In this guide
Site home
The supervisor's phone page: who is on site, gates, what needs a person.
What it is
The supervisor's page, built for a phone. The line under the title gives the day, when the page was last read and switch job; under it, a band gives the day in three figures: how many people are on site now, how many of today's bookings are here, and how many shifts need tidying. Below it, whatever needs you comes first (people asking for a PIN from the site QR, who was refused or warned at the gate, shifts to tidy), then who is signed in right now grouped by company with any gate warnings against them, who is booked today, and who the plans expect today. Site in the nav outside a job goes straight to the site home of your one live job, or lists the live jobs to pick from (your own first, busiest first); switch job on the page brings the list back. The list opens with how many people are on site across how many jobs, and each job card shows a green dot and how many are signed in, or No one signed in.
Deliveries, inspections and RFIs lists what else is due today and the next working day: goods to arrive, inspections, hold points not cleared and RFIs holding up work.
Before you start
- The Timesheets module is on (Settings → Team Modules). The roll call is timesheet data. With it off the page says Timesheets is not switched on, even from an old link.
- To approve access requests you also need the Crew roster module, because approving sets a PIN.
- The job has a QR poster at the gate (see Crew and timesheets on a job).
- Deliveries, inspections and RFIs shows each part only if you hold its module: deliveries need Subcontractors (they are purchase orders), inspections and hold points need Programme, and RFIs need Drawings & RFIs.
How to
Take the roll call
- Open Site home. The first figure is how many people are on site now, with how many are crew, subbies and visitors under it. Tap a figure to jump to its list.
- The chips under the figures say what needs attention: waiting for access, refused at the gate, signed in with warnings, booked but not here, shifts to tidy, hold points not cleared, deliveries late. Tap one to jump to it. When nothing is waiting, one line says so instead.
- On site now lists everyone with an open sign-in, by company, with when they arrived and how long they have been on. A badge says Not inducted, Signed in twice or Open 10h+ where it applies, and a phone icon calls them.
- To sign someone out who has left, tap their name to open the row, then Sign out on their behalf. Enter the time (site time) and Save.
Approve someone asking for access
- Under Waiting for access, each request shows the name, mobile and when they asked.
- Approve and text PIN picks a PIN and texts it to them; they can then sign in at the QR. Decline removes the request after you confirm.
Tidy shifts
Under Shifts to tidy: Set sign-out for someone still signed in from an earlier day (the standard break is applied); Merge into one for someone signed in twice today (keeps the first sign-in time, closes the extra at zero hours); Set real sign-out for a shift that was closed automatically at 11:59 pm, before the hours are approved.
Check the gate
Booked today lists companies booked on site from the programme, marked Not here or Left site. At the gate today lists each refusal or warning with its reason (no SWMS, insurance expired, no white card, not engaged on this job, and so on). It sits near the top while there is anything in it; on a quiet day it is not shown, and the line under the figures says no one has been refused or warned.
See who is expected today
Expected today shows who the programme, the week plan and subcontractor start dates put on this job today. The colour says how sure the plan is (booked, pencilled in, programme only, mobilising) and a tick means they have signed in. Not on the plan lists companies who signed in without being expected. On leave today names anyone on this job's crew whose leave was approved on Timesheets → Leave. The section only appears when there is something to show, and only if you can see the company-wide Timesheets page.
See deliveries, inspections and RFIs due
- Deliveries, inspections and RFIs lists what is due today and the next working day (Monday, when it is Friday). It moves up among the things that need you when a delivery or an RFI is late, or a hold point is due today, late, or has work started under it. Two chips at the top say how many hold points are not cleared and how many deliveries are late.
- Deliveries are purchase orders not yet received, by the supplier's date, or the date site needs them when the supplier gave none. A late one stays listed for two weeks. Press the arrow to receive it on the job's Purchase Orders.
- Inspections and hold points lists the inspection milestones on the programme and the hold points not cleared. Fill the ITP opens the hold point's form. Press the arrow to record a hold point passed on the job's Hold points page.
- RFIs holding up work lists open RFIs marked as holding up the programme, whatever their date, with Answer due in amber once it has passed. Press the arrow to open them on Drawings & RFIs.
Nothing here receives goods or passes a hold point; each row takes you to the page that does.
Capture something quickly
Three shortcuts at the top: Diary note opens the Site diary, Defect + photo opens a new defect with the camera ready (Defects), Incident opens the incident form.
Post a notice to your crew
- Under Notice to the crew, below the shortcuts, type the notice, for example "Gate 2 is shut tomorrow, use the Smith St entry". It can be up to 320 characters.
- Show until starts a week from today; press it to pick another day up to a month away from the calendar.
- Press Post to the crew.
Your crew on this job see it when they sign in at the gate, until that day. A new notice replaces the one before. Clear takes it down. The line above the box says how many of your crew it reaches, and whether it is texted too. Posting and clearing need the Timesheets edit permission; anyone else sees the current notice and nothing to type in.
What happens on its own
- Shifts nobody signed out are closed automatically at 11:59 pm and listed under Shifts to tidy rather than quietly accepted.
- Gate checks run at sign-in from the subcontractor's compliance documents and the worker's tickets. A refusal or a warning is recorded against the day.
- Your own crew are checked too when you keep their tickets: At the gate today lists a crew member refused on an expired white card, or let in with a ticket warning, under your business's name.
- The page refreshes itself when a shift changes.
- With Text someone whose site access request was declined switched on (Automations → Library → Site supervisor, off until you turn it on, because texts cost money), a declined request texts the person to say it was not approved and to talk to the site supervisor. An approval already texts their PIN, so with it on they hear either way.
- With Text your crew a site notice switched on (Timesheets → Automations, off until you turn it on), each notice you post is also texted to your crew on this job who have a mobile.
Things that surprise people
- A worker who says they are not fit for work on the gate form is still let in. The shift records it and the supervisor is told; the gate does not turn them away.
- Hours are approved on the company-wide Timesheets page, not here. Nothing costs to the job until they are.
- Tidy the auto-closed shifts before the hours are approved; an 11:59 pm sign-out approved as-is becomes paid hours.
- A job has one notice at a time. It goes to your own crew only, never to subcontractors' workers or visitors at the gate.
- The notice text is never sent between 9 pm and 7 am. Post one at 9:30 pm and it is texted at 7 am, if it is still the notice up then; a notice you cleared or replaced overnight is not texted at all.
- Six notices a day per job is the limit, because each one can text the whole crew.
Related
- Crew and timesheets on a job for the QR poster and the roster.
- Site induction for what Not inducted means.