Maintenance requests
The queue of maintenance, defects, warranty claims and emergencies your clients log against their shops — triage, quote, book, sign off.
What it is
Maintenance (under Build in the sidebar) is one queue of everything your clients have logged against their shops on the client portal: break/fix maintenance, defects inside the defects liability period (DLP), warranty claims, small works and emergencies. Each request carries an SLA clock, who is on it, whether it is chargeable, the quote, the visit and the thread with the client. The red number beside Maintenance in the sidebar is how many requests are waiting for someone to triage them.
The rule it runs on: quote first, then the client approves. Defects inside DLP and warranty items are no charge. A quote at or under a shop's pre-approved limit goes ahead without waiting.
Before you start
- Add the shops. Open Sites & access and press Add a shop. Start From a project where you can: the name, address and client come across, and you add the practical completion date. A shop in DLP gets a DLP end date (blank means 12 months after completion). The address puts it on the map.
- Optionally set a Pre-approved limit (inc GST) on a shop. A chargeable quote at or under it is approved straight away and the client is told so.
- Give the client's people access. Under Client portal access, pick the client login and the client company, then Give access. Untick Approves quotes for someone who should only follow requests, or set a limit so quotes above it need someone more senior. Only an admin can give or remove access.
- Client login lists your client logins, including every client contact on one of your jobs who has signed in to their portal with an emailed code (marked client portal). They have no login in your business, and do not need one. It also lists every client contact with an email address on one of your jobs who has not signed in yet, marked not signed in yet. Give one of them access and it shows under Client portal access as not signed in yet; it becomes theirs the first time they sign in to their portal with that email address. If someone is not listed, add them as a contact on one of their jobs with their email address (the job's Client → Contacts).
- Or let the job's client log from the job they already open. Add the shop From a project for that job, under the job's own client company, and set it to DLP or a plan. From then on, after handover, the job's page in their portal shows Maintenance under Handover: what has been logged for the job, and Log a request for a client contact who is signed in. Nobody needs maintenance access for that. Approving quotes in the portal and getting the emails still do. Nothing prompts you to add the shop at handover, so add it when you hand over.
- Log on behalf needs permission to change requests (Maintenance → Edit under Settings → Team Modules). With view only, the page says so instead of showing a form you could not send.
How to
Read the queue at a glance
The pane at the top of Requests leads with how many requests are Past SLA (amber when any are), with how many are due within 24 hours beside it. Next to it: Awaiting triage (with any emergencies and how long the oldest has waited), Quotes out (inc GST, and how many wait on the client) and Under DLP. Press Awaiting triage or Quotes out to filter the table to those. The head of the pane carries the ninety-day record: how many were responded to on time, the mean response, the client rating, and any possible recalls, jobs ready to invoice and repeat shops. The strip along the foot opens the request that has waited longest for triage.
Search, Table / Map and the status filters sit in one row under it; Requests / Sites & access and Log on behalf sit beside the title.
Triage a new request
- Requests awaiting triage sort to the top of the table. Click one to open it in the rail on the right, or press the strip at the foot of the pane to open the one that has waited longest.
- Check the coverage block. It shows what the intake decided from the shop: chargeable, DLP defect, warranty or call-out. Change it with the chips if it is wrong.
- Set Priority (this moves Respond by), Assign to a crew member or a subcontractor, and the Trade. If Base read a different trade or urgency from what the client wrote, it says so with an Apply link.
- Press the main action for the coverage: Send quote, Accept as defect, Lodge warranty claim or Confirm call-out.
- If nobody at the client has maintenance access, an amber line under the request says so: nobody gets an email from here, and it shows how to reach whoever logged it (what they gave, else their contact's phone and email).
Send a quote
- Press Send quote. Enter the amount inc GST, the time on site and what is included.
- Press Send quote. The client's people with maintenance access get an email and an Approve button in the portal. The request shows quoted until they decide. With nobody given access, the message says nobody got it: ring them for their answer.
- If the client says yes by phone, press Approve on their behalf and note who approved it and how.
- Nudge for approval sends a reminder in the thread and by email.
Book the visit and finish
- Press Schedule a visit, pick the date and time and add a note if you like. The client's people with maintenance access are emailed, and the portal shows the visit. With nobody given access, the panel tells you to let the client know yourself.
- On the day, Mark in progress.
- When it is fixed, Mark done. Write what was done (the client reads it) and add an after photo. The client is asked to confirm it is fixed and rate the job. They can reopen it within 14 days.
- Chargeable work: Ready to invoice marks it for your invoicing.
Back-charge the subcontractor
- On a defect or call-out, press Back-charge sub.
- Pick the responsible subcontractor, the estimated cost and the days they have to fix it (8 by default), and note the evidence.
- Press Email notice. Base emails the written notice to the subcontractor (their company email, or their contacts') and records it once it has gone; their days to rectify run from then. If they have no email address in Contacts, nothing is recorded — add one, or serve the notice yourself.
- Served it yourself, by hand or by post? Enter the Day served instead and press Record notice: the days run from that day and nothing is emailed.
- It stays internal — the client never sees it. Update its status (accepted, disputed, rectified, recovered, waived) from the rail as it moves, and state the deduction on their next payment schedule.
Reply to the client
- Type in the box under the thread and press Send. The client sees it in the portal, and on their job's page when the shop is linked to the job. Their people with maintenance access get an email; nobody else does.
- Tick Internal note for something only your team should see.
- Suggest a reply drafts one from the request and the thread. Read it, press Use this, edit and send. Nothing is sent until you press Send.
Log a request for a client
- Press Log on behalf.
- Pick the shop, type who called in On behalf of, and fill in the form as the client would.
- Log request. It lands in the queue and on the client's portal like any other.
Turn a request into a job
Press Convert to job on a request that has outgrown maintenance. A project is created as quoting, numbered after the request, for that client and shop, and the request links to it.
Book the end-of-DLP defects walk
When a shop's DLP ends within six weeks, a banner names it. Press Book defects walk to log a planned defect request for walking the shop with the client before the period closes.
What happens on its own
- Every request is numbered (MR-0143), timed and given a respond-by from its urgency: emergency 4 hours, urgent 24 hours, standard 5 business days, planned none. Once someone acts on it, a resolve clock runs: 24 hours, 3 business days or 10 business days.
- The resolve clock stops while a quote is waiting on the client and starts again when they decide.
- Accepting a defect adds it to that project's defect register. Marking it done marks the defect rectified.
- The defect is marked fixed in your name, whether you press Mark done or ask the assistant to. The job's site supervisor is told to check it; you are not told about your own fix.
- The client's people with maintenance access are emailed when you quote, book, finish, reject or reply. Your admins get a notification for each new request (emergencies and urgent ones flagged) and each client approval or reply.
- The table and the badge update live when a client approves a quote or replies.
- Access given to a client contact who had not signed in yet becomes theirs the first time they sign in to their portal with that email address (an emailed code, or Google or Microsoft confirming the address). It then shows as an ordinary login under Client portal access.
- A request a client logs from their job's link arrives like any other, raised by the client with their contact's name, and its site contact says how to reach them. They are not emailed about it unless they have maintenance access: they read your replies and its status lines under Updates on the job's page, and cannot approve a quote there. Ring them for an answer and record it with Approve on their behalf, or give them access when they should approve quotes and get the emails.
- Every open request is also a task in Tasks — on the job when the shop is linked to one, otherwise under Operations. It belongs to the crew member you assign (with a subcontractor, to the job's head PM), is due when the next clock runs out or on the visit day, and moves along with the request. It closes itself when the request is done, rejected or turned into a job.
- When you move a shop to another client, its open requests move with it, and the previous client's logins stop seeing them. Finished requests stay with the client they were done for. A quote that is waiting is sent to the new client's logins.
- Changing a shop's pre-approved limit records who changed it and when, and the old and new amounts go in the event log. Only an admin can change it.
- Every change to a request's cover leaves a line on the request that only your team sees.
- When a request has less than a day left to respond or to fix, the crew member on it and the job's head PM (or your admins) get a notification, and another if the deadline passes. Each is sent once per deadline.
Things that surprise people
- Access you give someone who has not signed in yet waits on that contact and the email address they had when you gave it. Change the contact's email, or take them off the job, before they sign in and nobody gets it — give it again. Until they sign in they hear no maintenance emails and cannot approve a quote.
- You cannot schedule chargeable work that has not been approved. Send a quote first. No-charge work (defect, warranty, call-out) can be booked straight away.
- A defect logged against a shop outside its DLP is stored as maintenance and charged. The client is told so on the form.
- Something fixed at the same shop in the last 30 days that comes back is flagged possible recall and linked to the first request, so it goes back to whoever did the work.
- Quotes are valid for 30 days. An expired quote cannot be approved; send a revised one.
- Once a request is triaged, its cover can only move in the client's favour (a chargeable job can turn out to be a defect). A no-charge job cannot be made chargeable — log the chargeable work as a new request and quote it. Call-out cover is only for emergency requests.
- Work the client reopens goes back to approved — book the return visit; it does not need a new quote. A request already marked ready to invoice stays that way when the client reopens it, and an invoiced one stays invoiced. A rejected request reopened by you goes back to triage.
- If someone else changes a request while you are deciding its cover, your change is refused. Refresh and decide again.
- Clients see your team by name on replies and decisions, never by email address. A team member with no name on their profile shows as Team, or as Crew member when assigned.
- A quoted job that turns out to be a defect or a warranty item: press Accept as defect or Lodge warranty claim — that withdraws the quote and tells the client.
- A client whose quote is over their approval limit sees the quote but no Approve button.
- The inbox shows amounts inc GST, as the client sees them. They are stored ex GST with the GST beside them.
- A request's SLA in the table is coloured only when it needs you: overdue or missed in red, at risk in amber. Time left, a booked visit and a met SLA read in grey.