revision review's changes moves estimate lines, so it needs Estimating → Edit as well.
- Drawings are uploaded to the job (Documents, or dropped into chat). The register files them itself.
- To address an RFI, the architect, engineer or consultant is in Contacts, or you type a name and email.
How to
Add a sheet by hand
- Most sheets file themselves. For one that did not, on Sheets press Add drawing.
- Enter the Drawing number, Revision, Title, Discipline, what it is Issued for (For Construction, For Approval, As Built, Information Only), the issue date and Issued by, and Attach the drawing.
- Save. Later revisions are issued from the drawing, not re-added.
Issue a new revision of a sheet
- Open the sheet from the register. Under Issue a new revision, enter the Revision label, issue date, Issued by and what it is issued for, and Attach the drawing file.
- Save. The new revision becomes current; the old one is kept in Revision history marked Superseded, so site can always see which is current. Supersede retires a whole sheet, optionally naming what replaced it. Edit register details corrects number, discipline, title or issuer.
Review a revised set
- When revised sheets are waiting, the masthead says so. Press See what changed; the page compares each revised sheet against the copy on file. Under Sets received on Revisions you can compare only the sheets one set superseded.
- On Revisions, each review lists the changes per sheet and what each touches. Accept or reject them one at a time, or accept all recommended; a review with a proposal has Approve and Dismiss. Anything the comparison held for a person is listed to apply.
- Re-scan, including sheets it could not read looks again, with a model, at documents that look like drawings but gave no sheet number. It is the one button on the page that costs money, which is why it is a button.
Raise an RFI
- On RFIs press Raise RFI (or Raise RFI from an open sheet, which links it).
- Address it: search Contacts for the business and pick the person, or type a name and email. Enter the Subject, the Question (what the drawings do not say, and what it holds up), Answer needed by, the Drawings it is about, its Impact (cost, programme) and any attachments.
- Save. It is Open, numbered, and on the list with its due date; overdue ones are marked.
Answer an RFI from a subcontractor
- A subcontractor can raise an RFI on one of their jobs from their Base portal. It arrives on RFIs as Open, with From and their company on the row and Not addressed yet under To. The job's head PM gets a notification that opens it.
- If you know the answer, Record response as for any RFI. If the designer has to answer, Edit it to address it, then Send for an answer.
- Every response you record, and the files with it, is shown to the subcontractor in their portal, which counts the answer until they read it. Your close notes are not. With Send a subcontractor the answer to their RFI switched on under Automations → Library, they also get the answer by email — including one the designer gave through Send for an answer.
- A subcontractor can raise an RFI only on a job they are still working on. Once their order is cancelled or their work there is complete, they cannot raise a new one, though they still see the ones they asked.
Send RFIs for an answer
- On RFIs press Send for answers (or Send for an answer on an open RFI).
- Tick the RFIs to send. Open ones start ticked.
- Under Who answers, keep Each RFI's own addressee to send each one to whoever it was raised to, or pick One person to send them all to someone from Contacts or a name, email and mobile you type.
- Add a Covering note if you like, an Answers needed by date (left blank, each email asks by the earliest date on its RFIs), and tick Also text the link to their mobile to text it as well.
- Check What will go: one email per person, listing their RFIs. Press Send.
- Each person gets one email with every question in full and a link to the RFI answer page, where they answer them all in one place. The page says what went and what could not.
Ask the client
- On RFIs press Ask the client. The drawer opens on The client, listing the job's client contacts who can sign in to their portal, the main contact first. The open RFIs already addressed to one of them start ticked.
- To have the AI sort the rest, press Which are for the client?. It ticks the ones only the client can answer and writes a short reason under every RFI: for the client, for the design team, or for you to answer. Check the ticks. It sends nothing.
- Pick the person the email goes to, add a note or a date if you like, check What will go and press Send.
- The email goes to that person, as any send does. In the client's portal, everyone on the client side of the job sees the questions under Questions and on Decisions, and any of them can answer. The answer is recorded with the name of whoever answered.
Check an answer that came back by reply
- When someone answers by replying to the email or the text instead, the reply is read and each answer it finds waits at the top of RFIs under An answer came back by reply, and you are notified.
- Read each one against its RFI. Edit it if the reading is off, then press Accept onto RFI-003 to record it as the RFI's response, or Dismiss if it was not an answer. Files that came with it are filed against the RFI when you accept.
- When several came back, Accept all records every one still waiting, with your edits, once you have read them. Any it could not record (an RFI closed in the meantime) stays on the list and is named.
Chase an answer
- Under Waiting on answers each send shows who it went to, how many are answered and whether they have opened it.
- Remind emails them again under the original email, listing only what is still unanswered, and texts them if they have a mobile on file. Reminding again within a few hours asks you first.
- Link copies their answer page link. Withdraw stops the link working.
Record the answer and close it
- Open the RFI. Record response: what came back in their words, From, Received, and Attach the reply. It becomes Responded; you can add another response. An answer given on the answer page is recorded this way for you.
- Close with outcome: No change (the drawings stand), Variation (the answer changes scope or cost; Raise the variation opens the variations page prefilled from the RFI) or Drawing revision (the answer needs the sheet reissued; Revise opens the sheet). Add a note and press Close RFI.
- Reopen a closed RFI with a note of what is still unanswered; Withdraw one that should never have been raised.
Raise and answer RFIs from the phone app
- In the Base Management phone app, open the job and tap RFIs. The list opens on Open, with how many are open, overdue and responded at the top. Each row shows its number, who it is to and when the answer is due; an overdue one says by how many days.
- Tap + to raise one where you stand: the Subject, the Question, To (start typing to search Contacts and pick the business or the person, or type a name and email), Answer needed by (3 days, 1 week, 2 weeks or no date), whether it affects cost or the programme, and photos. Press Raise it. It is numbered and Open, exactly as if it had been raised on this page.
- Tap an RFI to read it: the question and its photos, the drawings it is about, every answer so far and any variation raised from it. Add a photo to the question adds another.
- Record response takes what came back, who it was from and a photo of the reply. Close asks what the answer means (no change, a variation or a drawing revision) and a note; closing as a variation or a drawing revision then offers Raise the variation on the web or Revise the drawing on the web. Withdraw and Reopen ask you first.
- Send it for an answer on the web opens this page's RFIs tab, already signed in.
What happens on its own
- The page files new documents as it opens: a 25-page PDF becomes 25 rows with number, title, discipline and revision read off each page. A sheet it could not name is filed under the file name and page so it is at least findable; rename it and it stays renamed.
- A sheet whose number is not one of the register's disciplines (a project prefix like CBH-101, or a civil, landscape or telecoms sheet) is filed with the discipline blank, shown as —. Set it with Edit register details.
- A set filed before Base had finished reading its pages is read again once it has, so sheets it could not number the first time are added then. A page already on the register is never filed twice: one filed under the file name keeps that name until you rename it.
- A set whose pages only cite other drawings (a joinery schedule saying "as detailed on A8.30") files under its own name, not the architect's numbers.
- Only drawings are filed. A document is filed when it is typed as a drawing or plan, sits in the job's Plans folder, or reads as a drawing set: most of its pages are plans, its file name is a sheet number, or its first page has a title block. Your own quotes, contracts, variations and claims, their signed copies, RFQs and tender packs, subcontractors' tenders and quotes, orders, bills and site photos are never filed, even when they include plans. They do not appear under Sets received either.
- When a set supersedes filed sheets, a comparison is queued and appears on Revisions; the overnight sweep runs them too.
- If a plan check has run, its verdict, conditions, per-sheet notes and findings appear above the tabs, and the questions it drafted are already RFIs here, numbered after the last one and addressed to nobody yet.
- Questions raised from the plan check on the estimate (Raise as RFIs) land here like any RFI, numbered after the last one, and are never raised twice.
- When the plan check runs again, or its questions are edited, a question it asked before keeps its RFI and number. An RFI someone has addressed, sent, answered or edited is never withdrawn or reworded by the plan check. Only an RFI nobody has touched is withdrawn, with a note saying so, when the plan check stops asking it.
- A variation raised from an RFI is shown on that RFI.
- An answer typed on the answer page is recorded on the RFI straight away, and whoever sent it is notified.
- A reply by email or text is read for answers. They wait for you to accept them; a reply with no answers in it (a question back, "will confirm Friday") goes to the assistant's ordinary reply handling instead.
- When your business sends email from your own Gmail or Outlook, a reply that comes back to your mailbox rather than the reply address is read the same way, once your mailbox has synced.
- Your crew signed in on the job can open the sheets issued For construction from the sign-in page, read-only, each at its page. Sheets for approval, for information, as built, superseded or with no file are not shown there. See Site sign-in.
Things that surprise people
- Nothing on the register needs typing in. If you are typing drawing numbers, upload the set instead.
- A sheet with no discipline appears under All disciplines only, not under any one discipline, until you set it.
- A quote with plans in it stays a quote. To put a subcontractor's sketch on the register, ask Base in the chat to file that document as a drawing, or on Sheets press Add drawing and attach it. Your own quotes, RFQs, signed copies and tenders cannot be filed as drawings at all.
- Comparing a revision reads the drawings with a model and costs money, so it waits for See what changed rather than running on every upload.
- Closing an RFI as Variation does not raise the variation. It offers to; you do it.
- Open is informational. Overdue is the thing to look for, and it is shown on its own.
- An answer read out of an email is never recorded on its own. It waits on the RFIs tab until you accept it, because a reply can say "see attached" or answer the wrong question.
- RFIs sent to different people in one go are separate emails and separate links. Nobody sees another consultant's questions.
- Questions sent to one of the client's contacts are seen by every client contact on the job in their portal. Questions sent to a subcontractor, a supplier, the architect or the engineer never show in the client's portal. A client contact whose access you removed sees none of them.
- On an RFI a subcontractor raised, the drawer reminds you that they read every response you record. Write a remark meant only for your team in the close note, not as a response.
- The phone app raises, answers, closes, withdraws and reopens RFIs. Sending them for an answer, chasing, accepting an answer that came back by reply, and linking or revising drawings are done here on the web, which the app opens signed in.
- If someone records an answer or closes an RFI while you have it open on the phone, the app says it changed and shows it as it now is, rather than saving over them.
- Sending an RFI from a practice job asks you first.
Related
- Variations for what an RFI's answer often becomes.
- Documents for where the sets are uploaded.