Site diary

The diary that writes itself: crew, weather, work, orders, defects, photos.

What it is

The daily record of the job, composed for you from what actually happened: labour from sign-ins (who, for which company, when they signed in and out, how long), the weather, work from sign-off reports (what each person ticked as worked on, with done / part done / blocked, then anything they said or typed), orders issued, visitors, delays, safety notes, defects, forms and photos. The people who were there top it up with what Base could not see, and a supervisor finalises each day with their name and signature. A finalised day is frozen; corrections go on as revision notes. The week sits at the top at a glance, any day or week can carry an AI summary, and a day or a week prints to PDF. The site supervisor writes it; anyone with the job can read it. The line under the page title says whether today is in draft or finalised and how many days are still in draft.

Before you start

  • Someone is on site: an entry is created only when something happened (a sign-in, a report, a form, a site photo, a completed purchase order).
  • To finalise, or to ask for a summary, you are on the builder's team. A client reading through the portal can read and print, not write.

How to

Read the week at a glance

The panel at the top shows the seven days of the week: each day's weather and top temperature, how many people were on site, how many photos, and a coloured bar for how the day was closed (green signed or final, amber draft, grey frozen without review). Underneath are the week's totals: person-days, labour hours, delays and the hours lost to them, photos and rain. Press a day to jump to it. The arrows step a week back or forward; This week comes back.

Add what Base could not see

  1. In Add to the diary, pick the day from the dropdown beside the heading (today, or any day still in draft) and what to add from the row of four: Note, Delay, Instruction or Photo. The one you are on is lit.
  2. A note is free text. A delay asks What held the work up, the Hours lost and, optionally, who or what caused it. An instruction asks who it was From and what the Instruction was. A photo takes a caption.
  3. Save. It appears on that day under its heading. What a person writes is kept when the day recomposes, marked edited.

Turn a delay or instruction into a notice or a variation

  1. Under a delay, press Notice of delay. The notice opens with the delay's date, what held the work up, the hours lost, who logged it and what was on the programme that day already filled in. Add who it goes to, the time you are claiming and what you are doing about it, check it and save it. Sending it is up to you.
  2. Under a delay or an instruction, press Variation. The Variations form opens with a title and description written from the diary, and a note of the day it came from. Price it, add any time it costs the job under Extension of time claimed, and press Create Variation. It saves as a draft.
  3. Once made, the row shows what it became: the variation's number, or Notice filed. Press either to open it.

Log plant or a vehicle on the day

Open the day. Plant and vehicles lists what was logged for it: what the crew tapped at the QR sign-out, what the workshop clocked off with, and what was added here or on Job Costs, each saying whether it is charged, on hire or recorded only. Press + Add, pick the item from the register and how many days, hours or kilometres, and press Log it. It is charged to the job on the next hourly run. The block appears only once the business tracks plant (Settings → Finance → Plant & vehicles).

Read a day

Each day opens with its date, how it was closed (Draft, Signed, Auto-finalised), the weather and the headcount. Below that come the summary (if one was written), the photos, then what happened beside who was there. Labour on site lists everyone by company with the time they signed in and out, and a bar for each person across the working day; someone still signed in today shows On site. Beside each name is how they signed off: Reported, Nothing to report, Leading hand reported, or No report if they signed out without the end-of-day sign-off. The newest days are open; older days are folded to a line with their photos. Press the arrow on a day to open or fold it.

Leading hand reported also shows beside anyone a leading hand named on their own sign-off as working with them, unless that person filed their own report. The leading hand's line of work then reads "Sam (with Liam, Josh): …".

Mark the progress reported on site

  1. Progress reported on site lists what people ticked when they signed off, as Done or Part done, with who ticked it and the photo they took of it.
  2. For a programme task, press Mark on programme. A done task is set complete on the programme; a part-done one is set in progress.
  3. If it was not done, press Not right. It comes off that person's work list and out of the subcontractor's claim evidence.
  4. Either way the item shows who decided and when.

Look through the photos

Swipe the photo strip on a phone, or use the arrows at its sides on a computer. Press a photo to see it full screen with its caption, who took it and when; use the arrow keys or swipe to move through the day's photos, and Esc to close. From there you can open or download the original.

Summarise a day or the week

  1. On a day, press Summarise day; for the week, press Summarise week in the panel at the top.
  2. A few seconds later the summary appears: a headline, a short paragraph and the key points, written only from what the day's record says.
  3. If the record changes afterwards (a sign-out, a note, a delay), the summary is marked Out of date. Press Update to write it again; Rewrite does the same at any time.

Edit a section of a day

On a draft day, each section (Work reported, Orders issued, Visitors, Delays noted, Safety, defects & forms, Notes) has an Edit button. Change the text and save; the composer leaves an edited section alone from then on.

Finalise and sign the day

  1. On a draft day, press Finalise and sign.
  2. Enter Your full name and, optionally, your position, draw your signature and press Sign and finalise.
  3. The day is marked Signed with your name, the time and your signature. It can no longer be edited.

Correct a finalised day

Press Add revision note, write the correction (for example, "The delay recorded was 3 hours, not 2 — pump log received from supplier") and save. The record above stays exactly as it was signed; your note sits underneath with your name and the time.

  1. Press PDF at the foot of a day, or Week PDF in the week panel for the seven days shown there.
  2. The PDF opens on the page once it is ready, usually within a few seconds. Use Open for a new tab or Download to save it. It is also filed in the job's Documents.
  3. Printing a day that has not changed since it was last printed shows that same copy rather than filing another one. Make a fresh copy prints it again, for example after changing the diary template.

What happens on its own

  • Equipment scanned Installed from its box label appears under work performed, with who scanned it and their note.

  • The composer drafts each day from the site record and recomposes it as the day goes on, never overwriting a section a person has written.

  • Each person's first sign-in and last sign-out are kept with their hours. A shift closed by the midnight sweep is shown as No sign-out, never as a 16-hour day.

  • Work reported comes from each person's end-of-day sign-off on the site sign-in: what they ticked, their words and voice notes. A few minutes after they send it, a short AI write-up of their sign-off replaces the raw line, and the section says how many lines are write-ups. Their own words stay on their sign-off.

  • The weather comes from the site's address. If the job has no map location yet, the diary looks the address up once and keeps it.

  • Programme tasks running that day are listed under On the programme today as planned, never as work done. Only site work is listed: orders, shop drawings, workshop manufacture and milestones are left out.

  • A draft nobody finalises is frozen by the system after three days and marked Auto-finalised and Not reviewed, so it is plain that no one checked it.

  • The assistant can top up, open, summarise or finalise a day from chat ("Summarise this week on site", "Finalise the diary entry for today"); the page refreshes when it does.

  • With the diary automations on, the day's close prompts the finalise and an incident on site is announced.

  • Photos your crew add from the site QR while signed in (Add a photo) land in that day's photos with the caption they wrote; Base's own captioning never replaces a person's caption.

  • Automations → Recommended here has Text people still signed in after their usual finish. Turned on, it texts anyone on this job who is still signed in 45 minutes after their usual finish a link to their end-of-day sign-off, so their report reaches the diary. It is off until you switch it on, because texts cost money. Turn it on from Timesheets instead to cover every job.

  • Recommended here also has Text the person who reported an incident when it is dealt with: marking a report dealt with on Safety texts whoever reported it. Off until you switch it on; your review note is not in the text.

  • With the Weekly Client Report pack on, each Friday afternoon the week is written up for the client and emailed to each client contact with their sign-in link (the sign-in page with their address filled in), or left as a draft for you to approve. It leads with the photo updates you published to the client that week, in your words, then adds the week from the diary as a headcount, never names, hours or costs. Updates you hid from the client, or a job not sharing photo updates, are left out.

Things that surprise people

  • A day with no sign-in, report, form, photo or completed order has no entry. The diary does not invent a quiet day.
  • A finalised entry cannot be edited, by design: it is the record you send to a client or produce in a dispute. Revision notes are how it changes.
  • A day marked Not reviewed was finalised by the clock, not by a person. It is honest about that on the PDF too.
  • The AI summary is a reading of the record, not part of it. It is kept beside the day, never printed on the PDF, and can be rewritten on a signed day without changing what was signed. Check anything that matters against the record itself.
  • Today's diary shows someone still signed in as On site. If they never sign out, the next morning's diary shows No sign-out for them.
  • A tick on a sign-off is what the site said. Nothing moves on the programme until someone here presses Mark on programme.
  • A finalised day still offers Notice of delay and Variation. They write nothing into the day, so the signed record stays as it was.
  • The notice of delay never fills in the time claimed or a new completion date. Only you know what that delay cost the job, so you write it.
  • The buttons show only to someone who can raise variations (Variations → Edit) or make documents (Documents → Generate & send).
  • Labour hours here come from sign-ins and are for the record. Costed hours are the approved ones on Timesheets.
  • Site home for the roll call the labour section is built from.
  • Defects and Safety for what feeds the safety section.
  • Variations for pricing a variation raised from the diary and the time it claims.